Expansion of Tangen sewage treatment plant - Process contract EP1.
The expansion of Tangen Treatment Facility consists of the development of a new treatment stage for reducing nitrogen in the purified sewage water in a separate building, with connection to the existing treatment facility with the necessary adaptations. The delivery will to some extent lead to work in the existing treatment facility. The ...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Midtre Romerike Avløpsselskap - MIRA IKS
- Published:
- August 26, 2026
- Deadline:
- Not specified
Tender description
The expansion of Tangen Treatment Facility consists of the development of a new treatment stage for reducing nitrogen in the purified sewage water in a separate building, with connection to the existing treatment facility with the necessary adaptations. The delivery will to some extent lead to work in the existing treatment facility. The process contract will be executed as an interaction contract based on a modified version of NS 8407.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Related tenders
10Partnering contract for Skjersholmane sewage treatment facility, machinery and process.
Norconsult Norge ASSANDVIKADeadline: Sep 21Stord Vatn and Avløp AS (SVA) invites tenderers to a competition for contract M1 Machine and Process Contract for the project Skjersholmane Treatment Facility. New process engineering installations (this contract) shall be dimensioned for a future expected load on 33,000 pe in 2065. The competition will be held in two stages and a prequalification will be held first and thereafter those who become prequalified tenderers are invited to submit tenders. The zoning plan and emissions application are being processing (at Stord municipality and the government administrator respectively). and both are expected to be approved during 2026. The project is divided into the following contracts: • Contract M1 - Interaction for Machine and Process Contract (this contract) • Contract B1 - Building • Contract B2 - Ground work and emission arrangement. This contract (M1) includes project development, engineering design, delivery, assembly, testing, commissioning and optimisation of process and machine devices and the contract (M1) is divided into two phases; Phase 1 is an interaction phase up to a turnkey contract. Phase 2 is the execution phase for the turnkey contract. The contractor will initially be chosen for both phases in M1 through this procurement.Ethanol for biological treatment of sewage water
Nedre Romerike vann- og avløpsselskap IKSSTRØMMENDeadline: Oct 01A request for a framework agreement with several tenderers for the delivery of ethanol (minimum 80 weight%) for use as a carbon source for denitrification in the biological treatment stage at NRVA ́s treatment facility.26/2944 - E1 Electro for the expansion of Lillevik treatment facility - PHASE 1
Larvik kommuneLARVIKDeadline: Sep 18Larvik municipality shall expand the existing Lillevik treatment facility with new treatment stages. This procurement is for contract E1, which is an execution contract based on NS 8405 with the contracting authority ́s special contract terms. The contract includes electrical installations in both new buildings and alterations, as well as outdoor work. There are separate parallel contracts for construction work, technical work and machine deliveries. Contract E1 is one of a total of 11 planned contracts in this project. The tentative start of the contract work is set for 01.03.2027.The final deadline is provisionally set for 27.07.2029.Contract for the transport, reception and final treatment of hazardous waste.
