Coillte CGAWicklowTED
Glenfarne Wood Phase 1 Project
Phase 1 – Core Elements • New trailhead building, incorporating toilets, a small office, storage facilities and an extended roofed area to support sheltered events and community activities. • Expanded parking facilities, increasing capacity from 10 to 33 spaces and introducing designated spaces for buses, campervans, boat trailers and bic...
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Coillte CGA
- Veröffentlicht:
- 17. Februar 2026
- Frist:
- 20. März 2026
Ausschreibungsbeschreibung
Phase 1 – Core Elements • New trailhead building, incorporating toilets, a small office, storage facilities and an extended roofed area to support sheltered events and community activities. • Expanded parking facilities, increasing capacity from 10 to 33 spaces and introducing designated spaces for buses, campervans, boat trailers and bicycles. • A new multi-access playground and sensory trail, located close to the trailhead building and providing an accessible link between the trailhead and the
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten49 Angaben erfasstUnterlagen
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
6TURNKEY CONTRACTOR TO SAMI NURSERY SCHOOL AND SHELTERED ACCOMMODATION FLATS IN KAUTOKEINO
Kautokeino kommuneKautokeinoFrist: 06. MärzKautokeino municipality has decided, in accordance with investment decisions (PS 28/25) to build a new nursery for 35 children and 20 sheltered accommodation flats co-located at the health centre in Kautokeino.The total gross area for the building is 2,269 m2 on the ground floor and a basement of 216 m2. A turnkey contractor shall be procured for the realisation of the project.Ballon GFC Clubhouse Project Phase 2 - Bauarbeiten für einen zweistöckigen Anbau zum aktuellen Clubhaus
Ballon GFCBallonFrist: 20. MärzBallon GFC Clubhouse Project Phase 2 - Building Works Building of a 2 Storey extension to current clubhouse Includes link building to current clubhouseTechnical Assistance for project Implementation Consultant the Great North Road (T2) Upgrade project - 2nd phase
European Investment BankLuxembourgConsultant to assist Road Development Agency (RDA) in implementing Great North Road (T2) Upgrade Project, continuing services from previous EIB contract. Tasks include supporting RDA's Project Implementation Team with procurement and contract management, implementing Environmental and Social Management Plan, Stakeholder Engagement Plan, and Resettlement Action Plan, conducting community sensitization on communicable diseases and environmental protection, and implementing road safety education programs along the project alignment.Design Team Consultancy Services for CNWQR PHASES 3A,3C and 4F Design and Build Housing Projects
Cork City CouncilCorkJoint Civil and Structural Engineer, Mechanical and Electrical Engineer, Fire Safety Engineer and PSDP Consultancy Services for the City Northwest Quarter Regeneration (CNWQR) Phases 3A,3C and 4F Design and Build Housing Projects. Suppliers are required to submit responses for all three lots under this competition. One supplier only will be selected.Hire and operation of water meters, equipment and cloud system for the Water and Sewage system - stage 1 qualification phase.
Bærum kommuneSANDVIKABærum municipality, hereafter called the contracting authority, invites tenderers to a competition with negotiations for a contract for the hire, installation and operation of water meters and cloud services for water and sewage. A more detailed description is in SSA-L Annex 1 Requirement Specifications (technical description).Procurement of a turnkey contract Hellerud VGS - renovation
Oslobygg KFOsloFrist: 11. MärzPURPOSE AND SCOPE The procurement is for the renovation of Building G at Hellerud Sixth Form College. The works include the complete upgrading of all surfaces in Level 2, all windows and doors shall be upgraded, the facade shall be reinstated to the original expression. See the requirement specifications for further documentation.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 20. März 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Coillte CGA.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.