Newry Mourne and Down District CouncilNewryTED
ITT 31/2026 Multiquote Ref CA18360 - PEACEPLUS PP1024 Schomberg Society Kilkeel Refurbishment Project Retender
TENDER REF: ITT 31/2026 Multiquote Ref CA18360 PP1024 - Schomberg Society Kilkeel – Upgrade & refurbishment Works Retender Applications are invited from Contractors, under the terms of the NEC4 ECSC Short Contract, for PEACEPLUS Project: Schomberg Society Kilkeel – Upgrade & refurbishment Works: A combination of mechanical and electrical ...
Plumbing, Heating & Air Conditioning, Electrical Installation, Shell Construction, Non-Residential Building
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Newry Mourne and Down District Council
- Published:
- August 19, 2026
- Deadline:
- September 19, 2026
- Topic:
- Plumbing
- Object:
- Gemeinde- / Bürgerzentrum
Object classification
- Gemeinde- / BürgerzentrumPrimary
Tender description
Show full descriptionCollapse description
TENDER REF: ITT 31/2026 Multiquote Ref CA18360 PP1024 - Schomberg Society Kilkeel – Upgrade & refurbishment Works Retender Applications are invited from Contractors, under the terms of the NEC4 ECSC Short Contract, for PEACEPLUS Project: Schomberg Society Kilkeel – Upgrade & refurbishment Works: A combination of mechanical and electrical upgrades, and general refurbishment activities across multiple areas of an existing operational community facility. The works will be for Working in Occupied Premises – 45211000-9, General Construction Work – 45210000-2, Refurbishment over 15K – 45453100-8, Washroom Systems – 45330000-9, for a period of 6 weeks and will commence not before Late September 2026. The estimated cost of the project is £92,908.00 excluding VAT. To access this opportunity, log in to https://suppliers.multiquote.com and view the opportunity. If you are not registered with MultiQuote, please visit https://suppliers.multiquote.com, complete the registration form on the log in page and quote the title and reference of the notice in your registration. Signed: Mrs Marie Ward Chief Executive All relevant submissions to be received on or before 12 Noon on 9th September 2026. A project supported by PEACEPLUS, a programme managed by the Special EU Programmes Body (SEUPB).
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Procedure data
Unlock5 details capturedPublication number · Buyer reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10ITP 52/2026 - Multiquote Ref CA18370 Bessbrook Community Centre - New Mini Digi Hub
Newry Mourne and Down District CouncilNewryDeadline: Sep 23TENDER REF: ItP 52/2026 Multiquote Ref CA18370 Bessbrook Community Centre - Creation of New Mini Digi Hub A project supported by PEACEPLUS, a programme managed by the Special EU Programmes Body (SEUPB). Competent Contracting companies are hereby invited to tender to deliver Bessbrook Community Centre Upgrade and Refurbishment Works. Extension and various internal Works required as part of the creation of a community Digihub. The estimated value, excluding VAT, of the Contract is £527,675.00 The estimated value, including VAT, of the Contract is £633,210.00 To access this opportunity, log in to https://suppliers.multiquote.com and view the opportunity. If you are not registered with MultiQuote, please visit https://suppliers.multiquote.com, complete the registration form on the log in page and quote the title and reference of the notice in your registration. Signed: Marie Ward Chief Executive All relevant submissions to be received on or before 17th September 12pm. A project supported by PEACEPLUS, a programme managed by the Special EU Programmes Body (SEUPB).Tender 40/2026 SAUL Theme 1 Upgrade Works to Clubhouse Facilities PP1018
Newry Mourne and Down District CouncilNewryDeadline: Aug 21EXTENDED CLOSING DATE TENDER REF: 40/2026 SAUL Theme 1 - Upgrade Works to Clubhouse Facilities – PP1018 Applications are invited from Contractors, under the terms of the NEC4 ECSC Short Contract, for the following project: SAUL Theme 1 - Upgrade Works to Clubhouse Facilities – PP1018. The works will be carried out in Occupied Premises for a period of 6 weeks and will commence not before mid-August 2026. The estimated cost of the project is £84,420.00 excluding VAT. To access this opportunity, log in to https://suppliers.multiquote.com and view the opportunity. If you are not registered with MultiQuote, please visit https://suppliers.multiquote.com, complete the registration form on the log in page and quote the title and reference of the notice in your registration. Signed: Mrs Marie Ward Chief Executive CLOSING DATE EXTENDED - All relevant submissions to be received on or before 12 Noon on 31 July 2026. A project supported by PEACEPLUS, a programme managed by the Special EU Programmes Body (SEUPB).PEACEPLUS - Distillery Street Open Space
