IDA IrelandDublinTED
Call for Quotations for the supply and delivery of fine sand, coarse sand and gravel for use by the Restoration and Preservation Department
Supply and delivery of fine sand (26,700 kg), coarse sand (300 kg), gravel (1,100 kg), and globigerina stone dust (2,300 kg) in sacks of 15-20 kg each, for the Restoration and Preservation Department over 24 months.
Schüttgüter
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- IDA Ireland
- Veröffentlicht:
- 17. Mai 2026
- Frist:
- Nicht angegeben
- Thema:
- Schüttgüter
Ausschreibungsbeschreibung
Supply and delivery of fine sand (26,700 kg), coarse sand (300 kg), gravel (1,100 kg), and globigerina stone dust (2,300 kg) in sacks of 15-20 kg each, for the Restoration and Preservation Department over 24 months.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9IMT003/2025 - TENDER FOR THE CONSOLIDATION AND STABILISATION OF THE BIGHI FORESHORE AND OVERLYING HISTORICAL WALLS AND RESTORATION OF THE SAME HISTORICAL WALLS
Infrastructure MaltaLuqaFrist: 29. JuliIMT003/2025 - TENDER FOR THE CONSOLIDATION AND STABILISATION OF THE BIGHI FORESHORE AND OVERLYING HISTORICAL WALLS AND RESTORATION OF THE SAME HISTORICAL WALLSLicences and Software Subscription for use with Cisco Unified Communication product set currently deployed at the Department of Agriculture, Food and the Marine
Department of Agriculture Food and the MarineDublinFrist: 12. JuniLicences and software subscriptions for Cisco Unified Communication product set currently deployed at the Department of Agriculture, Food and the Marine.Call for Quotations for the Services of a Health and Safety Project Supervisor (PS) in terms of L.N. 88/2018 for the restoration of Valletta Palazzo (Structural works stage)
National Book CouncilPembrokeHealth and Safety Project Supervisor (PS) services under L.N. 88/2018 for the restoration of Valletta Palazzo (structural works stage).Supply and installation of sports and urban equipment for the renovation of neighborhood multi-purpose playgrounds
Ministry of sportsSkopjeFrist: 29. JuniSupply and installation of sports and urban equipment for the renovation of neighborhood multi-purpose playgrounds 1.Construction/application of acrylic resin as a base layer in 1 coat with a minimum thickness of 1 mm for a sports field. m2 1 2.Supply, transport, and installation of artificial football turf. Pile height: 50 mm. m2 1 3.Supply, transport, and installation of artificial football turf. Pile height: 40 mm. m2 1 4.Supply, transport, and installation of artificial football turf. Pile height: 30 mm. m2 1 5.Supply, transport, and installation of artificial football turf. Pile height: 20 mm. m2 1 6.Supply, transport, and installation of expansion strips for polypropylene modular flooring with a thickness from 8 mm to 22 mm and width from 30 mm to 90 mm for sports fields, UV-stabilized and wear-resistant, in a color selected by the investor. m 1 7.Supply, transport, and installation of polypropylene modular flooring with a thickness from 8 mm to 22 mm for sports fields, UV-stabilized and wear-resistant, in a color selected by the investor. m2 1 8.Supply, transport, and installation of purpose-made cast rubber with machine application of a mixture of SBR granules and polyurethane, with a thickness of 5 mm. The installed materials must be safe for human health and the environment. m2 1 9.Supply, transport, and filling/application of SBR rubber granules. m3 1 10.Supply and installation/application of quartz sand with granulation from 0.4 mm to 0.8 mm. m3 1 11.Supply and bonding using special two-component polyurethane adhesive for concrete or asphalt. Consumption: 1 kg/m². m2 1 12.Supply and bonding using special two-component polyurethane adhesive for concrete or asphalt. Consumption: 0.2 kg/m¹. m 1 13.Supply and installation of sand/gravel without mud and dust for children’s playgrounds, gray-white in color. m3 1 14.Supply, transport, and installation of purpose-made cast rubber flooring with a mixture of EPDM rubber granules and polyurethane in a layer from 1 mm to 3 mm, in a color selected by the investor. m2 1 15.Smoothing of concrete slab/screed using a power trowel (“helicopter”). m2 1 16.Milling/scraping of damaged asphalt or concrete up to 3 mm using a machine. m2 1 17.Construction/execution of screed with thickness d = 10 cm. m2 1 18.Construction/execution of screed with thickness d = 5 cm m2 1 19.Concreting of floor slab with thickness d = 10 cm using MB20 concrete, including formwork installation. m2 1 20.Supply and installation of ribbed and smooth reinforcement bars up to Ø12 mm. kg 1 21.Rolling/compaction of the base layer. m2 1 22.Base course installation in a 10 cm layer using crushed stone 0–40 mm with required compaction. m2 1 23.Marking/lining of a (standard) 80 m tennis court on concrete and acrylic surface (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 24.Marking/lining of a (standard) 80 m volleyball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 25.Marking/lining of a (standard) 100 m handball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 26.Marking/lining of a (standard) 120 m football field (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 27.Marking/lining