Oslo kommune v/ Vann- og avløpsetatenOsloTED
Framework agreement for electronic security.
The objective of this agreement is to ensure the performance and function requirements connected to the electronic security of objects connected to the Agency for Water and Sewerage Works (VAV/Contracting Authority). VAV has several industrial plants connected to water production, water distribution and sewage management, as well as admin...
Videoüberwachung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Oslo kommune v/ Vann- og avløpsetaten
- Veröffentlicht:
- 18. Mai 2026
- Frist:
- 11. Juni 2026
- Thema:
- Videoüberwachung
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The objective of this agreement is to ensure the performance and function requirements connected to the electronic security of objects connected to the Agency for Water and Sewerage Works (VAV/Contracting Authority). VAV has several industrial plants connected to water production, water distribution and sewage management, as well as administration premises that are secured or shall be secured. The installations vary greatly in size and consist of a few large industrial rock installations for water treatment and sewage treatment, elevated basins for storing water, and several smaller pumping stations for water and sewage. See annex 1 - Requirement Specifications for further information on the procurement ́s purpose and extent.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
8Framework agreement for the purchase of CO2 for water treatment
Oslo kommune v/ Vann- og avløpsetatenOsloThe Agency for Water and Sewerage Works (VAV) needs to deliver CO2 that is used for water treatment at VAV ́s facilities. VAV shall enter into a new framework agreement for CO2 for the facilities at Oset and Skullerud. The need for CO2 delivered to the plants is estimated to be approx. 2,800 tonnes per annum, divided in approx. 2,500 tonnes at Oset and approx. 300 tonnes at Skullerud VBA. The consumption is evenly distributed throughout the year. The stated volume is estimated from the current consumption and is only meant as information to tenderers. From 2028 it is expected that consumption at Oset will be reduced. The extent of this is uncertain. Tenderers shall also offer maintenance/service of the CO2 plant and gas safety courses. A site inspection will be held, see the tender documentation point 3.2 for further information.Framework agreement for consultancy engineering services
Sunnhordland Innkjøpsforum v/Bømlo kommuneBremnesSunnhordland Innkjøpsforum, on behalf of Bømlo, Stord, Fitjar, Kvinnherad and Tysnes municipalities, invites tenderers to a competition for a framework agreement for consulting engineering services. The agreement shall ensure flexible and predictable access to the necessary competence for planning, engineering design services and follow-up of building and construction projects. The framework agreement includes the entire project course - from early needs clarification and concept phase, via the preliminary project and detailed project, to the construction phase, commissioning, taking over and claims follow-up. The assignments will vary in nature, length and complexity, from smaller individual assignments to large projects and can be carried out parallel to several locations. The contract shall be able to cover simultaneous assignments for several business areas and locations in the region, and shall, thus, also handle capacity variations over time.Framework agreement for engineering design services HVAC
OFA IKSKristiansandFramework agreement for engineering design services (preliminary and detailed design, consultancy, technical plans) within roads, water and sewage (HVAC). Includes related services like construction work or replacement of pump stations.Framework agreement for joinery works - second publication
Sola kommuneSolaFrist: 22. JuniThe framework agreement mainly includes repairs and replacements on the Contracting Authority's buildings and sites, as well as planning and minor engineering design work connected to the assignments.Framework agreement for procurement assistance
STATENS PENSJONSKASSE FORVALTNINGSBEDRIFTOSLOFrist: 07. Aug.The aim of the procurement is to enter into a framework agreement with one - 1 - tenderer who has the procurement capacity and competence that is relevant for SPK's procurement profile. The contract shall primarily ensure SPK effective access to assistance with the execution of procurements. In addition the contract shall ensure SPK access to legal assistance within public procurements as needed. In periods there can be more general procurement assistance connected to related services. For example, in periods with a need for specific procurement related competence. The contract includes the following service areas: Operative procurement assistance, Legal assistance, other procurement related services, Total financial scope for the entire framework agreement period of four years, is estimated to be between NOK 3 million and NOK 6 million. Excluding VAT. The framework agreement ́s upper framework is NOK 6 million. Excluding VAT. See the requirement specifications, see the tender documentation part B Annex 1 for further information on the contract's extent and content.F106 Framework agreement for rental services.
SkyssBergenVestland County is the contracting authority for the procurement. A framework agreement shall be signed with one tenderer who shall assist with renting houses and other properties acquired in connection with future development of roads and/or tracks in Vestland county. The agreement includes complete rental broker services, including all necessary activities connected to the establishment, management and termination of the lease. Duration: 3 years, with an option for an extension for 3+2 years. Upper frame: NOK 20 million.Framework agreement for project support EU finances
NTNUTrondheimFrist: 14. Aug.Participation in the EU's framework programme for research and innovation is a high priority activity at NTNU. This applies to both the current framework programme - Horizon Europe and the next framework programme, which shall start in 2028. Participation will take place in the form of projects that receive financial support from the EU. The projects must follow the terms given in the EU guidelines for the different project types. This includes financial guidelines. At the same time, we must ensure compliance with the guidelines that generally apply for NTNU. The financial monitoring of the projects involves responsibility for following up the finances in the project life cycle, from application to completed project. NTNU has its own routines and templates for financial reporting to the EU and internal status reports. For applications and projects that have several partners and coordinated by NTNU, follow-up also involves follow-up of partners' budgeting and reporting. Clear and understandable communication towards internal and external target groups is significant in all project phases. NTNU has its own personnel (project economists) who carry out these assignments, but NTNU will need to supplement with external resources. The need can vary over time. The offered resources must be able to handle a portfolio of applications and projects. The portfolio will usually belong to one or several organisational entities at NTNU. Other more limited assignments may also be relevant. See Annex 1, the contracting authority ́s requirement specifications, for further information on which services/work assignments the framework agreement covers. A framework agreement shall be signed with one tenderer. The contract will start as soon as possible after the award of contract. The contract will be valid for 2 years, with an option for an extension for 1+1 year, for a total of up to 4 years.Framework agreement for locksmith services.
Oslo Kommune v/ Økonomi- Og ForvaltningsetatenOsloFrist: 01. JuliOslo municipality, c/o the Agency for Finance and Management, Procurement and Sustainability Department (henceforth referred to as the Contracting Authority), invites tenderers to an open tender contest for framework agreements for locksmith services.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 11. Juni 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Oslo kommune v/ Vann- og avløpsetaten.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.