Improvement of water and wastewater infrastructure in the Gorski Kotar Region, Croatia
LOT 1 - Rehabilitation of water supply pipelines in part of the settlement of Lokve – DIP settlement and construction of public sewer system of the settlement of Lokve – PART 1. The project includes the construction of sanitary sewers in part of the Lokve agglomeration (DIP settlement) in the length of 246.50 m', rehabilitation of pa...
Leitungsbau, Kanalbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Öffentlicher Auftraggeber
- Veröffentlicht:
- 10. April 2026
- Frist:
- Nicht angegeben
- Thema:
- Leitungsbau
- Bauobjekt:
- Trinkwasserleitung / Versorgungsnetz
Bauobjekt-Klassifikation
- Trinkwasserleitung / VersorgungsnetzHauptobjekt
- Kanalnetz / Abwasserkanal
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
LOT 1 - Rehabilitation of water supply pipelines in part of the settlement of Lokve – DIP settlement and construction of public sewer system of the settlement of Lokve – PART 1. The project includes the construction of sanitary sewers in part of the Lokve agglomeration (DIP settlement) in the length of 246.50 m', rehabilitation of part of the water supply system of Lokve (DIP settlement) in the length of 383.77 m', inspection of state, development of implementation designs, as-built surveys, reports on as-built state and supporting documents necessary for works performance and obtaining Use Permits;LOT 2 - Construction of the water supply system and public sewer system in the municipality of Ravna Gora (Cagar) and rehabilitation of a section of water pressure pipeline PS Šije – WT Kosa. The project includes the construction of the water supply pipeline in the length of 835.00 m' and construction of the public sewer system in the length of 722.18 m' in the settlement of Cagar, and rehabilitation of the water pressure pipeline PS Šije – WT Kosa in the length of 387.78 m', with the development of implementation designs, as-built survey, report on as-built state and supporting documents necessary for works performance and obtaining Use Permits;LOT 3 - Rehabilitation of transmission pipeline WT Sv. Ilija – WT Nadvučnik. The project includes the construction of a bypass, the replacement of 7,449 m, and the development of implementation designs, as-built surveys, reports on as-built state and supporting documents necessary for works performance and obtaining Use Permits.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
3 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Ähnliche Bekanntmachungen
7Framework agreement for the procurement of Water and Sewage parts, PVC pipes, cast iron pipes, water pipeline fixtures and parts etc.
Hå kommuneVARHAUGFrist: 24. Apr.Hå municipality, hereafter called the contracting authority, invites tenderers to a competition for the delivery of PVC pipes, water pipeline fixtures and parts for sites and projects carried out on their own.Integration of distribution locations from the watersupply system of Prilep City into the existing SCADA system and GIS system (PUE "Water Supply and Sewage")
Prilep MunicipalityPrilepFrist: 14. Apr.Integration of distribution locations from the watersupply system of Prilep City into the existing SCADA system and GIS system (PUE "Water Supply and Sewage")WSC/T/017/2026 - SUPPLIES – PERIOD CONTRACT FOR THE SUPPLY AND DELIVERY OF MANHOLE COVERS AND SURFACE BOXES TO THE WATER SERVICES CORPORATION
Water Services CorporationLuqaFrist: 11. MaiThe subject of this tender is a period contract for the supply and delivery of Manhole Covers and Surface Boxes to the Water Services Corporation.Implementation of the Water Framework Directive - Policy Coherence, Managing Trade-Offs, Financing and Capacity
Tipperary County CouncilClonmel, NenaghFrist: 15. Apr.The objective of this research is to support the Forum to develop policy advice on the implementation of the 3rd cycle RBMP and development of the 4th plan. Learnings from the research are expected to inform Forum members about the existing obstacles in implementing the WFD in Ireland and to make recommendations about what can be strengthened going into the 4th cycle. In 2021, the Institute of Public Administration (IPA) assessed water governance in Ireland using the OECD Water Governance IndicaProvision, implementation, maintenance and operation of an Integrated System for the Department of Insolvency (DoI) and the provision of Infrastructure as a Service (IaaS)-TA 03/2024
Department of InsolvencyΛευκωσίαFrist: 30. JuniProvision, implementation, maintenance and operation of an Integrated System for the Department of Insolvency (DoI) and the provision of Infrastructure as a Service (IaaS)SPD1/2025/108 FRAMEWORK CONTRACT FOR THE SUPPLY OF DRINKING WATER CANISTERS, DISPENSERS AND STANDS FOR THE FOUNDATION FOR EDUCATIONAL SERVICES
Sectoral Procurement DirectorateFlorianaFRAMEWORK CONTRACT FOR THE SUPPLY OF DRINKING WATER CANISTERS, DISPENSERS AND STANDS FOR THE FOUNDATION FOR EDUCATIONAL SERVICESWSC/T/011/2026 - SUPPLIES – SUPPLY AND DELIVERY OF CONTROL PANELS WITH PLC MODULES FOR EXTENSION OF PEMBROKE REVERSE OSMOSIS PLANT OF THE WATER SERVICES CORPORATION
Water Services CorporationLuqaFrist: 19. MaiThe subject of this tender is the supply and delivery of control panels with PLC modules for the extension of Pembroke reverse osmosis plant for the water services corporation.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Öffentlicher Auftraggeber.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.