Infrastructure MaltaLuqaTED
IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Construction of a new cargo facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Construction of a new cargo facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Infrastructure Malta
- Veröffentlicht:
- 31. Mai 2026
- Frist:
- 03. August 2026
- Bauobjekt:
- Hafen- / Kaianlage
Bauobjekt-Klassifikation
- Hafen- / KaianlageHauptobjekt
Ausschreibungsbeschreibung
Construction of a new cargo facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Infrastructure MaltaLuqaFrist: 01. Okt.
IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta. - Ministère de la Mobilité et des Travaux publicsLuxembourgFrist: 29. Juni
Operating of a New Aviation Fuel Facility
The Contracting Entity seeks an experienced Operator to operate, maintain and manage a new Fuel Facility at the Airport under Open Access principle. The Operator will supply JET A-1, including the existing P10 cargo apron hydrant system, for a fixed term of 10 years, and undertake technical responsibilities for additives for F34 for military/NATO use. The Contracting Entity retains ownership. - Donegal County Council_1193LiffordFrist: 27. Juli
Provision of Services for the Construction of a Harbour Maintenance Facility at Ailt an Chorráin Pier, Ailt an Chorráin, Co. Donegal
Ailt an Chorráin is located on the west coast of Donegal and has an active harbour. The project consists of the construction of a maintenance facility steel shed with steel sheeting to a 2.4m concrete wall with a mezzanine floor, designated as a storage facility. - Department of ContractsFloriana
CT2093/2025 DESIGN AND BUILD TENDER FOR THE CONSTRUCTION OF A SKIP MANAGEMENT FACILITY AND AMENITIES AT ECOHIVE COMPLEX, MAGĦTAB WITH A REDUCED ENVIRONMENTAL IMPACT
DESIGN AND BUILD TENDER FOR THE CONSTRUCTION OF A SKIP MANAGEMENT FACILITY AND AMENITIES AT ECOHIVE COMPLEX, MAGĦTAB WITH A REDUCED ENVIRONMENTAL IMPACT - Sectoral Procurement DirectorateFlorianaFrist: 05. Juni
SPD1/2026/044 - Re- Issue: Tender for the Mechanical and Electrical Installation and Finishing Works, in Environmentally Friendly Materials, at the Dental Laboratory in the Biomedical Building of University of Malta
Mechanical and electrical installation and finishing works using environmentally friendly materials at the Dental Laboratory, Biomedical Building, University of Malta. - Central Bank of MaltaValletta
Tender for the Design, Development and Hosting of a New Website to the Central Bank of Malta - CBM 05/2025
Tender for the Design, Development and Hosting of a New Website to the Central Bank of Malta as detailed in the tender documentation. - Department of ContractsFloriana
CT2208/2025 - Tender for the Demolition, Excavation, Construction, Finishes, M and E's and Landscaping Works using Env. Friendly Products for the Armed Forces of Malta
Demolition, Excavation, Construction, Finishes, M and E's and Landscaping works using Env. Friendly Products up to and including elements of design, hand-over and commissioning of buildings at the Air Wing of the Armed Forces of Malta - Beaumont Hospital_403DublinFrist: 13. Apr.
The Design, Construction, Installation and Commissioning of the New National Genomics Laboratory using PW-CF2
Beaumont Hospital intends to award a contract to a suitably qualified and experienced contractor for the design, construction, installation and commissioning of a new National Genomics Laboratory, which shall be a fully compliant modular building integrated into the Beaumont Hospital campus. The Contracting Authority has determined that a modular facility is required. The successful tenderer shall assume responsibility for off-site modular fabrication (either in its own right or through the engagement of subcontractors) and for the delivery, lifting, alignment and positioning of all modular building units. The two-storey modular accommodation is to be sited to the rear of the Hospital’s Technical Services Department and adjacent to the Laboratory Directorate in a busy car parking area. For the avoidance of doubt, as this competition concerns a design and build contract, the successful tenderer identified by this competitive process shall assume responsibility for undertaking all necessary works (including all civil, structural, MEP, ICT, statutory compliance and certification requirements) to deliver a fully-operational facility. - Athletics MaltaMarsaFrist: 06. Juli
(RE-ISSUE) TENDER FOR THE SUPPLY AND COMMISSIONING OF A NEW PASSENGER LIFT AT THE AT MATTHEW MICALLEF ST.JOHN ATHLETICS STADIUM, MARSA
THE SUPPLY AND COMMISSIONING OF A NEW PASSENGER LIFT AT THE AT MATTHEW MICALLEF ST.JOHN ATHLETICS STADIUM, MARSA - Olivia PakenhamRathfarnham, Dublin 14Frist: 15. Juli
RFT for the provision of services to undertake a review of the infrastructure for aviation fuel transport and storage
In summary, the Services comprises an assessment is to analyse the extent to which the existing infrastructure for the transport and storage of aviation fuels (CAF and SAF), will meet future requirements between now (2026) and 2050, and whether steps need to be taken to enable and secure the future transport and storage of aviation fuels into and within Ireland. As part of the study, an analysis of the commercial potential for a future blending facility or facilities in Ireland should also be undertaken.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 03. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Infrastructure Malta.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.