Health Service Executive (HSE)KildareTED
Laboratory Refurbishment Works, Midland Regional Hospital Mullingar, Co Westmeath
Refurbishment works to existing Laboratory facilities within Regional Hospital Mullingar, including replacement of flooring, installation of suspended ceilings, internal wall insulation, and installation of M and E services.
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Refurbishment works to existing Laboratory facilities within Regional Hospital Mullingar, including replacement of flooring, installation of suspended ceilings, internal wall insulation, and installation of M and E services.
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Health Service Executive (HSE)
- Veröffentlicht:
- 17. Februar 2026
- Frist:
- Nicht angegeben
- Bauobjekt:
- Krankenhaus / Klinik
Bauobjekt-Klassifikation
- Krankenhaus / KlinikHauptobjekt
Ausschreibungsbeschreibung
Refurbishment works to existing Laboratory facilities within Regional Hospital Mullingar, including replacement of flooring, installation of suspended ceilings, internal wall insulation, and installation of M and E services.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Health Service Executive (HSE)Kildare
Window Replacement Works, St. Mary’s Hospital, Mullingar, Co. Westmeath
Replacement of existing windows within an existing protected structure hospital building and associated builder's works. - Health Service Executive (HSE)Kildare
Window Replacement Works, St. Mary’s Hospital, Mullingar, Co. Westmeath
Replacement of existing windows within an existing protected structure hospital building and associated builder's works. - Kingdom Homecare Services LtdTraleeFrist: 09. Apr.
Bluebird Care Day Centre – Fit-Out and Refurbishment Works
Internal fit-out and refurbishment of first floor of existing two-storey building for use as a day care and activity centre. Works include demolition of existing internal partitions and finishes; new drywall partition systems; fully accessible Wet Changing Room compliant with TGD Part M including full room XY/H-Frame ceiling track hoist; kitchen fit-out; sensory rooms with Autex Acoustics treatment; quiet rooms; office W.C.; protected corridor; electrical installation; mechanical ventilation with heat recovery; plumbing, drainage and water services; external wall insulation upgrade; attic insulation; fire safety works; Disability Access Certificate (DAC) compliance; and all associated finishes, fixtures and fittings. - Health Service Executive (HSE)KildareFrist: 06. März
Replacement and Refurbishment of Bed Passenger Lifts at Midland Regional Hospital, Tullamore, Co. Offaly
The project comprises of the full replacement of six (6) no. bed passenger lifts including minor electrical, builders and decorative works at Midland Regional Hospital Tullamore, Co. Offaly. - Health Service Executive (HSE)Kildare
Alteration Works to the Non-Clinical Areas of the Existing Mortuary, Midland Regional Hospital, Tullamore, Co. Offaly
Proposed alteration works to the non-clinical areas of the exiting single storey Mortuary Building, located to the South of the campus, including new external stone wall cladding with wall-mounted signage to the front/east elevation and internal reconfiguration to provide new Family Room, new kitchenette and stores and new access to adjacent garden area, together with all associated site works. - Inland Fisheries IrelandDublinFrist: 11. Mai
Galway Weir Lodge Upgrade and Refurbishment
Thermal upgrade and alterations to Weir Lodge including demolitions, asbestos removal, external/internal refurbishment, ground floor upgrades, minor roof alterations, thermal enhancement, stairs reconfiguration, window/door replacement, redecoration, internal fixed furniture fitout, sanitary ware fitout, mechanical installation and associated builder's works. Temporary works required to ensure uninterrupted operation of surrounding IFI Offices, Fishery and Facilities. - Health Service Executive (HSE)Kildare
Reconfiguration of Hydrotherapy Pool at Midland Regional Hospital, Tullamore, Co. Offaly
The development consists of the Reconfiguration of the existing Hydrotherapy pool area in Midlands Regional Hospital Tullamore to create new consultation rooms and ancillary spaces. The existing hydrotherapy pool is to be filled in with the removal of all ancillary pool equipment and plumbing fixtures and for the fitout of the area to create 6 No. new consultation rooms and ancillary spaces at Midland Regional Hospital, Tullamore. - Office of Public Works (OPW)Trim
Sligo Garda Station Internal Alterations
Internal modifications to the existing station over ground first and second floors to comprise of modifying existing rooms and offices including destruction and construction of inner walls new inner windows doors floor finishes and ceiling repairs. New M and E Services to all 3 floor areas. - Health Service Executive (HSE)Kildare
Alteration Works to the existing Laundry and Drier Rooms at Abbeyleix CNU, Abbeyleix Health Centre, Knocknamoe, Abbeyleix, Co. Laois.
Reconfiguration of existing Laundry and Drier rooms located on ground floor level including the replacement and relocation of existing washing and drying machines, replacement of existing internal and external doors and windows and redecoration of both rooms as well as works to the Comms room located on first floor level, together with all associated works. - St. Francis College (Rochestown)South-WestFrist: 27. März
Refurbishment Works to Existing Science Lab at St. Francis College, Rochestown
Refurbish the existing science lab, store, and prep room in the existing school building. Demolition and removal of existing wall, doors, ceilings, finishes, services, furniture, and equipment is required to refurbish and upgrade the existing science lab, prep room, and store.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Health Service Executive (HSE).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.