Skerries Harps GAA and Camogie ClubSkerries
View CfT Workspace
Project involves the supply and installation of several key pieces of energy infrastructure. Supply and installation of 2 nr Battery Packs/BESS with a total of 200kWh capacity (1 nr 80kWh and 1 nr 120kWh) and supply and installation of suitable hybrid inverter.
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Skerries Harps GAA and Camogie Club
- Veröffentlicht:
- 21. August 2026
- Frist:
- 21. August 2026
Ausschreibungsbeschreibung
Project involves the supply and installation of several key pieces of energy infrastructure. Supply and installation of 2 nr Battery Packs/BESS with a total of 200kWh capacity (1 nr 80kWh and 1 nr 120kWh) and supply and installation of suitable hybrid inverter.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
3 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Ähnliche Bekanntmachungen
4Sustainable Energy Development - Skerries Harps
Skerries Harps GAA and Camogie ClubSkerriesFrist: 14. Sept.Project involves the supply and installation of several key pieces of energy infrastructure. Supply and installation of 2 nr Battery Packs/BESS with a total of 200kWh capacity (1 nr 80kWh and 1 nr 120kWh) and supply and installation of suitable hybrid inverter.View CfT Workspace
Athy Rugby Football ClubFrist: 24. Aug.Athy Rugby Club wishes to appoint a suitably qualified Design and Build Contractor for the removal and lawful disposal of asbestos roof materials, replacement of the clubhouse roof with a new insulated composite roof system, and the design, supply, installation, commissioning and support of a Solar PV Array, Battery Energy Storage System (BESS) and Smart Energy Control System. The works include the removal and disposal of approximately 830 m2 of asbestos-containing roof coverings and associated asbestos gutters and downpipes. A new insulated roof system with a minimum 50-year design life and new gutters and downpipes shall be installed. Tenderers shall attend a mandatory pre-tender site inspection and measurement survey. All dimensions and quantities are indicative only and tenderers shall rely on their own measurements. No adjustment to the Contract Sum will be permitted for quantity or measurement differences that could reasonably have been identified before tender submission. The successful contractor shall be responsible for all asbestos-related compliance, removal, transportation, disposal documentation and certification. The Smart Energy Control System shall optimise energy generation, storage and consumption, integrate with the existing generator, manage battery charging and discharge, support floodlighting loads and include a secure web-based monitoring platform and smart phone application. The project is part-funded through the LEADER Programme.View CfT Workspace
Mayo County Council_1127Frist: 13. Aug.Mayo County Council in partnership with Lower Achill Community Development Group propose to refurbishment the existing court at the Sandy Banks. Phase 1 of this project involves civil works and surfacing works. The project includes the design, supply and installation of a final-base construction and synthetic surfacing on an existing sub-base. This contract also includes all associated landscaping and civil ground works as outlined in the pricing document.View PMC workspace
daa plcFrist: 06. Aug.Pre Market Engagement- daa is seeking to gather information with regards to the provision of a Photovoltaic and Battery Energy Storage System at Dublin airport. As part of daa’s strategic commitment to enhancing energy resilience and advancing sustainability at Dublin Airport, this project seeks to deliver a large-scale Solar Photovoltaic (PV) installation integrated with a Battery Energy Storage System (BESS). This project will help support daa’s long-term vision of decarbonising airport operations and securing a reliable, self-sufficient energy supply. An online presentation on the project will be carried out on Wednesday, 01 July at 2.30 pm, giving all participants the opportunity to review the work completed so far and discuss the next steps. The session will be held virtually to ensure everyone can join easily, and further details about access and materials will be shared in advance. If you wish to participate in this presentation please respond through the eTenders portal before 12 pm on Monday 29 June using the expression of interest function.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 21. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Skerries Harps GAA and Camogie Club.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.