Belfast City CouncilBelfastDeadline: Aug 28**NOTE this is not an above threshold exercise but is a notice to highlight this tender is live on eSourcing NI** The contract is for the provision of Distillery Street Open Space The contract is for the provision of the Distillery Street Open Space project, comprising the construction and completion of a new public open space and associated site works. The works are expected to include, but are not limited to, site preparation and enabling works, earthworks and grading, hard and soft landscaping, planting, paving, street furniture, lighting, drainage, utility coordination, accessibility measures and other associated infrastructure necessary to deliver a high quality public open space. The project is located within a live urban environment and will require careful planning, programming and stakeholder management to minimise disruption to surrounding residents, businesses and ongoing development activities. The works will be undertaken in accordance with all relevant statutory requirements, health and safety legislation, environmental obligations and project-specific quality standards. The Contractor will be responsible for delivering the works in accordance with the contract documents and programme, achieving all required milestones and handover requirements, and ensuring that the completed open space is fit for purpose and meets the Employer's objectives for quality, sustainability and community benefit.VA Sletteveien-Karstensens vei AN2221
Fredrikstad kommuneFREDRIKSTADDeadline: Sep 21The contracting authority hereby invites tenderers to a competition for a contract for a water and sewage project for Sletteveien-Karstensens vei. The procurement includes approx. 2,200 metres pipeline ditch (separation) and a new pumping station for sewage on residential streets at Lisleby. The project also includes re-establishment of road lighting installations on parts of the stretch (Karstensens vei) and upgrade of the sidewalk in Lislebyveien. The project will be carried out as an execution contract in accordance with NS8405. A comprehensive description of the delivery is in the annexes to the tender documentation.Lieferung, Installation und Inbetriebnahme von 132/33KV Leistungstransformatoren in Mosta und Marsa North DC sowie 20MVAR Reaktor in Marsa North
Enemalta plcMarsaUpgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí
Údarás Na Gaeltachta_289GalwayThe proposed works will include internal modification, the construction of an extension (10m2), a glazed entrance lobby and a covered outdoor area, replacement of the existing wastewater treatment system and percolation area with a packaged Wastewater Treatment System and all associated works.St. Ciaran's Community School Kells
St.Ciaran’s Community School (Kells)KellsDeadline: Aug 13St. Ciaran’s Community School is a primary school that is located in Kells, Co. Dublin. The school is a two storey building consisting of classrooms, GP hall and technology block extending to 5,000m2. This project entails works in decommissioning and replacing the existing emergency lighting and fire alarm system installations throughout the building. Refer to the drawings for further information on the works to be carried out. The scope of the works will be as follows: • Remedial works to the existing electrical boards throughout the building to cater for the new emergency lighting installation. • Decommissioning and replacing of the existing emergency lighting installation throughout the building and installation of a new emergency lighting installation that shall be compliant with I.S. 3217:2023 throughout the building. • Decommissioning and replacing of the existing fire alarm installation throughout the building and installation of a new fire alarm installation that shall be compliant with I.S. 3218:2024 throughout the building. • Supply and installation of a new cable carrier system throughout the school building to cater for the proposed new fire alarm and emergency lighting installation to be installed. • The existing ICT system installation, intruder alarm system, PA system and CCTV system installation shall be retained throughout the building. • All electrical works