TenneT TSO GmbHBayreuthTED
TenneT Qualification System for Protection and Control Systems
TenneT TSO GmbH (hereinafter referred as TenneT) is the largest Transmission System Operator (TSO) in Germany (based on circuit length, installed capacity and size of operating zone as of 31 Decem-ber 2025). The company operates critical infrastructure that secures access to a reliable, sustainable and affordable electricity supply. Tenne...
Grid Infrastructure
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- TenneT TSO GmbH
- Published:
- June 10, 2026
- Deadline:
- July 11, 2026
- Topic:
- Grid Infrastructure
Tender description
Show full descriptionCollapse description
TenneT TSO GmbH (hereinafter referred as TenneT) is the largest Transmission System Operator (TSO) in Germany (based on circuit length, installed capacity and size of operating zone as of 31 Decem-ber 2025). The company operates critical infrastructure that secures access to a reliable, sustainable and affordable electricity supply. TenneT is one of the largest investors in electricity grids on land and at sea in Germany. Located at the Northwest European energy crossroads, TenneT connects: North and South. Offshore and Onshore. Germany and Europe. With its approximately 5,000 employees the company builds, maintains and operates Germany's largest transmission grid with a length over 14,000 km connect-ing more than a third of the European Union’s total offshore wind capacity. Its growth is driven by a rapidly evolving electricity demand that requires a flexible and growing grid architecture. The scope of this prequalification procedure covers the supply of Intelligent Electronic Devices (IEDs) used in the areas of protection and substation control technology within extra high-voltage and high-voltage substations. These devices constitute key components of the secondary technology and are essential for ensuring the safe, reliable and efficient operation of the transmission grid. The technical requirements are based on internationally recognized substation communication protocols commonly applied in the automation and operation of electrical power systems. The primary focus of the TQS is on IEC 61850, while other relevant protocols, such as IEC 60870 5 103 and IEC 60870 5 104, are also considered where applicable. This prequalification process aims to identify Economic Operators with proven expertise in the planning, production, implementation and integration of such devices in accordance with applicable technical and regulatory requirements. Candidates receive qualification status for each of their own production sites and each technical lot. The successful completion of the qualification process depends on various factors beyond TenneT’s control. TenneT can only commit to the processing time for the individual gates. The time required to complete the questionnaires and provide the necessary documentation is the sole responsibility of the participating Economic Operators.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock3 details capturedPerformance locations
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
4Framework Agreement for the Delivery of Control Systems (IEC104) and the Provision of related services
TenneT TSO GmbHBayreuthFramework Agreement for the Delivery of Control Systems (IEC104) and the Provision of related services TenneT is a leading European transmission system operator responsible for the safe and reliable transmission of electrical energy over long distances. TenneT’s core tasks include the expansion and maintenance of the transmission grid, the integration of renewable energy sources, and the assurance of grid stability. TenneT’s grid area covers large parts of Germany and the Netherlands and includes both onshore and offshore connections. As an operator of critical infrastructure, the security and reliability of the systems in use are of particular importance. The aim of this tender is the establishment of two framework agreements for the procurement of substation Control Systems, in particular Intelligent Electronic Devices (IEDs) and field control units, for use in TenneT TSO GmbH’s (TTG) high‑voltage and extra‑high‑voltage substations. The systems to be procured are intended for control, monitoring, signalling and automation purposes within substations and are a key element of secure and reliable grid operation. Within the scope of this tender, TTG intends to procure Control System components including, but not limited to, bay control units, station control units, interface devices, and related auxiliary equipment. A central focus of the procurement is the use of the communication protocol IEC 60870‑5‑104 (IEC 104) for the exchange of control, status and measurement data between the substation level and higher‑level control systems. The devices shall support typical substation automation functions, reliable IEC 104 communication, and seamless integration into existing station control concepts in accordance with applicable technical standards. The subject of this tender is the supply of Control Systems hardware, including IEDs and associated components, as well as related documentation and services necessary for commissioning and integration into TTG’s substations. The framework agreement shall enable TTG to call off devices on demand over the contract term for new installations, refurbishments, and replacement purposes. Parallel to the hardware framework agreement, TTG intends to conclude a separate service contract covering the maintenance of the devices and the maintenance of embedded software, including corrective and preventive measures as well as software updates and upgrades, in accordance with the contractual provisions. Due to increasing requirements regarding system availability and redundancy, the procurement procedure is structured into two lots, which will be awarded separately. The lot structure is intended to ensure supply security, operational resilience and redundancy of the Control Systems deployed within TTG’s transmission grid. TenneT TSO GmbH is certified according to ISO 27001. Therefore, only Control Systems and equipment that comply with TTG’s Operational Technology security requirements may be offered (OT security and IT security requirements). Tender Documents To participate in the tender, please complete the Non‑Disclosure Agreement below and send it via email to: [email protected] Access to the additional tender documents will be granted immediately upon receipt and review of the document. TenneT TSO GmbH will treat the documents you submit and the trade and business secrets contained therein as confidential in accordance with Section 5 of the Sector Ordinance.Qualification System for Large Power Transformers (LPTs)
Netze ODR GmbHDeadline: Jul 25EnBW requests participation for production, delivery and operational handover of large power transformers for 380 kV grid projects. Technical requirements: three-winding, 400/200/200 MVA, 400/33/33 kV, YNd11d11, 93 dB(A) sound, ONAF cooling, short circuit voltages 22/22/44%, DIN 60076, on-load tap changer with ±10% range. Inviting qualified companies.CON1199 - Qualification System for Electrical Distribution Substation Works
Electricity Supply BoardDublinDeadline: Jul 08The Contracting Entity is seeking expressions of interest from economic operators seeking entry on to a Qualification System that will be established for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance and construction services related to electrical power distribution assets (mainly within substations but also power distribution cables, ring main units, mini-pillars and other associated assets throughout the distribution network ), up to 110 kV voltage level. The works will be located in the Republic of Ireland. The Qualification System gives contractors the opportunity to express their interest in tendering for these works which may arise. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 10th July 2026 (the “First Procurement Closing Date”).Procurement of an ERP system and assistance (the qualification phase).
Norsk Helsenett SFTRONDHEIMDeadline: Aug 21The aim of the procurement is to procure and introduce a future orientated, cloud based ERP system and hourly consultancy services connected to the system. The Norwegian Health Network would like a contract partner who can deliver a combined, fully integrated system that supports digitalisation, streamlining and automation of processes and services in accounting, budget/forecasts, wages, invoicing, travel/outlay and hour registration (the list is not exhaustive).
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 11. Juli 2026.
- Who is the contracting authority?
- The contracting authority is TenneT TSO GmbH.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.