Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornTED
Development of a green corridor project and street design training in Dakar
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct addit...
Berufliche Qualifizierung, Stadtplanung, Tiefbauplanung, Umweltgutachten, Verkehrsplanung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Veröffentlicht:
- 05. August 2026
- Frist:
- 28. August 2026
- Thema:
- Berufliche Qualifizierung
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten49 Angaben erfasstUnterlagen
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Development of a green corridor project and street design training in Dakar
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 21. Aug.Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.Development of a green corridor project and street design training in Dakar
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 21. Aug.Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.Development of a green corridor project and street design training in Dakar
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 21. Aug.Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.Development of a green corridor project and street design training in Dakar
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 28. Aug.Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shadingDevelopment of a green corridor project and street design training in Dakar
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 21. Aug.Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, gDevelopment of a digital platform (mobile application, web portal and creative solutions) for Corridor E75
Ministry of Culture and tourism of the Republic of N MacedoniaSkopjeFrist: 31. JuliThe subject of this lot is the provision of services for the development of an integrated digital tourism platform for Corridor E75, including a web portal, mobile applications (Android and iOS) and creative and promotional solutions. The platform will enable presentation of tourism-related content, including accommodation, attractions, gastronomy, events and travel information, with multilingual support (Macedonian, English and Serbian). The services include analysis, design, development, testing, implementation, promotion, user training and system maintenance, in accordance with the technical specifications. The contract will be performed in coordination with the contracting authority and includes delivery of a fully functional and operational system. The duration of the contract is 36 months.Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 07. Aug.Art der Leistung 10037842-Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva Umfang der Leistung The contractor is tasked with delivering three key work packages, each with specific objectives and timelines: 1. Inception Report: The first deliverable will be an inception report that outlines the methodology and planning for the surveys. This report is aimed at establishing a clear framework for survey approaches, data collection, analysis as well as Midline and Endline report structure. Work on this report is set to commence in August 2026, ensuring adequate preparation and planning for the subsequent phases of the project. Regarding the qualitative data collection approach, the contracts should specify a qualitative method applicable to the indicators. The proposed methods may include Key Informant Interviews (KIIs), Focus Group Discussions (FGDs), and direct observation during site visits - are deployed in sequence across the three phases of data collection. Data is analysed thematically and triangulated with quantitative findings before results are finalised Moreover, the contractor will establish a comprehensive, verified, and evidence-based data collection that accurately measures employment, local value addition, export market performance, sustainability certification, MSME processing capacity and IAF service improvement across all targeted indicators. 2. Midline Assessment Report: The second deliverable will be a comprehensive mid-term assessment report, which will evaluate the progress and indicators achievement of the project to date. This report is expected to be finalized and submitted in the fourth quarter of 2026. It will include detailed findings, insights, and recommendations that will guide any necessary adjustments to the project's approach. 3. Endline Assessment Report: The final work package involves delivering a project end-term assessment report, expected in the fourth quarter of 2028. This report will conduct an in-depth analysis of the indicators" achievement, impact and effectiveness of the EU-German CAPSAFE intervention throughout the entire execution period. It will synthesize data collected over the course of the project and provide a thorough evaluation of the results achieved, to some extent offering valuable insights for future initiatives.Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 07. Aug.Art der Leistung 10037842-Study to Assess Impact and Effectiveness of Implementation of the Project EU-German Cambodia Partnership for Sustainable Agriculture and Food Systems (CAPSAFE) During Mid-term and Endline Eva Umfang der Leistung The contractor is tasked with delivering three key work packages, each with specific objectives and timelines: 1. Inception Report: The first deliverable will be an inception report that outlines the methodology and planning for the surveys. This report is aimed at establishing a clear framework for survey approaches, data collection, analysis as well as Midline and Endline report structure. Work on this report is set to commence in August 2026, ensuring adequate preparation and planning for the subsequent phases of the project. Regarding the qualitative data collection approach, the contracts should specify a qualitative method applicable to the indicators. The proposed methods may include Key Informant Interviews (KIIs), Focus Group Discussions (FGDs), and direct observation during site visits - are deployed in sequence across the three phases of data collection. Data is analysed thematically and triangulated with quantitative findings before results are finalised Moreover, the contractor will establish a comprehensive, verified, and evidence-based data collection that accurately measures employment, local value addition, export market performance, sustainability certification, MSME processing capacity and IAF service improvement across all targeted indicators. 2. Midline Assessment Report: The second deliverable will be a comprehensive mid-term assessment report, which will evaluate the progress and indicators achievement of the project to date. This report is expected to be finalized and submitted in the fourth quarter of 2026. It will include detailed findings, insights, and recommendations that will guide any necessary adjustments to the project's approach. 3. Endline Assessment Report: The final work package involves delivering a project end-term assessment report, expected in the fourth quarter of 2028. This report will conduct an in-depth analysis of the indicators" achievement, impact and effectiveness of the EU-German CAPSAFE intervention throughout the entire execution period. It will synthesize data collected over the course of the project and provide a thorough evaluation of the results achieved, to some extent offering valuable insights for future initiatives.Facilitation and Development of Connexus Project for Leitrim County Council
