Coiste Forbartha Na CarraigeCarrickTED
New Playground equipment and upgrade works at Carrick Playground
Lot 1 Provide and install new playground equipment and repairs to existing playground Lot 2 Remove and disposal existing 16m section of fence and replace with a 19m section of fence incorporating a 2.5m gate all to match existing Lot 3 Resurface of existing footpath (135 Sqm) with non slip resin bonded gravel and install 25m of handrail a...
Stahlbau, Fenster & Türen, Pflasterarbeiten, Spielplatzgeräte
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Lot 1 Provide and install new playground equipment and repairs to existing playground Lot 2 Remove and disposal existing 16m section of fence and replace with a 19m section of fence incorporating a 2.5m gate all to match existing Lot 3 Resurface of existing footpath (135 Sqm) with non slip resin bonded gravel and install 25m of handrai...
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Coiste Forbartha Na Carraige
- Veröffentlicht:
- 19. März 2026
- Frist:
- 22. April 2026
- Thema:
- Stahlbau
- Bauobjekt:
- Spielplatz
Bauobjekt-Klassifikation
- SpielplatzHauptobjekt
Ausschreibungsbeschreibung
Lot 1 Provide and install new playground equipment and repairs to existing playground Lot 2 Remove and disposal existing 16m section of fence and replace with a 19m section of fence incorporating a 2.5m gate all to match existing Lot 3 Resurface of existing footpath (135 Sqm) with non slip resin bonded gravel and install 25m of handrail along footpath.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
2- Ministry of sportsSkopjeFrist: 23. Juni
Supply and installation of sports and urban equipment for the renovation of neighborhood multi-purpose playgrounds
Supply and installation of sports and urban equipment for the renovation of neighborhood multi-purpose playgrounds 1.Construction/application of acrylic resin as a base layer in 1 coat with a minimum thickness of 1 mm for a sports field. m2 1 2.Supply, transport, and installation of artificial football turf. Pile height: 50 mm. m2 1 3.Supply, transport, and installation of artificial football turf. Pile height: 40 mm. m2 1 4.Supply, transport, and installation of artificial football turf. Pile height: 30 mm. m2 1 5.Supply, transport, and installation of artificial football turf. Pile height: 20 mm. m2 1 6.Supply, transport, and installation of expansion strips for polypropylene modular flooring with a thickness from 8 mm to 22 mm and width from 30 mm to 90 mm for sports fields, UV-stabilized and wear-resistant, in a color selected by the investor. m 1 7.Supply, transport, and installation of polypropylene modular flooring with a thickness from 8 mm to 22 mm for sports fields, UV-stabilized and wear-resistant, in a color selected by the investor. m2 1 8.Supply, transport, and installation of purpose-made cast rubber with machine application of a mixture of SBR granules and polyurethane, with a thickness of 5 mm. The installed materials must be safe for human health and the environment. m2 1 9.Supply, transport, and filling/application of SBR rubber granules. m3 1 10.Supply and installation/application of quartz sand with granulation from 0.4 mm to 0.8 mm. m3 1 11.Supply and bonding using special two-component polyurethane adhesive for concrete or asphalt. Consumption: 1 kg/m². m2 1 12.Supply and bonding using special two-component polyurethane adhesive for concrete or asphalt. Consumption: 0.2 kg/m¹. m 1 13.Supply and installation of sand/gravel without mud and dust for children’s playgrounds, gray-white in color. m3 1 14.Supply, transport, and installation of purpose-made cast rubber flooring with a mixture of EPDM rubber granules and polyurethane in a layer from 1 mm to 3 mm, in a color selected by the investor. m2 1 15.Smoothing of concrete slab/screed using a power trowel (“helicopter”). m2 1 16.Milling/scraping of damaged asphalt or concrete up to 3 mm using a machine. m2 1 17.Construction/execution of screed with thickness d = 10 cm. m2 1 18.Construction/execution of screed with thickness d = 5 cm m2 1 19.Concreting of floor slab with thickness d = 10 cm using MB20 concrete, including formwork installation. m2 1 20.Supply and installation of ribbed and smooth reinforcement bars up to Ø12 mm. kg 1 21.Rolling/compaction of the base layer. m2 1 22.Base course installation in a 10 cm layer using crushed stone 0–40 mm with required compaction. m2 1 23.Marking/lining of a (standard) 80 m tennis court on concrete and acrylic surface (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 24.Marking/lining of a (standard) 80 m volleyball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 25.Marking/lining of a (standard) 100 m handball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 26.Marking/lining of a (standard) 120 m football field (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 27.Marking/lining of a (standard) 120 m basketball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 28.Painting of sports equipment in a shade/color selected by the investor. m2 1 29.Concreting of footing bases with MB20 concrete for sports equipment. m3 1 30.Manual excavation of soil for concreting footing bases for sports courts/playgrounds. m3 1 31.Supply and installation of steel elements for sports courts/playgrounds and other purposes. kg 1 32.Supply and installation of processed planed white pine boards with minimum thickness d = 15 mm for sports equipment and other elements. m2 1 33.Supply and installation of processed planed pine boards with minimum thickness d = 15 mm for sports equipment and other elements. m2 1 34.Supply and installation of standard tennis net with mesh opening max. 4 × 4 cm and rope thickness min. 2''. piece 1 35.Supply