European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsTED
Supply of natural gas JRC Geel
JRC-Geel intends to conclude a contract for the continuous supply of (renewable) natural gas to the JRC-Geel. The gas is to be used to heat three buildings on the JRC-Geel premises.
Energielieferung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs
- Veröffentlicht:
- 10. August 2026
- Frist:
- 25. August 2026
- Thema:
- Energielieferung
Ausschreibungsbeschreibung
JRC-Geel intends to conclude a contract for the continuous supply of (renewable) natural gas to the JRC-Geel. The gas is to be used to heat three buildings on the JRC-Geel premises.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
7Photovoltaic Installation JRC-Geel
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsThe Joint Research Center (JRC) of the European Commission wishes to equip their site, located at Retieseweg 111, 2440 Geel, Belgium, with a photovoltaic installation (PV). The aim of this installation to conform with the upcoming PV obligation set out by the Flemish government and to maximize the yield with the available surfaces. The produced energy will be maximally consumed locally. The scope of this tender includes the design, supply, installation, and commissioning of the PV installation. The installation to be placed must have a minimum capacity of 675 kWp and must be designed according to the specifications made available during tendering period.Supply of Natural Gas
Coras Iompair Eireann (CIE Utility)Dublin 8Supply of Natural Gas Kennung des Verfahrens: b00701e3-3c84-47b2-a79d-ab049ff2d0d7 Vorherige Bekanntmachung: 11a14265-7f01-4893-b579-a048db889ba0-01 Verfahrensart: Verhandlungsverfahren mit vorheriger Veröffentlichung eines Aufrufs zum Wettbewerb/Verhandlungsverfahren Das Verfahren wird beschleunigt: neinSupply of an innert glovebox chain for the JRC Karlsruhe
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 05. Okt.The JRC Karlsruhe plans to sign a contract for a supply of an innert glovebox chain operating under under-pressure for the handling of radionuclides available at the JRC KA. The glove boxes are used for the synthesis of actinide containing organometallic compounds requiring highest purity atmospheric conditions. The installation shall follow all regulatory needs in agreement with legal and technical instructions required for nuclear installations in Germany.Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 01. Okt.The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: An MV/LV transformer A thermal management system (dry cooler) A lowpressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for selfconsumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's cogenerators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from the cogeneraSupply delivery and installation of Gas Chromatography Mass Spectrometer
University College Dublin ( UCD )DublinThe Contracting Authority wishes to purchase a gas chromatography mass spectrometer which will be used to separate, identify, and quantify volatile compounds in various samples. The gas chromatograph vaporizes a sample and separates it into its components, while the mass spectrometer analyses these components by breaking them into ionized fragments for identification.Supply of renewable electricity
Port of Waterford CompanyWaterfordFrist: 02. Okt.Supply of renewable electricity to the Port of WaterfordSustainable Management of Natural Resources in three landscapes in South Sudan
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornThe assignment contributes to strengthening the technical and organizational capacities of subnational administrations and non-state actors in the respective intervention areas regarding sustainable landscape approaches as well as Specific Objective 3 of the EU Action which aims at enhancing the protection and sustainable management of the natural resource base of the economy and agricultural livelihoods. The contractor will work on the development and facilitation of three multi-stakeholder-platforms (MSP) in Western Bharel Ghazal (WBG), Western Equatoria State (WES), and Eastern Equatoria State (EES), aiming for an institutionalized mechanism for sustainable natural resource management within three selected landscapes. The MSPs are collaborative frameworks to bring together diverse actors from different sectors, including government institutions, the private sector, civil society, and local communities, to address shared challenges in sustainable natural resource management. The platforms facilitate the development and implementation of sustainable practices through inclusive and participatory processes. By involving multiple stakeholders, MSPs help to foster social cohesion and to prevent and resolve conflicts related to resource use. They establish negotiation formats and consensus-building processes that reduce risks and improve governance. The project has identified three landscapes for implementation and the contractor shall be responsible for strengthening the capacity of the MSPs in terms of collaboration and decision making, ensuring that the management strategies are effective and beneficial to all involved stakeholders. Implementing training programs on organizational development and technical skills will form a major part of the assignment. Support in the regular "day-to-day" activities are another crucial element requiring close assistance. These activities empower local communities including women, youth, elders and other stakeholders to actively part
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 25. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.