Valentia Island Development Company CLGValentia IslandTED
The Essential Repairs and Consolidation of the First Message Building, Knightstown, Valentia Island, Co. Kerry
Consolidation Works to the First Message Building, a ruined structure, Including repointing of masonry walls, reinstatement of stone lintols, reinstatement of wall tops with recovered stones from site and flaunching to protect existing building fabric.
Mauerarbeiten, Naturstein
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Consolidation Works to the First Message Building, a ruined structure, Including repointing of masonry walls, reinstatement of stone lintols, reinstatement of wall tops with recovered stones from site and flaunching to protect existing building fabric.
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Valentia Island Development Company CLG
- Veröffentlicht:
- 11. März 2026
- Frist:
- 09. April 2026
- Thema:
- Mauerarbeiten
Ausschreibungsbeschreibung
Consolidation Works to the First Message Building, a ruined structure, Including repointing of masonry walls, reinstatement of stone lintols, reinstatement of wall tops with recovered stones from site and flaunching to protect existing building fabric.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
9- Office of Public Works (OPW)TrimFrist: 02. Juni
No. 6 Harcourt Street - Conradh na Gaeilge - Phase 3B - Construction of extension shell and core
Phase 3b: Shell and Core Construction of a new four-storey over two-storey basement rear extension (716 m²) to a Protected Structure, including lift and stair cores, external finishes, glazing, primary and secondary steel, and masonry works. An atrium with glazed roof and walkways will connect the existing building and extension. Restoration of basement walls and floor of the Protected Structure with new slab, drainage, and waterproofing. M&E installations are not included. - Dublin City CouncilDublinFrist: 22. Mai
Contract for the execution of the Building Works designed by the Employer relating to Dublin City Council's redevelopment of Dalymount Park, Phibsborough
Redevelopment of Dalymount Park into a UEFA Category 3 stadium with capacity for 8,039 spectators (6,245 seated, 1,794 standing). Works include demolition of existing structures, site investigation, and new construction of stands, player/match official facilities, media/broadcasting infrastructure, hospitality and community spaces, building services (MEP), and external/site works. This is the first stage of a competitive procedure: interested parties submit a Suitability Assessment Questionnaire (SAQ). Following evaluation, the top 5 scoring applicants meeting minimum criteria will be invited to tender. - Health Service Executive (HSE)Kildare
Alteration Works to the Non-Clinical Areas of the Existing Mortuary, Midland Regional Hospital, Tullamore, Co. Offaly
Proposed alteration works to the non-clinical areas of the exiting single storey Mortuary Building, located to the South of the campus, including new external stone wall cladding with wall-mounted signage to the front/east elevation and internal reconfiguration to provide new Family Room, new kitchenette and stores and new access to adjacent garden area, together with all associated site works. - Cnoc Bui Community Arts Centre CLGUnion HallFrist: 23. März
Restoration Works Cnoc Bui Community Arts Centre, Union Hall Cork - Re Tender
The works comprise restoration of existing stone sheds to create a new exhibition space The existing floor slab will be demolished and replaced with a new insulated concrete floor slab, walls will be lime rendered, windows and doors replaced, new electrics and underfloor heating system installed and associated external paving, drainage and an insitu concrete retaining wall built to the rear of the site. - Health Service Executive (HSE)Kildare
Alteration Works to the existing Laundry and Drier Rooms at Abbeyleix CNU, Abbeyleix Health Centre, Knocknamoe, Abbeyleix, Co. Laois.
Reconfiguration of existing Laundry and Drier rooms located on ground floor level including the replacement and relocation of existing washing and drying machines, replacement of existing internal and external doors and windows and redecoration of both rooms as well as works to the Comms room located on first floor level, together with all associated works. - Office of Public Works (OPW)Trim
Mini Competition for the Provision of a Site Administrator (Works Clerk) in Listowel, Co. Kerry
To assist with the completion of various on-going projects in Co. Kerry, there is a requirement to appoint a Site Administrator (Works Clerk) in the OPW’s Capital Works Delivery Section. - Scoil UrsulaCorkFrist: 22. Mai
Scoil Ursula Primary School, Blackrock Road, Blackrock, Cork - SEN extension and associated siteworks
The project consists of construction of a single storey extension containing 2 SNU classrooms, multi sensory room, office, store and ancillary accommodation to the Eastern side of the existing school building, connection with the existing building, minor alterations within the existing building and all associated site works and services at Scoil Ursula, Blackrock Road, Blackrock, Cork. - Office of Public Works (OPW)TrimFrist: 12. März
Geomatic Survey Services; Measured Topographic and Building Surveys for the National Museum of Ireland Archaeology
The Commissioner of Public Works wish to invite tenders for the supply of Geomatic Survey Services; Measured Topographic and Building Surveys of the National Museum of Ireland Archaeology, Kildare Street, Dublin 2, Ireland. A geomatic survey of the building, both internal and external, will form the basis for the development of drawings connected with proposed conservation and new works to the building. - Rylane Community Park AssociationcorkFrist: 15. Aug.
Construction of a New Build Community Centre in Rylane Cork
Developing a site for community building. The development will consist of the following; construction of a single storey community building to include hall, changing rooms, showers, toilets, storage, meeting room, etc., car parking, vehicular and pedestrian entrances from the public road, all with associated sewer, storm ESB Ducting and site works.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 09. April 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Valentia Island Development Company CLG.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.