Oslo kommune v/ Renovasjons- og gjenvinningsetatenOsloDeadline: Sep 30The objective of the procurement is to ensure that the Agency for Waste management and recycling (REG) reaches its goal of collecting all hazardous waste from households. The current sub-contracts for transport and reception of hazardous waste expire 31.12.2026. In order for the agency to offer Oslo municipality ́s inhabitants the services for the receipt and collection of hazardous waste, it is necessary that the agency has contracts that ensure that the hazardous waste is transported to certified reception for further treatment and destruction. The current estimates are uncertain, i.a. due to new possible fractions and how the existing fractions develop.Feasibility Study-Construction of Sewerage Network & Wastewater Treatment Plant
UNDPJordanDeadline: Sep 09The subject of these RFP is the preparation of a Feasibility Study for the construction of a sewerage network with a wastewater treatment plant in the Municipality of Zeta. By adopting the most economically and technically appropriate conceptual solution, the conditions will be created for the development of the sewerage network throughout the territory of the Municipality of Zeta. Please indicate whether you intend to submit a bid by creating a draft response without submitting directly in the system. This will enable the system to send notifications in case of amendments of the tender requirements. Should you require further clarifications, kindly communicate using the messaging functionality in the system. Offers must be submitted directly in the system following this link: http://supplier.quantum.partneragencies.org using the profile you may have in the portal. In case you have never registered before, you can register a profile using the registration link shared via the procurement notice and following the instructions in guides available in UNDP website: https://www.undp.org/procurement/business/resources-for-bidders. Do not create a new profile if you already have one. Use the forgotten password feature in case you do not remember the password or the username from previous registration.Design and Build of five (5) Wastewater Treatment Plants and one Chemical Storage at Thermal Power Plant of Kosovo B, in Kosovo
UNOPSSierra LeoneDeadline: Oct 26Tender description: The United Nations Office for Project Services (hereinafter referred to as UNOPS) is pleased to invite competent Bidders/Contractors to submit their respective competitive proposal to Design and Build of five (5) Wastewater Treatment Plants and one Chemical Storage at Thermal Power Plant of Kosovo B, in Kosovo in accordance with the UNOPS General Conditions of Contract and the “Employer's Requirement”. Tender Timeline : Day 0 (Tender Launch): Monday, August 17, 2026Day 7 (Pre-bid Meeting): Monday, August 24, 2026Day 14 (Mandatory Site Visit & Clarifications Open): Monday, August 31, 2026Day 35 (Clarification Deadline): Monday, September 21, 2026Day 42 (BASE DATE): Monday, September 28, 2026Day 70 (Tender Submission Deadline): Monday, October 26, 2026----- IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/GuidesConstruction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance
Municipality of KolašinKolašinThe work to be carried out under this works contract comprises the permanent works (facilities and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 expanded to 25,000 m3/d, 2052) in Motobas District, Kafr El Sheikh Governorate, to be designed, constructed, and commissioned; the effective restoration of any defects during the 1-year Defects Liability Period; and the optional 1-year of normal operation and maintenance of the works for the WWTP. The contract comprises also the provision of training services to the Procuring Entity’s personnel duly completed within the Defects Liability Period or the Optional 1 year Operation and Maintenance Period as the case may be, and before the works hand-over. Some minor works of the Plant has been executed by another Contractor in a previous phase. Although not part of the Works, the Contractor shall be aware of its obligations toward these Existing Works as defined in the Contract Documents. Average design capacity is 15,000 m3/d (6,000 kg BOD5/d) design horizon 2037 (expanded to 25,000 m3/d, 2052). The Plant will receive influent wastewater from in-system pumping stations and treated effluent will be discharged to Zaghloul Main Drain. Process involves Extended Aeration Activated Sludge and shall target carbon, nitrogen and suspended solids removal and sludge stabilization.Call for tenders for transport and treatment of slag from the WTE plant Hammel Fjernvarme.
Dansk RestproduktHåndtering AmbaOdenseDeadline: Sep 18DRH calls for tenders for transport and utillization of slag from the Danish Waste to Energy Plant Hammel Fjernvarme. With this call for tenders DRH intend to contract transport and utilization of up to 5.000 t/Y of raw slag. For further information please refer to the tender documents.Call for tenders for transport and treatment of slag from the WTE plant MEC-BioHeat&Power A/S, Holstebro.
Dansk RestproduktHåndtering AmbaOdenseDeadline: Sep 29DRH calls for tenders for transport and utillization of slag from the Danish Waste to Energy Plant MEC-BioHeat&Power A/S, Holstebro With this call for tenders DRH intend to contract transport and utilization of up to 30.000 t/Y of raw slag. For further information please refer to the tender documents.Call for tenders for transport and treatment of slag from the WTE plant Nordværk Affaldsenergi Aalborg.
Dansk RestproduktHåndtering AmbaOdenseDeadline: Sep 18DRH calls for tenders for transport and utillization of slag from the Danish Waste to Energy Plant Nordværk Affaldsenergi, Aalborg. With this call for tenders DRH intend to contract transport and utilization of up to 38.000 t/Y of raw slag. For further information please refer to the tender documents.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Midtre Romerike Avløpsselskap - MIRA IKS.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.