SCK CENMolTED
Beam Loss Monitors (BLMs) for the NC Linac
Beschaffung von Beam Loss Monitors (BLMs) für die MYRRHA Phase I (MINERVA) 100 MeV Proton LINAC.
Measurement Technology
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- SCK CEN
- Published:
- July 14, 2026
- Deadline:
- September 24, 2026
- Topic:
- Measurement Technology
Tender description
Beschaffung von Beam Loss Monitors (BLMs) für die MYRRHA Phase I (MINERVA) 100 MeV Proton LINAC.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock3 details capturedPerformance locations
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
6Beam Loss Monitors (BLMs) for the SC Linac
SCK CENMolDeadline: Sep 24Beam Loss Monitors (BLMs) for the SC Linac for MYRRHA Phase I (MINERVA) 100 MeV proton LINACBEAM POSITION MONITOR ELECTRONICS
SCK CENMolDeadline: Oct 12BEAM POSITION MONITOR ELECTRONICS for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC"Cavity Field Controller MicroTCA Electronics" pour MYRRHA Phase I (MINERVA) 100 MeV LINAC à protons
SCK CENMolDeadline: Jul 17Cavity Field Controller MicroTCA-Elektronik für MYRRHA Phase I (MINERVA) 100-MeV-Protonen-LINAC.Beam Pipes and Adapter Pipes for the Super FRS
FAIR - Facility for Antiproton and Ion Research in Europe GmbHDarmstadtThis tender covers the procurement of Beam Pipes and Adapter Pipes with respect to the Detailed Specification (F-DS-SFR-en-VC_0114_Beam_pipes_Adapter_flanges_SFRS-V001). Point 3.2.2. OPTIONAL COMPONENTS FOR FIRST SCIENCE PHASE (EXPANSION) is excluded from this tenderSupply of cryopumps for the ITER Heating and Diagnostic Neutral Beam System
The European Joint Undertaking for ITER and the Development of Fusion Energy ("Fusion for Energy")BarcelonaDeadline: Jul 31Herstellung von 2 Kryopumpen für ITER HNB und 1 Kryopumpe für ITER DNB.All risks insurance contract for direct physical loss or damage at the JRC sites.
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Jul 16JRC benötigt fünf Versicherungskontrakte für Feuer, Natur- und Industriegefahren sowie Materialschäden an nuklearen und nicht-nuklearen Anlagen an fünf Forschungsstandorten (Ispra, Geel, Petten, Karlsruhe, Sevilla). Die Versicherung muss Gebäude (Reaktoren, Labore, Büros etc.) und deren Inhalte (Maschinen, Instrumente, Brennstoff, Möbel) abdecken. Die Prämie basiert auf dem Ersatzwert der Gegenstände. Ein Los pro Standort; Bieter können mehrere Lose anbieten.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 24. September 2026.
- Who is the contracting authority?
- The contracting authority is SCK CEN.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.