IDA IrelandDublinTED
IDA Ireland Demolition of Lissywollen House
The proposed works that form part of this package are outlined briefly below; • Demolition of all existing structures on the site • Removal and safe disposal of all materials on the site including tyres. The site is to be left free from all materials. • Following demolition, the contractor is to undertake a topographical survey to tie int...
Abbruch
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
The proposed works that form part of this package are outlined briefly below; • Demolition of all existing structures on the site • Removal and safe disposal of all materials on the site including tyres. The site is to be left free from all materials. • Following demolition, the contractor is to undertake a topographical survey to tie ...
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- IDA Ireland
- Veröffentlicht:
- 29. Juni 2026
- Frist:
- Nicht angegeben
- Thema:
- Abbruch
Ausschreibungsbeschreibung
The proposed works that form part of this package are outlined briefly below; • Demolition of all existing structures on the site • Removal and safe disposal of all materials on the site including tyres. The site is to be left free from all materials. • Following demolition, the contractor is to undertake a topographical survey to tie into the previous survey undertaken on the site to fill in the gaps that would now exist due to the buildings being removed. • Please note that no trees are to be damaged during the works, please refer to Noel Lane Tree care services Arboricultural Safety Assessment Report along with accompanying Tree Protection Order Map
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- John J. O'Sullivan and AssoicatesGlengarriffFrist: 17. Aug.
Restoration and Extension of Stone Cottage, Demolition of Two Stone Outbuildings, and Installation of New WWTS
1. The works consist of - Demolition of stone shed and block lean-to extension. - Refurbishment of old stone cottage – the cottage requires a new ground bearing floor slab and a new roof, the existing rubble stone walls will have to be raked out and repointed on the outside and plastered with insulating lime based plaster on the inside. The cottage needs all new windows and doors and full internal fitout. - Construction of a new 64m2 single storey extension - External site works – all site drainage and construction of a patio - Construction of a new Waste Water Treatment System - IDA IrelandDublin
Construction of a Viewing Platform on IDA Lands at Athenry, Co. Galway
The contractor shall be responsible for re-construction of an existing on-site viewing platform, remedial works to the viewing platform and all associated site works for its construction for IDA Ireland at Ballygarraun South, Athenry, Co. Galway. - Electricity Supply Board ( ESB )Dublin 2
Maintenance of ecars Electric Vehicle (EV) Charging Infrastructure in the Republic of Ireland (RoI)
The Contracting Entity intends to procure a contract for Maintenance of the ecars Electric Vehicle (EV) Charging Infrastructure in the Republic of Ireland (RoI) It is proposed that the Contract will include the maintenance, both preventative and corrective, of all ecars EV charging equipment across the Republic of Ireland . In addition to the charging equipment maintenance work, associated interface pillars, their components and cabling between it and the charging equipment, earthing, protective barriers, signage and signage posts, ground markings where required and MV substations. The successful tenderer will be responsible for the sourcing, management and storage of all materials including storing of full replacement units where required. The successful tenderer is responsible for ensuring that those working on the equipment are competent in regard to the specific equipment, have all the necessary training as required by equipment manufacturers, DC and AC test kits, electric vehicles with CCS connection for load tests as needed, tools and carry the necessary spares to address issues when traveling to sites. - The Countrywomens TrustTERMONFECKINFrist: 22. Juni
“Request for Tender for Roof Repairs at An Grianán Adult Education College, Termonfeckin, Co. Louth”
Roof repair and associated works at An Grianan. The works include removal of existing damaged roof materials, installation of a new roofing system, flashing, waterproofing, insulation, rainwater goods and all necessary ancillary works to complete the project. The contractor will be responsible for site setup, safety management, waste disposal and compliance with all relevant building regulations. This is a single lot works contract and will be awarded on the basis of the Most Economically Advantageous Tender using a 70 percent price and 30 percent quality weighting. - Westmeath County CouncilMullingar
Demolition of Former Community Hall and Surrounding Services and Hard Standing Areas At Kinnegad, Co. Westmeath
Demolition of the former community hall building including asbestos removal, foundations, surrounding services, and hard standing areas at Kinnegad, Co. Westmeath. Site area approx. 1.33 hectares. Part of a larger Town Park development, but this tender is limited to demolition works as shown on drawings. - IDA IrelandDublinFrist: 21. Aug.
