EnBW Energie Baden-Württemberg AGTED
Qualification system for grounding transformers
Lot 1: Grounding transformer (NEB) 10 kV / 350 A. Vector group ZNyn5(d), cooling type ONAN, short-term operation 2h. Rated HV: 10.4 kV, rated current 350 A. Rated LV: 0.4 kV, 400 kVA. Zero-sequence impedance: 3.5 Ω/phase. Comply with DIN IEC 60076.
Generatoren
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- EnBW Energie Baden-Württemberg AG
- Veröffentlicht:
- 29. April 2026
- Frist:
- 25. Juli 2026
- Thema:
- Generatoren
Ausschreibungsbeschreibung
Lot 1: Grounding transformer (NEB) 10 kV / 350 A. Vector group ZNyn5(d), cooling type ONAN, short-term operation 2h. Rated HV: 10.4 kV, rated current 350 A. Rated LV: 0.4 kV, 400 kVA. Zero-sequence impedance: 3.5 Ω/phase. Comply with DIN IEC 60076.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten4 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten4 Angaben erfasstLose LOT-0002 · Lose LOT-0003 · Lose LOT-0004 · Lose LOT-0001
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
8Qualification System for Large Power Transformers (LPTs)
EnBW Energie Baden-Württemberg AGEnBW is seeking requests for participation for production, delivery and operational handover for high-quality large power transformers for our **380kV grid projects. Companies with the capability to meet our technical specifications are invited to submit their requests for participation. This qualification system contains critical electrical data and implementation guidelines to ensure performance, safety and ability to implement our projects. Below are the summarized technical requirements: **Electrical Specifications:** - **Design:** Three-winding power transformer - **Rated power: **400/200/200 MVA - **Voltage ratio: **400/33/33 kV - **Vector group: **YNd11d11 - The specified no load sound power level, measured according to the sound intensity method is 93 dB(A). - **Cooling type: **provided by an ONAF system. - **Short circuit voltage: **specified as 22% for HV-LV1, 22% for HV-LV2, and 44% for LV1-LV2. - The transformer is designed in accordance with DIN 60076 - An on load tap changer is provided with 17 steps and a total voltage control range of −10% to +10% **Important Keywords:** 380 kV Transformers, High Voltage Transformers, Three-Winding power transformers, Outdoor Installation Transformers We look forward to receiving your request for participation and potential partnerships.TenneT Qualification System for Protection and Control Systems
TenneT TSO GmbHBayreuthTenneT TSO GmbH (hereinafter referred as TenneT) is the largest Transmission System Operator (TSO) in Germany (based on circuit length, installed capacity and size of operating zone as of 31 Decem-ber 2025). The company operates critical infrastructure that secures access to a reliable, sustainable and affordable electricity supply. TenneT is one of the largest investors in electricity grids on land and at sea in Germany. Located at the Northwest European energy crossroads, TenneT connects: North and South. Offshore and Onshore. Germany and Europe. With its approximately 5,000 employees the company builds, maintains and operates Germany's largest transmission grid with a length over 14,000 km connect-ing more than a third of the European Union’s total offshore wind capacity. Its growth is driven by a rapidly evolving electricity demand that requires a flexible and growing grid architecture. The scope of this prequalification procedure covers services and systems in the areas of protection and substation control technology within extra high-voltage & high-voltage substations and grids. These sys-tems are essential components of the secondary technology and play a key role in ensuring the safe, reli-able, and efficient operation of the transmission grid. The technical requirements are based on internationally recognized substation communication protocols commonly applied in the automation and operation of electrical power systems. The primary focus of the TQS is on IEC 61850, while other relevant protocols, such as IEC 60870 5 103 and IEC 60870 5 104, are also considered where applicable. This prequalification process aims to identify Economic Operators with proven expertise in the planning, production, implementation and integration of such technologies in accordance with applicable technical and regulatory requirements. Candidates receive qualification status for each of their own production sites and each technical lot. The successful completion of the qualification process depends on various factors beyond TenneT’s control. TenneT can only commit to the processing time for the individual gates. The time required to complete the questionnaires and provide the necessary documentation is the sole responsibility of the participating Economic Operators.Qualification System for the provision of Utility Surveys (Onshore and Offshore)
Iarnród Eireann-Irish RailDublinFrist: 25. JuliIrish Rail (IÉ) seeks to establish a Qualification System for Design Support services consisting of Utility Surveys (Onshore and Offshore) via a Pre-Qualification process.ESM platform with a system for user enquiries - Stage 1 - Qualification
StortingetOSLOFrist: 22. JuniThe Norwegian Parliament's current system for user enquiries (Footprints) is outdated and no longer meets security and efficiency needs. A project aims to acquire a modern ESM platform, with a new user enquiry system as the first implementation. The platform must be secure, scalable, standardized, and support future digitalization, automation, and fact-based decisions. The tenderer provides configuration, development, and best practices.26-034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation & Maintenance Services for the Strategic Gas Emergency Reserve
Gas Networks IrelandCorkFrist: 25. JuliGas Networks Ireland (GNI) establishes a Qualification System for Engineering, Procurement, Construction, Operation & Maintenance Services (EPC-O&M) for the Strategic Gas Emergency Reserve (SGER). Scope includes detailed design, procurement, construction of marine terminal, onshore infrastructure, and pipelines connecting FSRU to transmission network, building on existing FEED study. Also includes operational and maintenance requirements. This is a Periodic Indicative Notice (PIN) for market consultation only, not a call for competition.Supplier qualification system for HVDC Converter substations
Energinet Eltransmission A/SFredericiaLieferantensystem für HGU-Umrichterstationen (HVDC Converter substations).25/061 - Qualification System for Boiler Package Units
Gas Networks IrelandCorkFrist: 15. MaiQualifizierungssystem für erdgasbefeuerte Kesselanlagen (PBU). Der Umfang umfasst Design, Fertigung, Montage, Lieferung und Inbetriebnahme von Kesseln, Generatoren, LPHW-Systemen, Steuerungs- und Automatisierungstechnik sowie Wärmetauschern für Vorheizsysteme. GNI kann Teile oder das Gesamtsystem beschaffen sowie zusätzliche Leistungen für den sicheren Betrieb anfordern. Audits (inkl. Vor-Ort-Besichtigungen) zur Überprüfung von Qualität, Prozessen und Dokumentation sind möglich.Retender - Power Transformers for N1 A/S
N1 A/SEsbjerg NRetender for 7 lots of power transformers: Lot 8 (2 units: TDN-KT22, TDS-KT21), Lot 9 (3: KLI-KT21, RDN-KT21, RDS-KT21), Lot 10 (5: VAN-KT21, LAK-KT21, LUN-KT22, LBR-KT21, PAN-KT21), Lot 11 (5: Reserve 2, VEL-KT21, VEL-KT22, Nordværk-KT21, Nordværk-KT22), Lot 12 (4: HAM-KT22, HØS-KT21, FAS-KT22, SBP-KT21), Lot 13 (5: KIH-TA21, BIS-KT22, Reserve 3, KAB-KT21, KAB-KT22), Lot 14 (3: Reserve 1, FLD-KT21, FLD-KT22).
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 25. Juli 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist EnBW Energie Baden-Württemberg AG.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.