County road 5591 Rørdalsfjord bridge - Turnkey contract
Turnkey contract for engineering design and construction of a new bridge over Rørdalsfjorden at Ytre Sula, Solund municipality, and improvements to county road 5591 Nåravegen on both sides of the fjord.
Straßenbau, Ingenieurbauwerke
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Vestland fylkeskommune
- Veröffentlicht:
- 25. Mai 2026
- Frist:
- Nicht angegeben
- Thema:
- Straßenbau
- Bauobjekt:
- Straßenbrücke
Bauobjekt-Klassifikation
- StraßenbrückeHauptobjekt
Ausschreibungsbeschreibung
Turnkey contract for engineering design and construction of a new bridge over Rørdalsfjorden at Ytre Sula, Solund municipality, and improvements to county road 5591 Nåravegen on both sides of the fjord.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
5 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten49 Angaben erfasstUnterlagen
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten1 Angabe erfasstAusführungsorte
Ähnliche Bekanntmachungen
10National road 70 Fale bridge
Statens vegvesenMossFrist: 22. JuniThe contract work includes a new bridge on national road 70 at Fale, over the river Driva in Sunndal municipality. The site is located approx. 16 km southeast of the centre of Sunndal. The existing bridge does not fulfil the requirements for user class BK10/60. The new bridge will particularly improve accessibility for the heavy vehicle industry, and provide better traffic safety at junctions to local roads. In addition to the new bridge, the contract work includes improvements to junctions to Vermøyvegen, as well as affected private exits. The extent of the new bridge with the accompanying remodelled road is approx. 800 m.Donegal County Council - Replacement of Finnabanes Bridge (Contract 5.0, 2026)
Donegal County Council_1193LiffordFrist: 10. JuliReplacement of Finnabanes Bridge, a single span masonry arch bridge, with precast concrete culverts. Includes reinstatement of verges, bituminous road reinstatement, and all associated site works.Longford County Council Bridge Remediation Works 2026 Contract 2
Longford County CouncilLongfordFrist: 01. JuliLongford County Council is seeking quotations for the construction and rehabilitation of 3 bridges in the county. These bridges comprise of the installation of 3 new box culverts on local roads around the county.The nature of the works includes but is not limited to the following: installation of new precast box culverts, allowing fencing to tie into masonry parapets, replacement of soft verges with concrete rubbing strips, removal of vegetation and removal of debris from the riverbed. There are two bridges in north to mid Longford and one bridge south of the county. The bridge identification are as follows: • Tipper Bridge (Masonry Stone Arch Bridge) • Kilshruley Bridge (Composite Bridge) • Lissameen Lane Bridge (Concrete Slab Bridge)County road 356 Raschebakken - Skippergata
Telemark fylkeskommuneSkienFrist: 18. MaiEstablishment of a new crossing system and upgrading of water/sewage installations in Raschebakken and Skippergata on county road 356, Porsgrunn. Includes road construction, foot/cycle path, green areas, stone setting, electro, noise reduction, and associated works.County road 1533 Strømsveien, Sagdalen - Nitelva bridge
Akershus fylkeskommuneOsloFrist: 08. MaiConstruction of a 800 m cycle path with a pavement, establishing two new bridges for the cycle path with a pavement. Alterations to an existing roundabout. Alteration of cables and pipelines. Demolition of buildings. Various constructions.Amendment order on county road 3804 Ose bridge - intention notice
Agder fylkeskommuneKristiansandAgder county changes the bridge solution for county road 3804 Ose bridge from 3 spans to 2 spans reinforced concrete bridge due to further engineering design. The change allows work in the river to be done in one operation, reduces river bottom intervention, improves environmental and SHA conditions, and reduces ice load by removing one pillar group. Function, capacity, dimensions, and materials remain unchanged. The amendment is implemented via contract alteration clause.Upgrading and maintenance of the road and bridge management system (RAMS and BMS)
Public Entreprise for State Roads - SkopjeSkopjeFrist: 08. JuliUpgrading and maintenance of the road and bridge management system (RAMS and BMS)Bridge maintenance contracts - Østfold county - framework agreements
Anskaffelser i Akershus, Buskerud og Østfold KODrammenDie Østfold-Region möchte 4 parallele Rahmenvereinbarungen für die Wartung von Brücken und Strukturen (Verträge) für das County-Road-Netz abschließen.Straßenbauarbeiten, County Road 60, Blindheim-Flisnes
Møre og Romsdal FylkeskommuneMOLDEFrist: 18. JuniThe project involves completing ongoing construction work on county road 60 between Blindheim and Flisnes after the former contractor went bankrupt. The aim is to finish planned traffic safety measures and ensure completion per approved plans. County road 60 is a main thoroughfare with annual daily traffic of approx. 11,000 vehicles and expected to increase due to residential development.Detailed Structural Investigation Works Contract for Wexford Bridge, Kildavin Bridge and Edermine Bridge, County Wexford
Wexford County CouncilWexfordFrist: 29. JuniProvision of non-destructive testing, invasive investigations and laboratory analysis for Wexford, Kildavin and Edermine Bridges to determine structural condition and inform remediation. Includes traffic management, access (boat, scaffolding, underbridge), licences, reinstatement, and reporting. Specific works per bridge: Wexford - concrete cores, covermeter, chloride/carbonation/half-cell/resistivity testing, ultrasonic thickness of steel girders, paint system inspection, dive inspection, bathymetric survey. Edermine - similar concrete tests, ultrasonic thickness of steel piles, pile integrity testing, dive inspection, bathymetric survey. Kildavin - pilot holes, slit trenches, trial pits, geophysics (GPR, seismic refraction).
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Vestland fylkeskommune.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.