New: market reports on German public procurement Read the report

Connaught Airport Development Company LtdCharlestownTED

Apron Safety Reconfiguration Project

The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing st...

Submission deadline: September 14, 2026Type: Tender

Road Construction, Electrical Installation, Pipeline Construction, Sewer Construction, Paving

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
Connaught Airport Development Company Ltd
Published:
August 17, 2026
Deadline:
September 14, 2026
Topic:
Road Construction
Object:
Flughafen-Piste / -Vorfeld

Object classification

  • Flughafen-Piste / -VorfeldPrimary

Tender description

Show full description

The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing stand layout to provide three fully independent Code C stands, eliminating operational constraints associated with the existing arrangement and improving aircraft manoeuvrability. • Pavement and Civil Engineering Works Construction of new rigid pavement for aircraft stands, flexible pavement works for taxi lane and fillets, and localised rehabilitation and overlay works to existing apron areas. • Drainage and De-icing Infrastructure Provision of drainage infrastructure, including dedicated de-icing areas with appropriate collection and treatment systems. • Airfield Systems and Ancillary Infrastructure Integration of airfield ground lighting (AGL), markings, and associated electrical and ducting infrastructure required to support the revised apron layout. • Passenger Interface Improvements Provision of covered walkways and associated infrastructure to enhance passenger safety and segregation from aircraft and ground operations. The Works will be delivered within a live operational airport environment and will require careful planning, phasing and coordination to maintain ongoing operations, including aircraft movements, passenger flows and ground service activities. The Works will also be subject to airport security requirements, including Garda vetting, BSAT training, security clearance processes and compliance with all applicable airport access permit requirements. Please refer to the tender documents for more details

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

7 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

10

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 14. September 2026.
Who is the contracting authority?
The contracting authority is Connaught Airport Development Company Ltd.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "Apron Safety Reconfiguration Project" from Connaught Airport Development Company Ltd and keep track of deadlines and submission guidelines.

Deadline tracked until September 14, 2026No credit card required