St Baithin's NSLiffordTED
St Baithin's NS Donegal Electrical Works
Electrical services to be removed and replaced in the existing building area over the summer.
Elektroinstallation
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- St Baithin's NS
- Veröffentlicht:
- 26. Mai 2026
- Frist:
- 04. Juni 2026
- Thema:
- Elektroinstallation
- Bauobjekt:
- Schule
Bauobjekt-Klassifikation
- SchuleHauptobjekt
Ausschreibungsbeschreibung
Electrical services to be removed and replaced in the existing building area over the summer.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9EWS26 Electrical Upgrade Works at St Anne's Convent NS The Square Castlerea Co Roscommon
Saint Anne’s National SchoolCastlereaFrist: 11. JuniEWS26 Electrical Upgrade Works to St Anne's Convent NS The Square Castlerea Co Roscommon. The works entail replacement of the existing electrical services throughout the building,. Refer to the attached documents for further information on the works to be carried out.EWS26 - Electrical Upgrade Works at Killeeneen NS Killeeneen Craughwell Co Galway
Killeeneen National School (Craughwell)Killeeneen Craughwell Co GalwayFrist: 19. MaiElectrical upgrade works at Killeeneen NS, Killeeneen Craughwell, Co Galway. Replacement of existing electrical services throughout the building. Further details in attached documents. Site visits to be arranged directly with the school.Electrical Upgrade works to St. Catherine's of Siena, Curragh Camp, Curragh, Co. Kildare
St Catherine of SienaCurraghFrist: 26. JuniEWS 2026 Electrical upgrading works to St. Catherine's of Siena, Curragh Camp, Curragh, Co. Kildare. the works entail the replacement of the existing electrical services throughout the building. Refer to the drawings for further information on the works to be carried out.St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
St Oliver Plunkett NS NewcastleAthenryFrist: 08. JuniThe existing school building (1977, extensions 2010-2013 and 2025, approx. 732 sq. m) requires stripping out and disposal of the old LPHW space heating, cold water storage, and boiler house in the original building. New works include general power for the heating upgrade, emergency lighting, and fire alarm. Retain existing electrical and Solar PV.Mechanical upgrading works to St. Cronan’s Junior National School, Brackenstown, Swords, Co. Dublin, K67 DP28.
St Cronan's Junior National SchoolDublinFrist: 22. JuniSt. Cronan's National School is a single-storey school building with an approximate floor area of 3,050m². This project entails works in decommissioning and replacing the existing space heating throughout the majority of the building which includes the supply and installation of new radiators, new heating services pipework, new rooms controls, etc. throughout the majority of the school building. There are some areas in the building where the existing space heating installation shall be retained but some remedial works shall be carried out to the existing space heating installation in these areas. Refer to the tender drawings and tender documents for further information.The Establishment of TUS Multi-Operator Framework Agreements for Electrical Works Contractors
Technological University of the Shannon: Midlands Midwest (TUSMM)LimerickTUS is seeking to establish two Multi-Operator Framework Agreements (MOFAs) with suitable electrical works contractors. The procurement process is structured in two Lots. Each Lot is a standalone competition where up to 6 single applicants will be selected and appointed. The purpose of these multi-operator framework agreements is to establish a structured and efficient mechanism through which TUS can procure and deliver a range of General electrical Works projects/ contracts over a four-year period from the commencement date of each framework. Lot 1 - Multi Operator Framework Agreements of Electrical Works Contractors for Electrical Works in TUS Midlands €200,000 – €2 million. Lot 2 - Multi Operator Framework Agreements of Electrical Works Contractors for Electrical Works in TUS Midwest €200,000 – €2 million.Invitation to Tender for Construction Works at St Catherines Vocational School. RN 71241W, Donegal Road, Killybegs, Co. Donegal, F94 A004
Donegal Education and Training Board_368LetterkennyFrist: 16. JuniInvitation to Tender for Construction Works at St Catherines Vocational School. RN 71241W, Donegal Road, Killybegs, Co. Donegal, F94 A004 Summer Works Project - Science Labs (incl Gas Works) The works comprise of the upgrade of 2 no Science labs including gas, upgrade of building services, new fixed furniture, floor coverings, painting and decoration, new suspended ceiling in 1 lab only.Invitation to Tender for Upgrading and Refurbishment Works at FET Centre Donegal Town at Drumcliff, Donegal Town, Co. Donegal, F94 D28H
Donegal Education and Training Board_368LetterkennyFrist: 26. JuniUpgrading and Refurbishment Works to existing building to include new windows and externals doors, pumped beaded insulation to external walls and new M and E services inclusive of all associated work at Donegal FET Centre Drumcliff, Donegal Town, Co. Donegal, F94D28HCON1199 - Qualification System for Electrical Distribution Substation Works
Electricity Supply BoardDublinFrist: 08. JuliThe Contracting Entity is seeking expressions of interest from economic operators seeking entry on to a Qualification System that will be established for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance and construction services related to electrical power distribution assets (mainly within substations but also power distribution cables, ring main units, mini-pillars and other associated assets throughout the distribution network ), up to 110 kV voltage level. The works will be located in the Republic of Ireland. The Qualification System gives contractors the opportunity to express their interest in tendering for these works which may arise. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 10th July 2026 (the “First Procurement Closing Date”).
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 04. Juni 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist St Baithin's NS.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.