Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornTED
International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarb...
Digitalisation Consulting, Energy Consulting, Management Consulting
No credit card · Instant access
Content at a glance
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammen...
- Tender type:
- Tender
- Contracting authority:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Published:
- July 28, 2026
- Deadline:
- Not specified
- Topic:
- Digitalisation Consulting
Tender description
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contribut
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contribut - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. - Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO)Den Haag
Database containing information on renewable energy
The Contract concerns the supply of a database providing comprehensive coverage of both renewable energy sectors and existing energy sources. The database shall, at a minimum, include coverage of the following markets: • Wind Sector • Solar Sector • Gas Sector • Power Sector • Carbon Markets • Advanced Transport • Biofuels • Electrified Transport • Advanced Transport Infrastructure deployment • Natural Gas Vehicles • Energy Efficiency • Energy Storage • Smart Grid • Coal sector • Oil The data base has to cover at least the following continents • Europe • Middle east • Africa The data base has the contain features regarding the transitions for a sustainable future in the sectors mentioned below • Clean power • Transport • Buildings & Industry • Agriculture The complete discription can be found in the annex with this announcement The subscription to the database shall have an initial term of twelve (12) months), with an option to extend for an additional twelve (12) months under the same terms and conditions. The subscription shall provide access for seven (7) autorised users. - Norges vassdrags- og energidirektorat (NVE)OSLO
Framework agreement for consultancy services for the further development of NVE ́s GIS infrastructure based on Esri technology.
The Norwegian Water Resources and Energy Directorate (NVE) would like to enter into a framework agreement for assistance with various assignments for the further development of NVE ́s GIS infrastructure, which is based on Esri technology and platform. GIS is an abbreviation for Geographical Information Systems. - NorecFØRDEDeadline: Aug 21
Procurement of consultancy for the Evaluation of Energy Programming under the Civilian Component of the Nansen Program for Ukraine and Moldova
This evaluation focuses on outcomes and impacts in the energy sector, assessing the causal logic linking energy support to wider civilian outcomes within the Nansen Program Theory of Change, contribution pathways, cross-sector interactions, unintended effects, and the conditions under which different approaches may be sustained or expanded. Understanding how energy investments translate into broader resilience outcomes, and how they interact with Norwegian donor mechanisms and other portfolio elements, is essential for prioritization and resource allocation. Furthermore, since maintaining short-term system stability, protecting civilians, and advancing longer-term transition goals do not always align perfectly, the resulting trade-offs are central to understanding programming choices and outcomes. The evaluation covers the civilian component of the Nansen Support Program from its inception in February 2023 through July 2026. - Møre og Romsdal FylkeskommuneMOLDE
Framework agreement for the development of the Panda model
The aim of the procurement is to enter into a framework agreement for consultancy services for the development of the Panda model. The contract will be valid for 2 years, with an option for an extension for 1+1 year. The contract has an estimated value of approx. NOK 4,000,000 excluding VAT (approx. NOK 1,000,000 per annum in the contract period). The contract value is estimated and the contracting authority is not bound by this, as the contracting authority ́s need can vary from year to year. See the assignment ́s description for further information (Annex 2) and the Requirement Specifications (Annex 3). - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
81320099-Conducting a wind measurement campaign - Lot 1
As part of Tunisia"s ongoing energy transition strategy, the country is accelerating its shift toward sustainable, low-carbon energy sources and intensifying efforts to harness its wind energy potential. In this context, the project APSTII "Up-scaling private sector investments in renewable energy in Tunisia", mandated by the Ministry of Industry, Mines and Energy (MIME) and the Ministry of Economic Cooperation and Development (BMZ) and implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ), is launching an international call for tender to conduct a wind measurement campaigns on three priority sites in Tunisia. The objective is to obtain bankable wind measurement data compliant with MEASNET and IEC 61400-50-1 standards. The assignment is divided into three lots : Lot 1 (81320099) - Jbal Abderrahmen (Nabeul Governorate): installation, operation and dismantling of seven 125 m met masts with their accessories. Lot 2 (81320100) - Jbal Tbaga (Kébili Governorate): installation and operation and dismantling of seven 125 m met masts with their accessories Lot 3 (81320101) - El Guettar (Gafsa Governorate): installation and operation and dismantling of two 125 m met masts with their accessories. Bidders may apply for one, several, or all lots. Each lot will be evaluated separately. The scope of services fo each lot includes: - Preparation and installation of the wind measurement camapign: site visits, installation and commissioning of 125 m met masts with calibrated equipment. - Data collection and analysis: operation of the masts over 12 months, daily monitoring and data transfer, validation and reporting of high-quality meteorological data. - Decommissioning: dismantling of the equipment at the end of the campaign, restoration of the sites, and submission of a decommissioning report. - Capacity building: two workshops to strengthen national stakeholders" ability to interpret and use wind measurement results. The contractor"s services will provide Tunisia with high-quality, bankable & certified wind resource data, ensuring that future wind tenders for these 3 sites are based on robust, and compliant with MEASNET and IEC 61400-50-1 standards. The contract duration is 14 months (2026 - 2027). Bidders may submit offers for one, several or all lots.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.