Special Module Fabrication – Structural Steel – Detail, Fabrication, and Furnish (SR/US)
The scope of work for this package consists of detailing, fabricating and delivering over 100 structural steel module assemblies (based on U.S. Materials, Codes, and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP1000 Project. The total weight of the structural steel modules is approximately 2000 met...
Fenster & Türen, Stahlbau, Tischlerarbeiten
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
- Veröffentlicht:
- 16. Juli 2026
- Frist:
- 16. August 2026
- Thema:
- Fenster & Türen
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The scope of work for this package consists of detailing, fabricating and delivering over 100 structural steel module assemblies (based on U.S. Materials, Codes, and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP1000 Project. The total weight of the structural steel modules is approximately 2000 metric tons (MTs) per unit, or 6000 MTs total for all three units. The module designs include structural steel shapes, plates, studs, and miscellaneous items, such as grating, handrail, stairs, reinforcing steel couplers, pipe sleeves, etc. The majority of the design uses carbon steel, however there is some duplex stainless steel used in several module designs. Fabrication is divided into five module categories, all typically delivered as subassemblies for site assembly with installation by others: • CAxx (18 modules): Floor modules (up to 13m x 13m x 1.4m, 50 MT) supporting concrete slab placement. • CBxx (37 modules): Liner modules replacing formwork (one 300 MT module 45m diameter x 10m high; most modules up to 6m x 4m x 4m, 12 MT), consisting mainly of plates, studs, and stiffeners. • CHxx (14 modules): Heavy stair/platform tower framing (up to 20m x 10m x 8m, 90 MT). • CSxx (4 modules): Light stair modules with framing, handrails, and grating (up to 8m x 6m x 4m, 16 MT). • SPLxx (36 modules): Platform modules (light to heavy framing) including large mezzanine and operating decks, up to 120–160 MT. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. SCHEDULE FORECAST (SUBJECT TO CHANGE) Prequalification Submittal Deadline: September 2026 RFQ Document Issuance: January 2027 Supplier Proposal Due: March 2027 Order Award Date: July 2027 Required on Site Date: First Delivery (Unit 1): August 2029 // Final Delivery (Unit 3): July 2035 (Additional delivery schedule information will be provided in the RFQ Package)
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
826/288 Dynamic Purchasing System for the Supply and Delivery of Metals including Steel, Welding and Metal Fabrication Consumables and Related Equipment for Atlantic Technological University
Atlantic Technological UniversityLetterkennyAtlantic Technological University (ATU) wishes to establish a Dynamic Purchasing System (DPS) for the supply and delivery of Metals including Steel, Welding and Metal Fabrication Consumables and related Metal Fabrication Equipment under three Lots. The DPS will be established for five (5) years and is open for applications from interested parties until 08 February 2031. This is the first stage of the procedures whereby all interested parties may submit a response to the pre-qualification questionnaire appended to this notice. Suppliers meeting the Selection Criteria will be deemed eligible for inclusion on the DPS and will be invited to tender for applicable future competitions.BreSpaceTech 2025+ - Umbauarbeiten APL Airportstadt Fassadenarbeiten und Sektionaltor
Hochschule BremenBremenFassadenarbeiten SektionaltorFassadensanierung WDVS Rückseite Metallbau- und Sonnenschutzanlagen
Immobilien Bremen - Eigenbetrieb der Stadtgemeinde BremenBremenca. 122 Stck. Senkrechtmarkisen demontieren, zwischenlagern und nach Fassadensanierung wieder montieren ca. 146 Stck. Fenster.Leibungsfutter demontieren und entsorgen Alu-Anschlussbleche liefern und montierenGS Marienschule, WC-Sanierung, Trockenbauarbeiten
Stadt DelmenhorstDelmenhorstIm Gebäude der Marienschule, Beethovenstraße sollen zwei WC-Kerne saniert werden. Beide WC-Kerne befinden sich im Erdgeschoss, wobei der Sanierungsbereich der neuen Schüler- und Lehrer-WCs unmittelbar von außen zugänglich ist. Der Bereich der Lehrer-WCs muss über den Flur des Verwaltungstrakts erreicht werden. Die Lehrer-WCs werden im Zuge der Sanierung zu einem Behinderten WC umgebaut für einen barrierefreien Zugang. Die Trockenbauarbeiten umfassen im Wesentlichen folgende Leistungen: EG Bereich neue Schüler- und Lehrer-WCs: ca. 55,00 qm neue Rasterdecken herstellen inkl. Dämmung und Dampfbremse ca. 54,00 qm raumhohe Vorwandinstallationen herstellen neue Türen EG neues Behinderten-WC: ca. 7,50 qm neue Rasterdecke herstellen inkl. Dämmung und Dampfbremse ca. 16,00 qm raumhohe Vorwandinstallationen herstellen neue Tür EG Lehrerzimmer und angrenzende Räume: ca. 62,00 qm neue Rasterdecke herstellen inkl. Dämmung und DampfbremseK 325 Verbreiterung Radweg Horumersiel - Schillig - K325-10-0 bis K325-20-249 als wassergebundene Decke
Niedersächsische Landesbehörde für Straßenbau und Verkehr - Geschäftsbereich AurichAurichFrist: 17. Aug.2.800 m² Wassergebundene Wegedecke herstellen 700 m² Pflasterdecke herstellen 50 m Aluminiumgeländer liefern und einbauenF251b Felssicherungsmaßnahmen Kapuzinerberg 2026
SalzburgSalzburgErrichtung von rund 135 m Steinschlagschutzzäunen (1.000 kj; H = 4,0 m) in den Bereichen Arenbergstraße 1 und 25.(LBB NL KO) BWZentralkrankenhaus KO Metternich Neubau 1. BA OP-u. Funktionsgebäude, Sonnen- und Sichtschutz
LBB NL KoblenzKoblenzSonnen- und Sichtschutz: Verdunkelungs-Rollos 29 St Abdunkelungs-Rollos 98 St Blendschutz-Rollos 33 St Abdunkelungs-Vertikallamellen 8 St Blendschutz-Vertikallamellen 187 St Strahlenschutzvorhänge 7 StKantonsschule Baden, Erweiterung und Ersatz Provisorien - BKP 272.3 Brandschutztüren- und tore
Kanton Aargau - Departement Finanzen und Ressourcen - Immobilien AargauAarauFrist: 01. Sept.BKP 272.3 Brandschutztüren- und tore
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 16. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.