as highlighted on the drawings and the specifications. • Thorough cleaning of the building via contract cleaners once all works are completed so that the building is clean and tidy for re-opening of the building for the new term. • All associated preliminaries for the project. Unit A6, M4 Business Park, Maynooth Road, Celbridge, Co. Kildare, W23 VFY7 (Tel: 01-6274103) ____________________________________________________________________________________________________________________________ _________________________________________________________________________________ • All associated decommissioning works. • All builders’ works associated with the above. See ‘Builders Work Schedule’ in ‘Volume C1 – Pricing Schedule’ for further details. • Acting as Project Supervisor Construction Stage for the project. • Carrying out all works in compliance with current health and safety regulations. • Any other works as identified on the drawings and the specifications.Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme
Dublin City CouncilDublinDeadline: Aug 27Dublin City Council aims to enhance the quality of life for its residents by developing an integrated Active Travel Network. This comprehensive network is designed to foster connections among individuals via pedestrian pathways, segregated cycle provision, and other environmentally friendly transportation alternatives. The enhancement of accessibility and interconnectivity for people walking, wheeling and cycling within this network is anticipated to play a pivotal role in mitigating carbon emissions originating from transport activities. The council’s objective is to augment the existing 40km network into a seamlessly connected 314km network spanning the entire city. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme is one of the projects identified under this initiative. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme extends along Milltown Road between Dodder walk and Dundrum Road for a length of 1.2km. The Scheme includes the provision of segregated cycle facilities, improved pedestrian facilities (footpath and junction upgrades), ducting, resurfacing etc. the scheme also includes the upgrade of two signal-controlled junctions to improve pedestrian and cyclist facilities, the two junctions are: Milltown Rd and Churchtown Rd junction and Milltown Rd and Dundrum Rd junction. The Scheme comprises: - Re-configuration of existing carriageway for inclusion of cycle provision - Site Clearance - Pavement works - Kerbs and Footways - Traffic Islands - Public lighting - Traffic signs and road markings - Drainage works - Traffic signals and Ducting - Utilities upgrades - Landscaping and Urban Realm Works - Bus Shelters (foundation only) - Bike Stands - Temporary Traffic Management Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8702210Café Inis Meáin – Fit-Out, Landscaping and Equipment Supply
Seán Ó DomhnaillAran IslandsDeadline: Aug 21This procurement relates to the fit-out, furnishing, landscaping and completion of a new café development at Inis Meáin, County Galway. The project comprises the supply of equipment, specialist furniture, building materials, mechanical and electrical equipment, sanitaryware, fire safety equipment and construction-related works required to complete and commission a fully operational commercial café. The procurement has been divided into multiple lots to encourage competition amongst specialist suppliers and contractors. Tenderers may submit tenders for one, several or all lots. Unless otherwise stated within the relevant lot specification, tender prices for the supply of equipment and materials shall include delivery to the designated mainland delivery location at Lasta Mara Teo, Galway Docks, H91 YTK2.Rohbauarbeiten
Krefelder Bau GmbHKrefeldDer Neubau umfasst drei Vollgeschosse und ein Dachgeschoss. Unter dem Gebäude entsteht eine Tiefgarage, die nahezu die gesamte Grundstücksfläche einnimmt. Die Obergeschosse werden überwiegend in Stahlbetonbauweise mit Kalksandsteinwänden errichtet; wandartige Träger und die Aufzugsschächte bestehen ebenfalls aus Stahlbeton. Alle tragenden Bauteile im Untergeschoss sind aus Stahlbeton ausgeführt. Aufgrund der innerstädtischen Lage sind immissionsarme Bauverfahren erforderlich.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 19. September 2026.
- Who is the contracting authority?
- The contracting authority is Newry Mourne and Down District Council.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.