The Office of the Director of Authorised Intervention TuamGalwayTED
Geomatics Supervisor
The Geomatics Supervisor will be responsible for the gathering, managing and processing all geospatial data on the excavation, and will report to the Site Co-ordinator. The Geomatics Supervisor will work with the forensic excavation team at Tuam and be primarily responsible for the gathering, managing and processing all geospatial data on...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- The Office of the Director of Authorised Intervention Tuam
- Published:
- July 30, 2026
- Deadline:
- Not specified
Tender description
The Geomatics Supervisor will be responsible for the gathering, managing and processing all geospatial data on the excavation, and will report to the Site Co-ordinator. The Geomatics Supervisor will work with the forensic excavation team at Tuam and be primarily responsible for the gathering, managing and processing all geospatial data on the excavation.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8Phase Two: Forensic Framework Lot 4 and Lot 5
The Office of the Director of Authorised Intervention TuamGalwayLOT 4 - Site Forensic Archaeologists / Site Archaeologists - ODAIT seeks the services of full-time Forensic Archaeologists and Archaeologists with experience of extensive excavation experience to work on site as part of a multidisciplinary team undertaking the recovery of human remains and other evidence from the Tuam Site in accordance with the Institutional Burials Act 2022 and forensic best practice. LOT 5 - Site Human Osteoarchaeologists / Site Forensic Anthropologists - ODAIT seeks the services of Human Osteo-archaeologists / Forensic Anthropologists to work on site full time, as part of a multidisciplinary team undertaking the recovery of human remains recovered from the Tuam Site in accordance with the Institutional Burials Act 2022 and forensic best practice. These individuals will be required to work as part of a multidisciplinary team who are recording and excavating human remains and associated evidence from the site of the former ‘Mother and Baby Home’ at Tuam, Co. Galway.Construction of a Viewing Platform on IDA Lands at Athenry, Co. Galway
IDA IrelandDublinThe contractor shall be responsible for re-construction of an existing on-site viewing platform, remedial works to the viewing platform and all associated site works for its construction for IDA Ireland at Ballygarraun South, Athenry, Co. Galway.View PMC workspace
The Office of the Director of Authorised Intervention TuamDeadline: Aug 06The Office of the Director of Authorised Intervention, Tuam (ODAIT), acting as Contracting Authority, is conducting this Preliminary Market Consultation (PMC) to assess market capability and capacity, inform procurement strategy and packaging of services and identify suitably qualified and experienced service providers. This notice is not a call for competition. It is an information-gathering exercise only. ODAIT is considering the procurement of professional services to support archaeological excavation (single context method), forensic recovery under controlled conditions and analysis of human remains in accordance with the Institutional Burials Act 2022, international best practice and forensic standards. Roles under consideration include Forensic Technicians, a team of 6 Archaeologists, a Forensic Pathologist, a Paediatric/Perinatal Clinician, a Post Excavation Manager, a Geomatics Supervisor and a Geomatics Technician. Please refer to the document uploaded as part of this PMC for more details.Forensic Framework Agreement for the provision of services of suitably qualified and experienced professionals to assist in the excavation and recovery of human remains
The Office of the Director of Authorised Intervention TuamGalwayThe services of suitably qualified and experienced professionals (outlined below) to assist in the excavation and recovery of human remains from the Tuam Site in accordance with the standards in the Institutional Burials Act 2022 and Irish archaeology and forensic standards and practices, based on knowledge and understanding of the Site and experience in forensic archaeology. The contract is anticipated to run from 12 to 24 months. For good procurement standards the Office reserves the right to extend the contract beyond this to a maximum of 36 months. The contract value is a combined total of all 6 lots for 36 months duration. Please refer to the Information Note for further clarification on this.Framework agreement for the purchase of traffic registration equipment for motor vehicles at fixed stations.
Statens vegvesenMossDeadline: Aug 31The contracting authority would like tenders for a framework agreement for the purchase of traffic registration equipment for motor vehicles at fixed stations. The Norwegian Public Roads Administration is responsible for collecting road traffic data (further called traffic data) on most european and all national roads in Norway. Nye veier, the counties and municipalities are responsible for collecting traffic data for the other roads. Traffic data will be used, among other things, for traffic management, operation and planning of roads. The Norwegian Public Roads Administration has developed a separate system called the 'Traffic Data System' for the collection, processing and publication of traffic data. Depending on the type of traffic registration equipment (desktop or mobile), data is collected in different ways. Data loggers that are at fixed stations with continuous registration, are connected directly to the traffic data system in a closed network. The communication between the data loggers and the traffic data system takes place over OPCUA. Data from stationary continual stations is retrieved with just a few seconds delay.Procurement of process management
Norges geologiske undersøkelseTrondheimDeadline: Jul 17The aim of the procurement is to enter into a framework agreement with an experienced consultant or consultant in process management who, on behalf of and in close cooperation with the contracting authority (NGU), shall manage and facilitate the clarification phase in project development up until the completion of an OFP report (start-up preliminary project report). The process manager shall be a clear, structured and determined facilitator that ensures progress, involvement and anchoring at the contracting authority. Statsbygg will be responsible for the preparation of the OFP report, but the procured process leader shall ensure a structured and involving process internally at the contracting authority and between relevant actors, so that the necessary clarifications, decisions and basis are available for the work on the report.Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 07Art der Leistung 10037842-Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva Umfang der Leistung The contractor is tasked with delivering three key work packages, each with specific objectives and timelines: 1. Inception Report: The first deliverable will be an inception report that outlines the methodology and planning for the surveys. This report is aimed at establishing a clear framework for survey approaches, data collection, analysis as well as Midline and Endline report structure. Work on this report is set to commence in August 2026, ensuring adequate preparation and planning for the subsequent phases of the project. Regarding the qualitative data collection approach, the contracts should specify a qualitative method applicable to the indicators. The proposed methods may include Key Informant Interviews (KIIs), Focus Group Discussions (FGDs), and direct observation during site visits - are deployed in sequence across the three phases of data collection. Data is analysed thematically and triangulated with quantitative findings before results are finalised Moreover, the contractor will establish a comprehensive, verified, and evidence-based data collection that accurately measures employment, local value addition, export market performance, sustainability certification, MSME processing capacity and IAF service improvement across all targeted indicators. 2. Midline Assessment Report: The second deliverable will be a comprehensive mid-term assessment report, which will evaluate the progress and indicators achievement of the project to date. This report is expected to be finalized and submitted in the fourth quarter of 2026. It will include detailed findings, insights, and recommendations that will guide any necessary adjustments to the project's approach. 3. Endline Assessment Report: The final work package involves delivering a project end-term assessment report, expected in the fourth quarter of 2028. This report will conduct an in-depth analysis of the indicators" achievement, impact and effectiveness of the EU-German CAPSAFE intervention throughout the entire execution period. It will synthesize data collected over the course of the project and provide a thorough evaluation of the results achieved, to some extent offering valuable insights for future initiatives.R400 Peat Pilot Scheme 2026
Offaly County Council_448TullamoreDeadline: Aug 03The re-construction of approx. 1,900m of pavement which is part built over peat, some inlay works, all associated drainage and accommodation works along the R400 Regional Road at Derryiron and Coolcor Td’s Co Offaly. The works consists of 850m of 0.60m of pavement excavation and re-build along with approximately 1,100m of pavement In-lay works.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is The Office of the Director of Authorised Intervention Tuam.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.