IDA Belview Infrastructure Development, Belview, Slieverue, County Kilkenny
The CfT is Stage 1 of a Restricted Two Stage Tender Process. The Contracting Authority is looking to shortlist suitable candidates to act as the Main Contractor for this development. Documents being provided at this stage are the Suitability Assessment Questionnaire Documents. The proposed Works consist of upgrade works to the local road L3412 and ancillary site development works which will provide access to the IDA Ireland land bank at Kilmurry, Slieverue and Gorteen, Belview, Co. Kilkenny. The proposal will provide an upgrade of local road L3412 from the existing eastern IDA Ireland roundabout to the new IDA Ireland land bank at Kilmurray and will tie back into the existing L3412 to the west via a new roundabout. The upgrade will be taken online on the existing road and offline on adjoining land. - Electricity Supply Board ( ESB )Dublin
The provision of ESB Communication Tower Compound Maintenance Weed Control services
Up to three Applicants will be admitted to the Framework Agreement which will utilise the cascade method where the service is always offered first to the Framework Member who was ranked first at the framework agreement award stage and, if this Framework Member is not in a position to perform the Service, to the second ranked Framework Member and so on. ESBT owns and operates circa 330 tower sites countrywide. Each tower is to be maintained on a 12 month rotating schedule throughout the term of the contract. The sites will be categorised into the number of expected visits each year. Red – 3 Visits equally spread apart across 12 months Amber – 2 Visits equally spread across 12 months. Green – 1 visit in a 12 month period. Reactive site visits base on ad hoc safety alerts. There will be continuous evaluation of the status of these sites on a yearly basis. The number of site visits required may go up or down. It is proposed that the Contract will include: Complete de veg of site compound. Cut back any overhanging trees/vegetation on site perimeter. 1 meter width of vegetation to cleared around compound where possible to ensure no further growth through fence line. Ensure access track to site is clear and free of any vegetation. Access tracks to specific sites to be cut back to ensure safe access (list to be provided). Clear vegetation that blocks access to any RFE (ESB Mini Pillars). Spray site with appropriate weed killer to target specific weeds to prevent continued growth. Record and report any additional findings on site. Photograph and document Pre and Post works for ESBT records. Submit a hand over document in a PDF format, which shows the extent of the works carried out. - Iarnród Eireann-Irish RailDublinFrist: 04. Sept.
Qualification System for Tree Felling and Vegetation Removal
Iarnród Éireann (IÉ) is seeking expressions of interest from suitably qualified applicants to establish a Qualification System for Tree Felling and Vegetation Removal. IÉ invites applications to participate in the pre-qualification process to appoint suitably qualified companies to a qualification system for Tree Felling and Vegetation Removal that may arise on a planned or emergency ad-hoc basis. These requirements can often include the need for ancillary services in conjunction with the main works of Tree Felling and Vegetation Removal. This Qualification System will consist of different types of work, including the below: • “Planned Works” - will apply to planned routine Tree Surgeon works. These will be notified and planned in advance of the works taking place based on a survey or recommendation by Irish Rail and its representatives. Irish Rail will allow sufficient time for tenderers to tender for these services. • “Emergency Works” - will apply to emergency works based on critical safety situations due to circumstances such as weather events, sudden or unpredicted safety concerns etc. and all other reactive situations where safety of the railway is of a critical and time sensitive nature. Irish Rail may require tenderers to tender and carry out these safety critical services in a prompt manner. Those companies successfully appointed to the Qualification System will receive all future tender enquiries during the term of the Qualification System. Please note that the following requirements will also apply to contracts awarded under this Qualification System: • Safe Pass - each employee working on or near the railway line will have to have a valid Safe Pass. • PTS (Personal Track Safety) – If awarded a contract, each employee working on or near the railway line will be required to have a valid PTS. Training courses are run by IÉ. • Manual Handling - due to the nature of the work all employees are required to have undertaken and successfully completed manual handling training. IÉ reserves the right to issue and award Framework Agreements from this QS during its lifetime. - Housing and Sustainable Communities AgencyDublin D02
Provision of Research Consultancy Services on the nature of Irish Traveller movement on an all-island basis
Research to provide evidence-based research on the nature and extent of travelling undertaken by Irish Travellers, to help to understand potential demand for transient halting sites on an all-island basis. This research is commissioned on behalf of the Department of Housing, Local Government and Heritage and the Northern Ireland Housing Executive. - Dublin City CouncilDublin
Dublin City Council Single Party Framework Agreement for the Provision of Facility Management Services
Dublin City Council (DCC) wishes to establish a single-party framework agreement for the provision of Facilities Management Services to the DCC at various site locations by using the competitive procedure with negotiation. The successful tenderer must be able to support, understand and deliver facilities management objectives and goals of the DCC. Initial contract will include services such as Planned Preventative Maintenance, Reactive Maintenance, Landscaping or Minor Works. All the site locations and initial types of services are specified in the Pre-Qualification Questionnaire document. Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 3384626
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist IDA Ireland.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.