Department of the Environment Climate and CommunicationsDublinTED
Provision of Marine Surveys for Biological Data Collection within the South Coast Designated Maritime Area Plan
The Minister for the Climate, Energy and the Environment (DCEE) invites interested parties to submit responses to this request for tender for a desktop study for best practice methodology for characterising the migratory patterns of for birds (waterbirds and seabirds, passerine birds), digital aerial surveys for birds and marine mammals, ...
Umweltgutachten, Wasserwirtschaft
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Department of the Environment Climate and Communications
- Veröffentlicht:
- 31. August 2026
- Frist:
- Nicht angegeben
- Thema:
- Umweltgutachten
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The Minister for the Climate, Energy and the Environment (DCEE) invites interested parties to submit responses to this request for tender for a desktop study for best practice methodology for characterising the migratory patterns of for birds (waterbirds and seabirds, passerine birds), digital aerial surveys for birds and marine mammals, benthic habitat survey over the SC-DMAP area and environs as specified within each lot. The SC-DMAP is situated off the coast of County Cork, Waterford and Wexford. As part of a new plan-led regime, the offshore wind Phase Two policy approved by Government in March 2023 requires that all future offshore renewable energy developments in Ireland will take place within Designated Maritime Area Plans (DMAPs), which will be established according to provisions in the Maritime Area Planning Act, 2021. Specifically, all future developments will take place at specific sites within DMAPs that have been identified for this purpose by Government. In October 2024, the Minister for the Environment, Climate and Communications made the South Coast Designated Maritime Area Plan for Offshore Renewable Energy (SC DMAP), following the approval of both Houses of the Oireachtas. The first offshore wind project with a capacity of approximately 900MW will take place in Tonn Nua and will aim for deployment by 2030.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten3 Angaben erfasstLose LOT-0001 · Lose LOT-0002 · Lose LOT-0003
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten9 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9Visualisation Services in support of the National Designated Maritime Area Plan (DMAP) for Offshore Renewable Energy (ORE)
Department of the Environment Climate and CommunicationsDublinFrist: 11. Sept.Visualisation Services in support of the National Designated Maritime Area Plan (DMAP) for Offshore Renewable Energy (ORE)CFT 3992 - Cleansing of Council owned lands within the administrative area of South Dublin County Council for the Traveller Accommodation Unit.
South Dublin County CouncilDublinFrist: 16. Sept.Multi Party framework agreement for Cleansing of Council owned lands within the administrative area of South Dublin County Council for the Traveller Accommodation Unit.Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing - AquaDuctus Section 1 (Offshore)
AquaDuctus Pipeline GmbHKasselFrist: 22. Sept.To address Europe's future energy demand, significant investments into hydrogen infrastructure are essential. One of the core components of this initiative is the development of a pan-European hydrogen pipeline network in the North Sea, designed to connect major hydrogen producers with key consumers across the continent. The AquaDuctus project is part of this future pipeline network. The AquaDuctus project consists of an offshore part (Exclusive Economic Zone (EEZ) and territorial waters of the German North Sea and a receiving terminal at the coastline of Lower Saxony) and an onshore part to make connection with the onshore grid. The AquaDuctus project is planned as a large diameter pipeline (48 inch) with a transport capacity of 20 GWH2 and a design pressure of 120 bar. The conceptual design of the pipeline enables the connection of neighbouring European hydrogen infrastructures and the planned production facilities in the German EEZ (SEN-1 Area). For the shore crossing, the selected contractor shall prepare a legally compliant EIA as part of the Energy Industry Act (EnWG) permit process, based on agreed scoping with the responsible approval authority (Landesamt für Bergbau, Energie und Geologie - LBEG), covering nature conservation, water protection, and impact compensation requirements, which also include environmental studies. The substantive requirements for the environmental documentation are derived from the Energiewirtschaftsgesetz (EnWG), Bundesnaturschutzgesetz (BNatSchG) and Wasserhaushaltsgesetz (WHG). The contracting authority will align the precise scope of the investigations with the LBEG. The selected contractor shall assist the contracting authority in preparing, planning and executing the permit application process. The services comprise: determination of the data basis; preparation of documents for and participation in the scoping conference with the approval authority and specialist authorities (optional); performance of environmental surveys; preparation of formal environmental documentation for approval. Further technical requirements are detailed in Attachment B.1 Scope of Work. The duration of the contract is not time limited. The estimated duration is 2.5 years, but the works due under the contract may take longer, e.g., if the works are not yet completed because the permit application process takes longer. Further details are provided in the contract documentation.Provision of Data collection services for the Detailed Design Studies for Urban Infrastructure works for Hargeisa Municipality, Somaliland
UNOPSSierra LeoneFrist: 07. Sept."Provision of Data collection services for the Detailed Design Studies for Urban Infrastructure works for Hargeisa Municipality, Somaliland" IMPORTANT NOTE: Interested vendors must respond to this tender using the UNOPS eSourcing system, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system, please refer to the user guide and other resources available at: https://esourcing.unops.org/#/Help/GuidesEstablishment of a Contract for the Provision of Solid Waste Collection and Disposal Services including Operation and Maintenance Services for Solid Waste Handling Equipment, in Various locations in UNMISS Camps, the Republic of South Sudan
