SCK CENMolTED
"Cavity Field Controller MicroTCA Electronics" pour MYRRHA Phase I (MINERVA) 100 MeV LINAC à protons
Cavity Field Controller MicroTCA-Elektronik für MYRRHA Phase I (MINERVA) 100-MeV-Protonen-LINAC.
Generators, Valves & Fittings, Measurement Technology, Process Technology
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- SCK CEN
- Published:
- June 17, 2026
- Deadline:
- July 17, 2026
- Topic:
- Generators
Tender description
Cavity Field Controller MicroTCA-Elektronik für MYRRHA Phase I (MINERVA) 100-MeV-Protonen-LINAC.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
5DC Power Converters Bi-polar for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC
SCK CENMolDeadline: Jul 08DC power converters Bi-polar (PCO-Bp) für den MYRRHA Phase I (MINERVA) 100 MeV Hochleistungs-Protonen-LINAC zur Versorgung von normalleitenden Magneten verschiedener Typen.DC Power Converters Uni-polar for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC
SCK CENMolDeadline: Jun 23Beschaffung von unipolaren DC-Stromrichtern (PCO-Up) für den 100 MeV Protonen-LINAC im Rahmen der MYRRHA Phase I (MINERVA). Die Geräte dienen zur Stromversorgung verschiedener Typen normalleitender Magnete.Vacuum Armature MYRRHA Phase I 100 MeV LINAC
SCK CENMolDeadline: Jul 09Voor de implementatie van de MYRRHA Fase I (MINERVA) 100 MeV proton LINAC zijn vacuüm armaturen nodig: - (Aangepaste) standaardonderdelen: buizen, flenzen, balgen, bochten - Niet-standaardonderdelen: kamers, tanks, verdeelstukkenBeam Loss Monitors (BLMs) for the NC Linac
SCK CENMolDeadline: Sep 24Beschaffung von Beam Loss Monitors (BLMs) für die MYRRHA Phase I (MINERVA) 100 MeV Proton LINAC.Beam Loss Monitors (BLMs) for the SC Linac
SCK CENMolDeadline: Sep 24Beam Loss Monitors (BLMs) for the SC Linac for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 17. Juli 2026.
- Who is the contracting authority?
- The contracting authority is SCK CEN.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.