European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsTED
FWC Legal and management support on the implementation of components of the European Space Programme
In the scope of the Regulation (EU) 2023/588 of the European Parliament and of the Council of 15 March 2023 establishing the Union Secure Connectivity Programme for the period 2023- 2027, the European Commission has signed a 12-year Concession Contract on 126 December 2024 for the development, the deployment and the operation of the Infra...
Projektmanagement, Digitalisierungsberatung, Unternehmensberatung, Rechtsberatung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
In the scope of the Regulation (EU) 2023/588 of the European Parliament and of the Council of 15 March 2023 establishing the Union Secure Connectivity Programme for the period 2023- 2027, the European Commission has signed a 12-year Concession Contract on 126 December 2024 for the development, the deployment and the operation of the In...
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs
- Veröffentlicht:
- 28. Juli 2026
- Frist:
- 29. September 2026
- Thema:
- Projektmanagement
Ausschreibungsbeschreibung
In the scope of the Regulation (EU) 2023/588 of the European Parliament and of the Council of 15 March 2023 establishing the Union Secure Connectivity Programme for the period 2023- 2027, the European Commission has signed a 12-year Concession Contract on 126 December 2024 for the development, the deployment and the operation of the Infrastructure for Resilience, Interconnectivity and Security by Satellite (IRIS²) programme. IRIS² consists in 264 LEO satellites, 18 MEO satellites and a ground infrastructure to be deployed by 2030 which aim at providing a secure, low-latency connectivity to EU Members States, Governmental users and Commercials users with a worldwide coverage. The programme will be split in 4 phases: 1. Phase 1: Supply chain consolidation This maximum 1-year phase will enable the IRIS² Concessionaire to finalise suppliers’ selection. This should also allow the creation of a Special Purpose Vehicle to handle the Concession Contract until its end in 12 years. 2. Phase 2: Development phase This 2-year phase will be mainly dedicated to the design and the development of the infrastructure. 3. Phase 3: Deployment phase This phase is expected to last 3 years and will be dedicated to the industrialisation, production and launch of the infrastructure. 4. Phase 4: Operation phase The rest of period of 12 years will consist in operating the IRIS² infrastructure and providing services. During these 4 phases, the European Commission will supervise the Concessionaire’s activities and collaborate with it to ensure the proper execution of the Concession Contract respecting the contractual performances, cost and schedule of IRIS². The envisaged Framework Contract is expected to cover these Phases 1, 2 and 3.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 15. Sept.
FWC Legal and management support on the implementation of components of the European Space Programme
In the scope of the Regulation (EU) 2023/588 of the European Parliament and of the Council of 15 March 2023 establishing the Union Secure Connectivity Programme for the period 2023- 2027, the European Commission has signed a 12-year Concession Contract on 126 December 2024 for the development, the deployment and the operation of the Infrastructure for Resilience, Interconnectivity and Security by Satellite (IRIS²) programme. IRIS² consists in 264 LEO satellites, 18 MEO satellites and a ground infrastructure to be deployed by 2030 which aim at providing a secure, low-latency connectivity to EU Members States, Governmental users and Commercials users with a worldwide coverage. The programme will be split in 4 phases: 1. Phase 1: Supply chain consolidation This maximum 1-year phase will enable the IRIS² Concessionaire to finalise suppliers’ selection. This should also allow the creation of a Special Purpose Vehicle to handle the Concession Contract until its end in 12 years. 2. Phase 2: Development phase This 2-year phase will be mainly dedicated to the design and the development of the infrastructure. 3. Phase 3: Deployment phase This phase is expected to last 3 years and will be dedicated to the industrialisation, production and launch of the infrastructure. 4. Phase 4: Operation phase The rest of period of 12 years will consist in operating the IRIS² infrastructure and providing services. During these 4 phases, the European Commission will supervise the Concessionaire’s activities and collaborate with it to ensure the proper execution of the Concession Contract respecting the contractual performances, cost and schedule of IRIS². The envisaged Framework Contract is expected to cover these Phases 1, 2 and 3. - European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsFrist: 25. Juli
FWC Legal and management support on the implementation of components of the European Space Programme
Rechtliche und managementbezogene Unterstützung für die Komponenten des Europäischen Weltraumprogramms (IRIS²), bestehend aus 264 LEO- und 18 MEO-Satelliten sowie Bodeninfrastruktur. Ziel: sichere, latenzarme Konnektivität weltweit. 4 Phasen: Phase 1 (max. 1 Jahr): Konsolidierung der Lieferkette; Phase 2 (2 Jahre): Entwicklung; Phase 3 (3 Jahre): Einsatz; Phase 4 (Rest): Betrieb. Der Rahmenvertrag deckt die Phasen 1-3 ab. - European Parliament, EP - Directorate-General for CommunicationBrussels
Provision of dark fibre links for audiovisual and data transmission between the European Parliament on one side, and the European Commission and the European Council on the other side
The Audiovisual Unit of the European Parliament is planning to award a public contract for the provision of dark fibre links for the purpose of transporting audio, video and data signals between the European Parliament on one side, and the European Commission and the European Council on the other side. This fibre connectivity is required for the inter-institutional audiovisual live signal transmission, as well as data and file exchange. These links are essential for the transparency of the European Parliament activities and assure the EP contribution to the European Broadcasting Service. - The General Secretariat of the Council of the European UnionBrusselsFrist: 30. Sept.
Provision of audio-visual and maintenance services to the Council of the European Union/European Council and audio-visual services to the European External Action Service
The purpose of this call for tenders is to establish a framework service contract for a maximum duration of five years relating to the provision of audio-visual and maintenance services to cover the needs of the Council of the European Union, European Council (GSC) and - in part - of the European Externa Action Service (EEAS). The main objective of the FWC is to provide photo and video coverage of EU events and personalities as a service to the media and other stakeholders such as governments, as well as for the public. The FWC also covers content creation for social media, and the operation of Audio-Visual and Broadcast Infrastructure and equipment. - Water Services CorporationLuqaFrist: 10. Aug.