Leitrim County Council_2136LeitrimThe Programme Delivery Contractor will deliver a coordinated programme of community-based activities across six (6) Leitrim Connected Hubs, ensuring alignment with the objectives, outputs, governance and compliance requirements of the SEUPB‑approved Connexus Programme. Working closely with Leitrim County Council, local hub committees, and partner hubs in Mid and East Antrim Borough Council (MEABC) and Sligo County Council (SCC), the Contractor will support effective planning, delivery and monitoring of programme activities. The role includes programme planning and coordination through the development of annual activity plans, participation in cross‑border planning workshops, and the preparation of hub‑specific action plans responding to local needs and capacity, including advice on ICT requirements and compliant procurement. The Contractor will design and deliver a diverse programme of hub‑based activities focused on digital inclusion, health and wellbeing, social connection, enterprise development, remote working and community governance support. Activities will target older people, marginalised groups and those with low digital confidence, while promoting intergenerational and cross‑community engagement in line with PEACEPLUS values. The Contractor will support cross‑border engagement through study visits, conferences and mentoring initiatives, capture learning outcomes for reporting, and promote hub activities through agreed communications channels. Regular coordination meetings, accurate monitoring, quarterly reporting, full compliance with SEUPB and Council requirements, and a final evaluation report will form core deliverablesAppui à l'adaptation de la chaîne d'approvisionnement de cacao en Côte d'Ivoire aux défis de durabilité
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 18. Aug.Under this assignment, the contractor will deliver technical assistance to the PRO-PLANTEURS project to adapt Côte d'Ivoire's cocoa supply chain to economic, regulatory, environmental and social sustainability challenges, assuming responsibility for defined outputs, indicators and milestones. The contractor will establish and manage an expert team, ensure quality assurance and backstopping, administer finances and reporting, contribute inputs for BMZ/MINADER reports as required, and comply with data protection obligations when processing personal data. Under Output 1, the contractor will enable cocoa producers to implement good agricultural practices (GAP) and agroforestry in line with ARS 1000. This includes designing ten agroforestry models for cocoa based on nationally compatible species lists and research, complemented by socio economic and financial analyses; sensitizing 6,000 producers (at least 30% women) on agroforestry; and advising farms to reach at least 5,000 ARS 1000 compliant agroforestry plots. The contractor will train 6,000 producers (?30% women) through Farmer Field Schools on GAP aligned with ARS 1000 and support implementation of individual Cocoa Farm Development Plans (PDCs). In cooperation with cooperatives, the contractor will assist internal inspections and corrective actions to bring 6,000 farms into ARS 1000 compliance. Milestones include submission of ten model packages with analyses within nine months, agroforestry sensitization within 12 months, completion of producer trainings by month nine, PDC support by month 12, and internal inspection support by month 15. The contractor contributes to targets such as 5,000 farms maintaining trees per ARS 1000 and at least 500 women managed farms applying GAP. Under Output 2, the contractor will strengthen cooperative service provision for sustainable, economically viable production. It will test, together with CNRA, harmonized Côte d'Ivoire-Ghana protocols for early detection, monitoring and prevention of cocoa swollen shoot virus via demonstration plots, train staff from 12 cooperatives, CCC delegations and ANADER on these protocols, and support member sensitization. The contractor will establish and professionalize cooperative service units by training teams in agricultural operations (e.g. pruning, weeding), phytosanitary and fertilizer application, tree planting for agroforestry, and eradication of infected trees; and train and coach managers in financial management and governance. It will support digitalization of cooperative operations and accompany internal audits and corrective actions towards ARS 1000 certification in 12 cooperatives. Milestones include completion of protocol testing within nine months, completed trainings by month 12 and continuous sensitization; service team training by month six, business models by month nine, management training by month 12 and coaching by month 15. The contractor contributes to each cooperative implementing two swollen shoot measures and four priority ARS 1000/EUDR measures. Under Output 3, the contractor will reinforce sustainable procurement between cooperatives and buyers by training 12 cooperatives on legal aspects of buyer contracts linked to new sustainable models and providing advisory and coaching for implementation. Support will cover fair remuneration, timely payments, longer contract terms, and incentives for environmental services and agroforestry, including facilitation to prevent or resolve disputes. Milestones include completing training within six months and providing ongoing advisory through contract end. The contractor contributes to four sustainable procurement models being implemented and evaluated by March 2027. Under Output 4, the contractor will strengthen evidence based dialogue among supply chain actors by establishing an independent, project agnostic PRO PLANTEURS digital platform anchored in a selected partner institution. It will provide organizational support for platform management, train dedicated staff, and help develop a strategic plan (including visual identity and communication plan) and a 2028-2030 action plan. Organizational support is due within 12 months, with strategic support continuing to contract end; one independent platform is to be operational by February 2028. Across all outputs, the contractor must mainstream gender equality (ensuring women's participation and targeted support to women managed farms), environment and climate action (deforestation free cocoa, agroforestry expansion, climate smart practices, biodiversity monitoring, water saving technologies, livelihood diversification), conflict/context sensitivity and human rights ("do no harm", grievance mechanisms, inclusive participation). Knowledge management and scaling will be ensured through systematic documentation, contributions to technical exchanges and GIZ networks, and dissemination via the digital platform and dialogue events. Implementation will adhere to predefined expert deployment, travel with CO2 minimising choices and compensation, fixed budgets for materials and workshops, and use of provided offices and logistics, with full cost control and compliance with GIZ rules.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 28. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.