New: market reports on German public procurement Read the report

LVL technologies GmbH & Co KGCrailsheimTED

Construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority measures in the Municipality of Kolašin

The indicative scope of works covers the following elements: 1. Sewerage network: Construction of sewerage network in the approximate length of 9.2 km which will serve to 3000 inhabitants in the following settlements: Kolašin city centre, Braće Vujisić (Dulovina), Breza and partly Smailagića Polje and Gornji Pažanj. 2. Water supply priori...

Type: Tender
Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
LVL technologies GmbH & Co KG
Published:
August 30, 2026
Deadline:
Not specified
Object:
Kläranlage / Abwasseraufbereitung

Object classification

  • Kläranlage / AbwasseraufbereitungPrimary
  • Kanalnetz / Abwasserkanal

Tender description

Show full description

The indicative scope of works covers the following elements: 1. Sewerage network: Construction of sewerage network in the approximate length of 9.2 km which will serve to 3000 inhabitants in the following settlements: Kolašin city centre, Braće Vujisić (Dulovina), Breza and partly Smailagića Polje and Gornji Pažanj. 2. Water supply priority measures: Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. - Preparatory services (operational GIS, HID based hydraulic model, leakage detection for 30 km of network and detailed design of new elements including SCADA) - Supply, installation and commissioning of bulk flowmeters, and water meters (400), establishment of DMAs and SCADA - Works for upgrade of the water distribution system hydraulic configuration. 3. Wastewater Treatment Plant Design and Construction of WWTP in Bakovići settlement - Conventional Activated Sludge Process and aerobic sludge stabilization. Design and construction of the WWTP shall include two phases: Phase I - 4000 PE (to be constructed): Wastewater flowrate (including infiltration) = 765 m³/d (9 l/s); Peak dry weather flow = 57 m³/h (16 l/s); Peak wet weather flow to =109 m³/h. Phase II - additional 2000 PE (to be considered in design): Wastewater flowrate (including infiltration= 1045 m³/d (12 l/s); Peak dry weather flow = 77 m³/h (21 l/s); Peak wet weather flow = 150 m³/h The proposed process for WWTP includes: Influent pipe and by-pass line, inlet chamber, Coarse screens, Fine screens, Aerated grit chamber, Distribution chamber, Primary sedimentation, activated sludge and secondary sedimentation (biological) treatment, Effluent control and measurement chamber, Discharge line to the Tara River, Sludge pumping station, Sludge distribution chamber, Sludge thickener, Sludge reed beds, Drainage pumping station, Building for guard, laboratory, blowers, warehouse, Odour control, Plant infrastructure, fenc

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

7 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

8

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
No specific submission deadline is currently stated for this notice.
Who is the contracting authority?
The contracting authority is LVL technologies GmbH & Co KG.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Discover more tenders

Next step

Get full access to this tender

Access all documents for "Construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority measures in the Municipality of Kolašin" from LVL technologies GmbH & Co KG and keep track of deadlines and submission guidelines.

Never miss a deadlineNo credit card required