WSC/T/045/2026 - SUPPLIES - FRAMEWORK AGREEMENT FOR THE SUPPLY, INSTALLATION AND MAINTENANCE OF NB-IOT TRANSMITTERS FOR SMART WATER METERING - WATER SERVICES CORPORATION
The subject of this framework agreement is the implementation by the Water Services Corporation (WSC) of an extensive deployment of NB-IoT water meter transmitters across its infrastructure. This tender calls for the supply, delivery, installation, commissioning, and network maintenance of a minimum of 15,000 units and up to a maximum of 20,000 units, to be deployed over a maximum period of three (3) years from the contract start date up to a possible extension of 1 year. The total contract price shall include installation and commissioning for a minimum of 200 interventions, up to a maximum of 1200 interventions which are to be carried out over the duration of the contract period. - Water Services CorporationLuqaFrist: 27. Aug.
WSC/T/045/2026 - SUPPLIES - FRAMEWORK AGREEMENT FOR THE SUPPLY, INSTALLATION AND MAINTENANCE OF NB-IOT TRANSMITTERS FOR SMART WATER METERING - WATER SERVICES CORPORATION
The subject of this framework agreement is the implementation by the Water Services Corporation (WSC) of an extensive deployment of NB-IoT water meter transmitters across its infrastructure. This tender calls for the supply, delivery, installation, commissioning, and network maintenance of a minimum of 15,000 units and up to a maximum of 20,000 units, to be deployed over a maximum period of three (3) years from the contract start date up to a possible extension of 1 year. The total contract price shall include installation and commissioning for a minimum of 200 interventions, up to a maximum of 1200 interventions which are to be carried out over the duration of the contract period. - Water Services CorporationLuqaFrist: 10. Aug.
WSC/T/045/2026 - SUPPLIES - FRAMEWORK AGREEMENT FOR THE SUPPLY, INSTALLATION AND MAINTENANCE OF NB-IOT TRANSMITTERS FOR SMART WATER METERING - WATER SERVICES CORPORATION
The subject of this framework agreement is the implementation by the Water Services Corporation (WSC) of an extensive deployment of NB-IoT water meter transmitters across its infrastructure. This tender calls for the supply, delivery, installation, commissioning, and network maintenance of a minimum of 15,000 units and up to a maximum of 20,000 units, to be deployed over a maximum period of three (3) years from the contract start date up to a possible extension of 1 year. The total contract price shall include installation and commissioning for a minimum of 200 interventions, up to a maximum of 1200 interventions which are to be carried out over the duration of the contract period. - Marsaskala Local CouncilMARSASKALAFrist: 31. Juli
Supply of Hotel-Guesthouse Accommodation in Marsaskala for approximately One Hundred (100) Rooms on a Bed and Breakfast (BnB) Basis as part of the Citizens, Equality, Rights and Values Programme (CERV) of the European Commission
The subject of this tender is the supply of hotel-guesthouse accommodation in Marsaskala for approximately one hundred (100) rooms on a bed and breakfast (BnB) basis. Between one hundred fifty (150) and one hundred sixty (160) Douzelage delegates will be in Malta to attend the Tackling Domestic Violence in the Local Community under the Citizens, Equality, Rights and Values Programme (CERV) of the European Commission. The project focuses on the collaboration of towns from twenty-six (25) member states covering most of the EU. This programme will be a collaboration of the Douzelage members which is one of the largest town twinning associations in Europe. The place of acceptance of the supplies shall be at Marsaskala, the time-limits for the execution of the contract shall be between Thursday 3rd and Sunday 6th September 2026. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 20. Aug.
Development and Implementation of an EU Business-to-Business and Market Access Support Programme for South African Biotechnology Companies
The programme "Vaccines for Africa: Roll-out and Production in South Africa" (SAVax) is co-financed the Federal Republic of Germany"s Federal Ministry for Economic Cooperation and Development (BMZ) and the European Union (EU) and implemented by GIZ. The program is part of, and contributes to, the Team Europe Initiative on Manufacturing and Access to Vaccines, Medicines, and Health Technologies (TEI MAV+) for Sub-Saharan Africa. The GIZ SAVax programme seeks to strengthen South Africa"s biopharmaceutical and biotechnology innovation ecosystem by enabling targeted international collaboration, market access, and capacity development for companies in order to support their readiness for investment and/or technology partnerships. The objective of this assignment is therefore to engage a consultant, or a consortium of consultants, for the development and implementation of a tailored support programme, linking South African biotechnology companies and key stakeholders within the EU life sciences and biotechnology ecosystems. Work Package 1 (WP1): Needs Assessment and Programme Design Work Package 2 (WP2): Preparation & Matchmaking Work Package 3 (WP3): EU Immersion Programme Delivery Work Package 4 (WP4): Post-Exchange Follow-Up & Partnership Activation - University of Galway (ID 1400)GalwayFrist: 31. Juli
COSE1835.26 Supply, Delivery, Installation, and Maintenance of a wide-field microscope with a deconvolution system for University of Galway
It is intended that the framework will be used for all of University of Galway’s requirements for an integrated automated microscope imaging and analysis system. The contract will be to supply a wide-field microscope with deconvolution, along with a minimum of 5 years total warranty (1 year standard + 4 years extended). The scope of this tender includes a live cell imaging system and a minimum 5-year service contract. This will include all IT hardware and software necessary to run the system and provide tools for image analysis and deconvolution pipelines.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 29. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.