and installation of standard volleyball net with mesh opening max. 20 × 20 cm and rope thickness min. 2''. piece 1 36.Supply and installation of rubber shock absorbers between the metal frame and the glass basketball backboard. kg 1 37.Supply and installation of standard basketball hoop net (mesh) with 12 loops/openings. piece 1 38.Supply and installation of hinged basketball rim for basketball structure with spring mechanism, 4 bolts, and minimum diameter of 45 cm. piece 1 39.Supply and installation of standard steel rims for basketball structure complete with 4 bolts and minimum diameter of 45 cm. piece 1 40.Supply and installation of new standard basketball backboards made of polycarbonate, minimum thickness d = 8 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 41.Supply and installation of new standard basketball backboards made of plexiglass, minimum thickness d = 8 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 42.Supply and installation of new standard basketball backboards made of perforated sheet metal, minimum thickness d = 3 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 43.Supply and installation of new standard basketball backboards made of tempered glass, minimum thickness d = 8 mm, with dimensions 1.8 m × 1.05 m. piece 1 44.Supply and installation of new standard basketball backboards made of polyester, with minimum dimensions 1.8 m × 1.05 m and minimum thickness d = 3 mm. piece 1 45.Supply and installation of protective net behind goals with mesh openings max. 20 × 20 cm and rope thickness min. 2'', edged with tensioning rope. m2 1 - SmartPly Europe DACSlieveureFrist: 05. Juni
RFT to Modify + Install Upgraded Air Extraction Duct Work on our Coating Line T+G Area at SmartPly Europe DAC ‘26
SMARTPLY Europe DAC is seeking suitably qualified engineering companies to modify and install an upgraded Air Extraction Duct system in the Coating Line and T+G (Tongue + Groove) area of the plant at our site in Belview Port, Slieverue, via Waterford (X91 PX75). This system is required to improve airflow in the ducts and provide separate Bag House connections for each production line. All ducting and final detailed drawings will be supplied by Scheuch GmbH (Free Issue to the Contractor). The Contractor is responsible for all installation, bracketry, lifting, safety documentation, and associated works as detailed below. It is envisaged that the works will take place during SmartPly’s Annual Shutdown: 24th August – 4th September 2026, with pre-shutdown works permitted in the weeks prior. Due to the nature of works as set out in this tender and other maintenance + construction activity being carried out on site, these have been deemed to be "CONSTRUCTION WORK" as per the HSA's Safety, Health and Welfare at Work (Construction) Regulations 2013. The successful Bidder will operate as "CONTRACTOR" and will be required to provide site-specific Risk Assessments, Method Statements, Training + Induction Records, Plant Certification, Lift Plans, and other requested information associated with the works. Client: SmartPly – Belview Port, Slieverue, via Waterford. Contact: Ciaran Brennan – 051 831 48 PSCS Successful Bidder Detailed Scope of Works The Contractor shall provide all labour, plant, lifting equipment, access platforms, bracketry, fixings and safety documentation necessary to complete the following works: Ducting Installation + Modification (Based on Drawing AT-03570328a) • Install and modify ducting as per Scheuch GmbH drawings (green = existing, black = new). • Remove existing ducting (Ø630mm) running from the Coating Line to Bag House 01 (BH01). • Replace with new reduced-size ducting (Ø400mm) running from the T+G Line to BH01. • Install new ducting (Ø630mm) running from the Coating Line to Bag House 04 (BH04), connecting into existing ducting (Ø710mm). • Remove the ducting line fitted under the existing Ø710mm line and blank off the opening. • Install new ducting of various diameters from the Splitter Saw to BH01, connecting into the lower extraction from the two Tenor machines and the QC Saw. Removal of Existing Ducting • Removal of existing ducting. Note: This shall be recorded in the RAMS for prior approval. Lifting Equipment + Access Platforms • The Contractor is responsible for all plant, lifting equipment, and access platforms (temporary, mobile, or fixed) required to carry out the works at heights of up to 19m above ground level. Start-Up Support + Commissioning • Provide start-up support. • Offer technical support for commissioning team. Handover Documentation The Contractor shall provide: • Site-specific Risk Assessments + Method Statements (RAMS) – to be issued 21 days prior to shutdown work commencing. • Lift plans and associated safety documentation. • Training + Induction Records. • Plant Certification. • As-installed documentation (if any variation from Scheuch drawings). Health + Safety Compliance The Contractor is responsible for all EHS requirements associated with the works, including but not limited to: • Complying with site rules and the safety + health plan. • Identifying hazards and eliminating or reducing risks. • Providing site-specific induction for all workers. • Appointing a safety officer where more than 20 persons are on site. • Reporting accidents to the Authority and to the PSCS where an employee cannot perform normal work for more than three days. All works must comply with: • Safety, Health and Welfare at Work Act 2005 • General Application Regulations 2007 • Construction Regulations 2013
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 22. April 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Coiste Forbartha Na Carraige.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.