Wexford County CouncilWexfordTED
Cluain Fada, New Ross, Co. Wexford - Design and Build of 22 No. Category 1 MMC Dwellings.
Design and Build of 22 No. Category 1 MMC dwellings at Cluain Fada, New Ross, Co. Wexford
Modular Construction
No credit card · Instant access
Content at a glance
Design and Build of 22 No. Category 1 MMC dwellings at Cluain Fada, New Ross, Co. Wexford
- Tender type:
- Tender
- Contracting authority:
- Wexford County Council
- Published:
- June 24, 2026
- Deadline:
- Not specified
- Topic:
- Modular Construction
- Object:
- Mehrfamilienhaus / Wohnblock
Object classification
- Mehrfamilienhaus / WohnblockPrimary
Tender description
Design and Build of 22 No. Category 1 MMC dwellings at Cluain Fada, New Ross, Co. Wexford
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- Health and Safety AuthorityDublinDeadline: Jul 08
Design, Build and Support of ICT Network
Design and build a network in the new HSA Headquarters and support the entire HSA network for the period of the contract. - Ministry for Foreign AffairsValletta
NP001-2026 Design and Build of Various Steel Structures at Palazzo Parisio Valletta
Design and Build of Various Steel Structures at Palazzo Parisio Valletta. - Construction IT AllianceDublin 2Deadline: Aug 21
Continued Support and Development of the Skillnet MMC Accelerate Online Platform
The aim of the Platform is to promote the value of Modern Methods of Construction (MMC) to stakeholders at both national and local level, to showcase MMC careers, roles and pathways, and to enable construction professionals to rapidly understand the resources and opportunities available to upskill. The Platform serves a wide array of external and internal user profiles, which are summarised at Section 4.2.6. This is not a request for a new, greenfield build. The Platform has already been designed, built, deployed and is live and in service, having been procured by CitA under its earlier open competition for the design, build and implementation of the MMC software platform. The successful Tenderer will assume responsibility for the existing, operational solution and will deliver the managed services and the development work described in this Appendix. - Department of ContractsFloriana
CT5013/2026 - Negotiated Procedure for the Design and Build Tender for New Acute Mental Health Wards and Extension of Emergency Department at Mater Dei Hospital, using Environmentally Friendly Construction Materials and Products
Negotiated Procedure for the Design and Build Tender for New Acute Mental Health Wards and Extension of Emergency Department at Mater Dei Hospital, using Environmentally Friendly Construction Materials and Products - Department of ContractsFloriana
CT5013/2026 - Negotiated Procedure for the Design and Build Tender for New Acute Mental Health Wards and Extension of Emergency Department at Mater Dei Hospital, using Environmentally Friendly Construction Materials and Products
CT5013/2026 - Negotiated Procedure for the Design and Build Tender for New Acute Mental Health Wards and Extension of Emergency Department at Mater Dei Hospital, using Environmentally Friendly Construction Materials and Products - Kildare County Council_385Naas
Design, Supply, and Installation of a New Playground at Moorefield Park, Newbridge, Co. Kildare
Kildare County Council (KCC) Parks Department invites tenders from competent and experienced companies for the design, supply, and installation of a new playground at Moorefield Park, Newbridge, Co. Kildare. The playground is to be designed specifically to provide a challenging and engaging play experience for older children, aged 8-12, and teenagers. The design must feature equipment and layouts that promote dynamic activity, social interaction, and managed risk, ensuring the space remains stimulating for this key demographic.. The design of the proposed facility must complement the character of the site and be informed by the indicative design layout and ethos provided in this brief This is a design-and-build contract. The successful tenderer will be appointed to fulfil the roles of both Project Supervisor for the Design Process (PSDP) and Project Supervisor for the Construction Stage (PSCS). - Cork County CouncilCorkDeadline: Jun 26
Establishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council
Cork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer – Architectural Services (Contractor Design Specialist), including PSDP • Designer – Civil and Structural Engineering Services (Contractor Design Specialist) • Designer – Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement. - Sligo County CouncilSligoDeadline: Jun 26
EoI - Suitability Assessment for Design and Build Works Contractors for the construction of 12 no. Social Housing units together with all associated site works at Grange, Co.Sligo.
The construction of 12 no. 1 and 2 storey dwellings comprising of 4 two-bedroom apartments, 1 two bedroom house, 6 three-bedroom houses, and 1 four-bedroom house together with all associated site works at Harte’s Court (Cúirt Uí Airt), Grange Townland, Grange, Co.Sligo, for Sligo County Council. - Malta College of Arts Science and TechnologyPaolaDeadline: Jul 25
DESIGN AND BUILD TENDER FOR THE CONSTRUCTION, MECHANICAL AND ELECTRICAL INSTALLATIONS, AND FINISHING WORKS OF THE NEW ICA BUILDING WITHIN THE MCAST CAMPUS, PAOLA AS PER NATIONAL GREEN PUBLIC PROCUREMENT STANDARDS
Design-and-build tender for the new Institute for the Creative Arts building at MCAST Campus, Paola. Approx. 2,800 m² footprint with multi-level underground car park and four floors of training areas. Includes comprehensive design, excavation, construction, mechanical/electrical installations, and all finishes. Estimated value €14 million (indicative). Single works contract. - Department of ContractsFloriana
CT2093/2025 DESIGN AND BUILD TENDER FOR THE CONSTRUCTION OF A SKIP MANAGEMENT FACILITY AND AMENITIES AT ECOHIVE COMPLEX, MAGĦTAB WITH A REDUCED ENVIRONMENTAL IMPACT
DESIGN AND BUILD TENDER FOR THE CONSTRUCTION OF A SKIP MANAGEMENT FACILITY AND AMENITIES AT ECOHIVE COMPLEX, MAGĦTAB WITH A REDUCED ENVIRONMENTAL IMPACT
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Wexford County Council.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.