Offaly County Council_448TullamoreTED
Technical Advisor Team Appointment For: Design and Build project to provide 19No. Residential Units and associated external works
offaly county council wishes to appoint Technical Advisor Team including: Lead Consultant, Architect, Structural and Civil Engineering, Building Services Engineering, Quantity Surveying, Project Supervisor Design Process, Assigned Certifier and Employers Representative Services. Regarding Construction Works Stage ii to v For Design and Bu...
Architektur, Tragwerksplanung, Tiefbauplanung, TGA-Planung, Projektsteuerung Bau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Offaly County Council_448
- Veröffentlicht:
- 11. Juni 2026
- Frist:
- 22. Juli 2026
- Thema:
- Architektur
Ausschreibungsbeschreibung
offaly county council wishes to appoint Technical Advisor Team including: Lead Consultant, Architect, Structural and Civil Engineering, Building Services Engineering, Quantity Surveying, Project Supervisor Design Process, Assigned Certifier and Employers Representative Services. Regarding Construction Works Stage ii to v For Design and Build project to provide 19No. Residential Units and associated external works. At Rathbaun, Shinrone, Co Offaly.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Provision of Assigned Certifier services to Donegal County Council for 76 social housing units across three Design and Build projects.
Donegal County Council_1193LiffordAssigned Certifier services for 76 social housing units across three design and build projects in Co Donegal: Newtowncunningham (40), Kilmacrennan (20), and Oldtown Letterkenny (16).Multi-Party Framework Agreement for Design Team Services 2025 – Framework 03 for Non-Acute Healthcare Capital Works Projects Valued Between €1M and €15M (Excl. VAT) for HSE North East
Health Service Executive (HSE)KildareFrist: 18. JuniMulti-party framework for design team services (7 lots: Architect, QS, Building Services Engineer, Civil/Structural Engineer, Employer's Representative, Energy Efficient Design Facilitator, Assigned Certifier) for non-acute healthcare capital works projects valued €1M-€15M (excl. VAT) in HSE North East. Initial project: proposed Adult Disability Respite Service at Swellan Lower, Cavan Town, Co. Cavan.Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services for Road Infrastructure and associated services at IDA Ballina
IDA IrelandDublinThe Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Planner, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.TENDER FOR THE DESIGN, SUPPLY, DELIVERY AND INSTALLATION OF A MODULAR UNIT AND ASSOCIATED WORKS AT ARC HEALTHY LIVING, IRVINESTOWN. PEACEPLUS FUNDED UPGRADE WORKS
Fermanagh and Omagh District CouncilEnniskillenFrist: 21. JuniDesign, supply, delivery, and installation of a modular unit and associated civil engineering works at ARC Healthy Living, Irvinestown, Co. Fermanagh. Contract period: 14 weeks off-site design/prefabrication and 4 weeks on-site construction. Funded through PEACEPLUS Local Action Plan Theme 1.1 'Enhancement to Existing Community Spaces/Halls'.A multi-disciplinary consultancy framework agreement to provide design, procurement and technical support services for DART+ for IE PMP Phases5-7
Iarnród Eireann-Irish RailDublinThe procurement of a multi-disciplinary consultancy framework agreement to provide design, procurement and technical support services for DART+: Detail Design and Tender Process, Contract Award, Construction and Implementation and Close out and Review (Phases 5 - 7 of the IÉ Project Management Procedures (PMPs))Establishment of a Single Supplier Framework of MEP Led Design Team for Small and Minor Work Process Projects at Tyndall National Institute, UCC
University College CorkCorkThis Tender is to establish a Single Supplier Framework of MEP Led Design Team for Small and Minor Process Works Projects at Tyndall National Institute, UCC to whom specific tasks will be awarded on an exclusive basis based on the terms of a framework agreement, a copy of which will be issued with the tender documents. The team will comprise the following services. • Mechanical, Electrical and Process Engineering Services (MEP); • Employers Representative • Project Supervisor Design Process The Framework Agreement will be established on foot of competitive tenders received for the above services based on Notional Hours and rates for various disciplines as detailed in the Pricing Document Typically, projects will range in construction value from €5k to €3M however there may be exceptions whereby the construction value may be outside this range. The following are the higher value projects scheduled for coming years that the MEP Led Design Team may be assigned to: • Silicon Fab - Block A Scrubber Replacement • Silicon Fab - Old Training Fab conversion to Cleanroom • Silicon Fab - Refurbishment including demolition of room in subfab • Block C and Silicon Fab - Process Tool Hook Up • Old Boiler house Upgrade including Gas Stores • Waste Water TreatmentSingle-Party Framework Agreement for the Provision of Project Management Led Multi-Disciplinary Design Team Consultancy Services for the Construction of a VR Incident Command Suite Extension
Offaly County Council_448TullamoreFrist: 06. JuliOffaly County council is seeking to appoint a Project Management Led Multi Disciplinary Design Team Consultancy Services for the Construction of a VR Incident Command Suite Extension to the Fire Service Training and Development Centre at Kilcruttin Tullamore, Co. OffalyEstablishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council
Cork County CouncilCorkFrist: 26. JuniCork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer – Architectural Services (Contractor Design Specialist), including PSDP • Designer – Civil and Structural Engineering Services (Contractor Design Specialist) • Designer – Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement.LIMERICK CITY AND COUNTY COUNCIL IRELAND Architect led integrated Design Team Consultancy Services including PSDP for the proposed refurbishment and new build works at No 35 to 39 Nicholas Street
Limerick City and County Council_103432Limerick.Architect Led Multi disciplinary design team to include Conservation Architect G1Structural Fire and M and E Engineers QS Project Manager Site Archaeologist and PSDP The development of a Design and Innovation Hub at Nos 35 to 39 Nicholas Street Limerick a Protected Structure No RPS 7016 to comprise artist studios workspaces retail area exhibition space and restaurant with associated outdoor area adjoining St Peter Street The development will include the erection of new part two storey part single storey building incorporating the upstanding walls of the medieval house and their associated fabric and features at Nos 35 to 39 Nicholas Street the change of use from residential refurbishment and renovation of No 35 Nicholas Street The demolition of a two storey extension to the rear and its replacement with a three storey extension the erection of a single storey workshop unit to the rear of No 35 and all associated site works This development is within the site of Recorded Monuments LI005-017006 and LI005-017123 both classified as House-medievalTender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare
Clare County CouncilEnnisFrist: 05. JuniTender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 22. Juli 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Offaly County Council_448.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.