UN SecretariatKenyaFrist: 09. Sept.The United Nations Mission in South Sudan (UNMISS) hereby solicits Expressions of Interest (EOI) from competent Companies for the Establishment of a Contract for the Provision of Solid Waste Collection and Disposal Services including Operation and Maintenance Services for Solid Waste Handling Equipment, in Various locations in UNMISS Camps, the Republic of South Sudan Specific Requirements/Information Conditions: 1. Interested companies are invited to submit their Expression of Interest (EOI) online, by hand delivery, or by e-mail as indicated below. The EOI must include, as a minimum, the following information: United Nations Global Market (UNGM) and Registration Number for the Establishment of a Contract for the Provision of Solid Waste Collection and Disposal Services including Operation and Maintenance Services for Solid Waste Handling Equipment, in Various locations in UNMISS Camps, the Republic of South Sudan of UNSPSC Code no 76121501 Company’s contact details (address, telephone and e-mail, etc.). Important Notice: 2. This REOI does not constitute a solicitation. UNMISS reserves the right to change or cancel the requirement at any time during the REOI and/or solicitation process. Thus, submitting a response to this REOI does not automatically guarantee that your company will be considered for receipt of the solicitation when issued. 3. UNMISS also reserves the right to send the Solicitation Documents to companies who were identified through additional market research or other means to source the UN requirements. 4. Vendors interested in fulfilling the requirement described above must be registered with UNGM and those not registered may wish to visit www.ungm.org for full registration information in order to be eligible to participate in any solicitation. 5. Vendors already registered at the UNGM basic level and level 1 are strongly advised to upgrade to level 2. 6. Local and Regional companies, women owned businEEA/DTL/25/014 - Provision of IT consultancy services in the area of Java software development to support Reportnet – EEA’s e-reporting platform for environmental data
European Environment Agency (EEA)CopenhagenIn the context of maintaining and extending EEA’s data reporting platforms and data system management, the EEA seeks to establish framework service contracts in cascade with service providers for the provision of IT services and support in the following areas: - Java software development for: o Web and frontend applications o Backend applications such as microservices and applications running in containers - Deployment of applications (DevOps) in a hybrid cloud environment using Continuous Delivery and Continuous Integration (CD/CI) pipelines, supported by hypervisor-based virtualization and clustering architecture using container technologies and orchestrator platforms such as Kubernetes. - First, Second and Third levels for IT support services (Tier 1, Tier 2 and Tier 3 support) for Reportnet platforms.AFB und LBP im Planungsgenehmigungsverfahren
Stadtwerke Senftenberg GmbHSenftenbergErstellung eines Artenschutzfachbeitrags (AFB) und eines Landschaftspflegerischen Begleitplans (LBP) im Rahmen des PlangenehmigungsverfahrensGastvogelerfassung 2026/2027
Biosphärenreservatsverwaltung Niedersächsische ElbtalaueHitzackerFrist: 08. Sept.Erfassung und Dokumentation der saisonalen Rastgesellschaften nordischer Gastvögel während der Rastperiode 2026/2027 in den linkselbischen Gebietsteilen des Landkreises Lüneburg sowie der Dannenberger Marsch im Biosphärenreservat "Niedersächsische Elbtalaue"Städtebauliche Entwicklungsmaßnahme Wiesbaden-Ostfeld
SEG Stadtentwicklungsgesellschaft Wiesbaden mbHWiesbadenFrist: 17. Sept.Beschreibung: Beschreibung des Auftrags Ausgangssituation: Die Stadtverordnetenversammlung der Landeshauptstadt Wiesbaden (LHW) hat am 17. September 2020 die Durchführung der städtebaulichen Entwicklungsmaßnahme "Ostfeld" (SEM Ostfeld) nach § 165 Baugesetzbuch (BauGB) als Satzung beschlossen. Das Plangebiet befindet sich im Osten von Wiesbaden, in unmittelbarer Nähe zu den Stadtteilen Erbenheim und Mainz-Kastel und umfasst eine Fläche von rund 450 Hektar. Ziel der Planung ist es, einen ausgewogenen Mix aus bezahlbarem Wohnen, Arbeiten, Freiflächen und Biotopflächen herzustellen. Entstehen soll ein innovativer und zukunftstauglicher Stadtteil mit überwiegender Wohnnutzung und zugleich auch ausreichend Raum für Gewerbe. Die LHW lobte am 15. Juli 2023 gemeinsam mit der Stadtentwicklungsgesellschaft Wiesbaden (SEG) als Entwicklungsträger und Treuhänder der städtebaulichen Entwicklungsmaßnahme Ostfeld einen europaweiten offenen zweiphasigen städtebaulichen und landschaftsplanerischen Ideenwettbewerb als kooperatives Verfahren aus. Die Stadtverordnetenversammlung (STVV) der LHW hat mit Beschluss vom 3. Juli 2025 bestätigt, dass der durch das Preisgericht gekürte Entwurf des 1. Preisträgers Studio Wessendorf mit DLA Die Landschaftsarchitekten Bittkau- Bartfelder PartGmbB für den Bereich "Landschaftsraum/Stadtquartier" die Grundlage für die zu erarbeitende Rahmenplanung für den gesamten Entwicklungsbereich der SEM Ostfeld bildet. Im nächsten Schritt wird eine Rahmenplanung aufbauend auf dem Siegerentwurf für den Bereich "Landschaftsraum/Stadtquartier" in einem iterativen Prozess aus verschiedenen Fachdisziplinen erarbeitet. Sie bildet die strategische Grundlage für die langfristige und nachhaltige Entwicklung des neuen Stadtquartiers Ostfeld. Sie konkretisiert die städtebaulichen, freiräumlichen und funktionalen Leitlinien auf Basis der beschlossenen Entwicklungsziele der LHW und dient als verbindlicher Orientierungsrahmen für die weiteren Planungsschritte. Die Rahmenplanun
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Department of the Environment Climate and Communications.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.