Gas Networks IrelandCorkTED
25/061 - Qualification System for Boiler Package Units
Qualifizierungssystem für erdgasbefeuerte Kesselanlagen (PBU). Der Umfang umfasst Design, Fertigung, Montage, Lieferung und Inbetriebnahme von Kesseln, Generatoren, LPHW-Systemen, Steuerungs- und Automatisierungstechnik sowie Wärmetauschern für Vorheizsysteme. GNI kann Teile oder das Gesamtsystem beschaffen sowie zusätzliche Leistungen fü...
Generators, Measurement Technology, Process Technology
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Gas Networks Ireland
- Published:
- May 18, 2026
- Deadline:
- May 15, 2036
- Topic:
- Generators
Tender description
Qualifizierungssystem für erdgasbefeuerte Kesselanlagen (PBU). Der Umfang umfasst Design, Fertigung, Montage, Lieferung und Inbetriebnahme von Kesseln, Generatoren, LPHW-Systemen, Steuerungs- und Automatisierungstechnik sowie Wärmetauschern für Vorheizsysteme. GNI kann Teile oder das Gesamtsystem beschaffen sowie zusätzliche Leistungen für den sicheren Betrieb anfordern. Audits (inkl. Vor-Ort-Besichtigungen) zur Überprüfung von Qualität, Prozessen und Dokumentation sind möglich.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock1 detail capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
7Qualification system for grounding transformers
EnBW Energie Baden-Württemberg AGDeadline: Jul 25Lot 1: Grounding transformer (NEB) 10 kV / 350 A. Vector group ZNyn5(d), cooling type ONAN, short-term operation 2h. Rated HV: 10.4 kV, rated current 350 A. Rated LV: 0.4 kV, 400 kVA. Zero-sequence impedance: 3.5 Ω/phase. Comply with DIN IEC 60076.Qualification System for Large Power Transformers (LPTs)
Netze ODR GmbHDeadline: Jul 25EnBW requests participation for production, delivery and operational handover of large power transformers for 380 kV grid projects. Technical requirements: three-winding, 400/200/200 MVA, 400/33/33 kV, YNd11d11, 93 dB(A) sound, ONAF cooling, short circuit voltages 22/22/44%, DIN 60076, on-load tap changer with ±10% range. Inviting qualified companies.Supplier qualification system for HVDC Converter substations
Energinet Eltransmission A/SFredericiaLieferantensystem für HGU-Umrichterstationen (HVDC Converter substations).Copenhagen Airports: Qualification system Conditions for Qualification Scheme for Sustainable Aviation Fuel (SAF)
Københavns Lufthavne A/SKastrupDeadline: Jun 08Qualification system for supply of Sustainable Aviation Fuel (SAF) and associated environmental attribute certificates to reduce Copenhagen Airports' CO2 emissions from business travel (Scope 3, category 6). Aims to establish a list of qualified companies for future tenders, implemented under Article 77 of the Utilities Directive.Procurement of an administration system for mobile units.
Bodø KommuneBODØDeadline: Aug 04The contracting authority needs a new system for administering mobile units in the health and welfare service. This includes approx. 1200 Samsung tablets and mobile telephones that are used by employees in different service areas. The system shall make it easier to set up, update and secure the units, as well as give a central overview and control. The system shall contribute to safe handling of information, reduce manual follow-up and ensure effective use in accordance with the municipality ́s requirements for privacy, information security and operational efficiency. All employees in Bodø municipality, including associated associated companies and underlying entities, on Bodø municipality ́s ICT platform, shall be able to use the system.TenneT Qualification System for Protection and Control Systems
TenneT TSO GmbHBayreuthDeadline: Jul 11TenneT TSO GmbH (hereinafter referred as TenneT) is the largest Transmission System Operator (TSO) in Germany (based on circuit length, installed capacity and size of operating zone as of 31 Decem-ber 2025). The company operates critical infrastructure that secures access to a reliable, sustainable and affordable electricity supply. TenneT is one of the largest investors in electricity grids on land and at sea in Germany. Located at the Northwest European energy crossroads, TenneT connects: North and South. Offshore and Onshore. Germany and Europe. With its approximately 5,000 employees the company builds, maintains and operates Germany's largest transmission grid with a length over 14,000 km connect-ing more than a third of the European Union’s total offshore wind capacity. Its growth is driven by a rapidly evolving electricity demand that requires a flexible and growing grid architecture. The scope of this prequalification procedure covers the supply of Intelligent Electronic Devices (IEDs) used in the areas of protection and substation control technology within extra high-voltage and high-voltage substations. These devices constitute key components of the secondary technology and are essential for ensuring the safe, reliable and efficient operation of the transmission grid. The technical requirements are based on internationally recognized substation communication protocols commonly applied in the automation and operation of electrical power systems. The primary focus of the TQS is on IEC 61850, while other relevant protocols, such as IEC 60870 5 103 and IEC 60870 5 104, are also considered where applicable. This prequalification process aims to identify Economic Operators with proven expertise in the planning, production, implementation and integration of such devices in accordance with applicable technical and regulatory requirements. Candidates receive qualification status for each of their own production sites and each technical lot. The successful completion of the qualification process depends on various factors beyond TenneT’s control. TenneT can only commit to the processing time for the individual gates. The time required to complete the questionnaires and provide the necessary documentation is the sole responsibility of the participating Economic Operators.CON1199 - Qualification System for Electrical Distribution Substation Works
Electricity Supply BoardDublinDeadline: Jul 08The Contracting Entity is seeking expressions of interest from economic operators seeking entry on to a Qualification System that will be established for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance and construction services related to electrical power distribution assets (mainly within substations but also power distribution cables, ring main units, mini-pillars and other associated assets throughout the distribution network ), up to 110 kV voltage level. The works will be located in the Republic of Ireland. The Qualification System gives contractors the opportunity to express their interest in tendering for these works which may arise. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 10th July 2026 (the “First Procurement Closing Date”).
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 15. Mai 2036.
- Who is the contracting authority?
- The contracting authority is Gas Networks Ireland.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.