of a (standard) 120 m basketball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 28.Painting of sports equipment in a shade/color selected by the investor. m2 1 29.Concreting of footing bases with MB20 concrete for sports equipment. m3 1 30.Manual excavation of soil for concreting footing bases for sports courts/playgrounds. m3 1 31.Supply and installation of steel elements for sports courts/playgrounds and other purposes. kg 1 32.Supply and installation of processed planed white pine boards with minimum thickness d = 15 mm for sports equipment and other elements. m2 1 33.Supply and installation of processed planed pine boards with minimum thickness d = 15 mm for sports equipment and other elements. m2 1 34.Supply and installation of standard tennis net with mesh opening max. 4 × 4 cm and rope thickness min. 2''. piece 1 35.Supply and installation of standard volleyball net with mesh opening max. 20 × 20 cm and rope thickness min. 2''. piece 1 36.Supply and installation of rubber shock absorbers between the metal frame and the glass basketball backboard. kg 1 37.Supply and installation of standard basketball hoop net (mesh) with 12 loops/openings. piece 1 38.Supply and installation of hinged basketball rim for basketball structure with spring mechanism, 4 bolts, and minimum diameter of 45 cm. piece 1 39.Supply and installation of standard steel rims for basketball structure complete with 4 bolts and minimum diameter of 45 cm. piece 1 40.Supply and installation of new standard basketball backboards made of polycarbonate, minimum thickness d = 8 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 41.Supply and installation of new standard basketball backboards made of plexiglass, minimum thickness d = 8 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 42.Supply and installation of new standard basketball backboards made of perforated sheet metal, minimum thickness d = 3 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 43.Supply and installation of new standard basketball backboards made of tempered glass, minimum thickness d = 8 mm, with dimensions 1.8 m × 1.05 m. piece 1 44.Supply and installation of new standard basketball backboards made of polyester, with minimum dimensions 1.8 m × 1.05 m and minimum thickness d = 3 mm. piece 1 45.Supply and installation of protective net behind goals with mesh openings max. 20 × 20 cm and rope thickness min. 2'', edged with tensioning rope. m2 1Quotation for the Supply and Delivery of a Respirometric measuring system for Biochemical Oxygen Demand (BOD), soil respiration, biogas determination, and biodegradation tests for the University of Malta in Relation to the Project RECLAIM (REstoration and Conservation through the Limitation of Alien and Invasive Menace) - CUP: G13C25000260006
UNIVERSITY OF MALTAMSIDAFrist: 24. JuniFür das RECLAIM-Projekt (Restoration and Conservation through the Limitation of Alien and Invasive Menace) wird ein respirometrisches Messsystem benötigt zur quantitativen Bewertung der mikrobiellen Aktivität und des organischen Abbaus in Böden und Sedimenten, die von invasiven Arten betroffen sind. Das System misst den biochemischen Sauerstoffbedarf (BOD), Bodenatmung, Biogasproduktion und Biodegradationsraten als Indikatoren für Ökosystemfunktion und Wiederherstellungserfolg. Daten dienen dem Vergleich von beeinträchtigten und wiederhergestellten Standorten.Call for Quotations for the supply of red and blue garbage bags for the Malta Tourism Authority
Cork Education and Training BoardCorkAngebotsaufforderung zur Lieferung von 12.500 blauen und 10.000 roten LDPE-Polyethylen-Müllsäcken für die Malta Tourism Authority, die an allen von der MTA verwalteten Stränden verteilt werden, um wirksame Abfalltrennung zu fördern.Call for Quotations for the supply of black and transparent garbage bags for the Malta Tourism Authority
Cork Education and Training BoardCorkDie Malta Tourism Authority beauftragt einen Lieferanten mit der Lieferung von 13.000 schwarzen und 7.000 transparenten LDPE-Polyethylen-Müllbeuteln.Quotation for the Supply and Delivery of a Centrifuge for the University of Malta in Relation to the Project RECLAIM (REstoration and Conservation through the Limitation of Alien and Invasive Menace) - CUP: G13C25000260006
UNIVERSITY OF MALTAMSIDAFrist: 24. JuniBeschaffung einer Tischzentrifuge für die Universität Malta im Rahmen des Projekts RECLAIM. Die Zentrifuge dient der Trennung und Verarbeitung von Umwelt- und biologischen Proben (Wasser, Sediment, biologisches Material) aus Felduntersuchungen. Sie unterstützt Laborarbeiten wie Probenvorbereitung, Isolierung von Mikroorganismen und die Vorbereitung für molekulare und physikalisch-chemische Analysen zur Bewertung der Biodiversität und Süßwasserökosysteme.The Supply, Delivery, Installation and Commissioning of classroom furniture for use in schools and centres for Donegal Education and Training Board
Donegal Education and Training Board_368LetterkennyThe Supply, Delivery, Installation and Commissioning of classroom furniture for use in schools and centres for Donegal Education and Training Board
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist IDA Ireland.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.