UNIDOPhilippines
Supply of Solar Photovoltaic System Components for Vocational Training Centres on project number 230228 (EU) in Liberia
Tendering Text: Supply of Solar Photovoltaic System Components for Vocational Training Centres on project number 230228 (EU) in Liberia
Photovoltaik
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- UNIDO
- Veröffentlicht:
- 24. August 2026
- Frist:
- 15. September 2026
- Thema:
- Photovoltaik
Ausschreibungsbeschreibung
Tendering Text: Supply of Solar Photovoltaic System Components for Vocational Training Centres on project number 230228 (EU) in Liberia
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
3 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Ähnliche Bekanntmachungen
9Supply of Masonry Hand Tools and Equipment for a Vocational Training Centre on project number 230228 (EU) in Liberia
UNIDOPhilippinesFrist: 07. Sept.Tendering Text: Supply of Masonry Hand Tools and Equipment for a Vocational Training Centre on project number 230228 (EU) in LiberiaSPD1/2026/026 - Tender for the Supply, Delivery, Installation, Commissioning and Training of an Unmanned Surface Vessel (USV) with High-Definition Integrated Bathymetric Survey System and Energy-Efficient Ground Control Station for the University of Malta (Maestri Project) - CUP NO G13C25000300006
Department of ContractsFlorianaFrist: 09. Sept.SPD1/2026/026 - Tender for the Supply, Delivery, Installation, Commissioning and Training of an Unmanned Surface Vessel (USV) with High-Definition Integrated Bathymetric Survey System and Energy-Efficient Ground Control Station for the University of Malta (Maestri Project) - CUP NO G13C25000300006Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 01. Okt.The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: An MV/LV transformer A thermal management system (dry cooler) A lowpressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for selfconsumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's cogenerators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from the cogeneraSupply, delivery, installation and configuration of Network Equipment, including the installation and setup of a backup solar system, for OCHA Sudan
UN SecretariatKenyaFrist: 09. Sept.The United Nations Office for the Coordination of Humanitarian Affairs (OCHA) invites Expressions of Interest (EOI) from competent and qualified companies for the supply, delivery, installation, and configuration of network equipment, as well as the supply, installation, and setup of a solar backup system, including solar panels, at OCHA guesthouses in Khartoum, Sudan. The goods and services should be delivered and completed within 10 (ten) days after receiving the order from UN. The successful contractor will enter into a one-time contract with UNOCHA by issue of a Purchase Order. Details of the requirements and specifications will be provided in the Tender document (Request for Quotation - RFQ) to be issued at a later date after close of this REOI. Specific Requirements/Information Interested companies are invited to submit their EOI electronically via the link provided on the UNGM not later than 08 September 2026. Expressions of Interest not sent electonically using the UNGM link provided may not be considered for the solicitation. This EOI does not constitute a solicitation. UNOCHA reserves the right to change or cancel the requirements at any time during the EOI and/or solicitation process. Thus, submitting a reply to this EOI does not automatically guarantee that your firm will be considered for receipt of the solicitation when issued.GNUE Erweiterung JVA Halle, Teilmaßnahme 3: Mehrzweckgebäude mit Raumschießanlage und Begleitmaßnahmen - KKE 307 - Installation und Wartung Photovoltaikanlage (SHL 344-25)
Landesbetrieb Bau- und Liegenschaftsmanagement Sachsen-Anhalt (LB BLSA), Baubüro DessauDessau-RoßlauInstallation und Wartung Photovoltaikanlage : - ca. 575 PV Module(Ost/West- Ausrichtung) aufgeständert - Tragsystem PV- Module - 5 Wechselrichter - Systemverkabelung AC+DC - Netzkopplung - KabeltragsystemePV-Anlage mit Speicher
Gemeinde StullnPV-Anlage mit SpeicherPhotovoltaik; Ausbau auf Bahngrund 2021-2022; Frankenmarkt (Kirchham) - Konzeption, Planung und Errichtung einer 16,7 Hz Bahnstrom-Freiflächenphotovoltaikanlage - DC
ÖBB-Infrastruktur AGWienZur Erhöhung der Eigenerzeugung wird die Errichtung einer 16,7 Hz-PV-Anlage auf ÖBB-Eigengrund in Kirchham, 4891 Pöndorf (Oberösterreich) mit einer installierten Leistung von ca. 2,15 MWp ausgeschrieben. Die Anlage ist als 16,7 Hz-System mit Direkteinspeisung in die Oberleitung konzipiert. Das Unternehmen wird mit der Planung, Lieferung, Errichtung und Inbetriebnahme der DC-Seite der PV-Anlage beauftragt. Die AC-Seite wird in einem eigenen Vergabeverfahren ausgeschrieben.Aquisition de Kit à energie Solaire
UNIDOPhilippinesFrist: 11. Sept.Tendering Text: Aquisition de Kit à energie SolaireDR; Congo22 Solaranlagen je 38,4 kWp
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 07. Sept.22 Solaranlagen mit je 38 kWp PV und 28 kW Speicher inklusive Lieferung DDP Deutschland (exportfähig und aufgeteilt an verschiedene Adressen)
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 15. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist UNIDO.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.