Inland Fisheries IrelandDublinTED
Cahernahallia Bridge and Blackboy Weir Barrier Mitigation Project
Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of two Barrier Mitigation Projects: Cahernahallia Bridge and Blackboy Weir in Co. Limerick and Co. Tipperary, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environm...
Stadtplanung, Tiefbauplanung, Umweltgutachten, Wasserwirtschaft
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Inland Fisheries Ireland
- Veröffentlicht:
- 31. August 2026
- Frist:
- 28. September 2026
- Thema:
- Stadtplanung
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of two Barrier Mitigation Projects: Cahernahallia Bridge and Blackboy Weir in Co. Limerick and Co. Tipperary, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environmental and planning services required to progress the project through feasibility, option selection, and statutory consent stages in accordance with the Planning and Development Acts 2000–2023, the Capital Works Management Framework, and Infrastructure Guidelines 2023. The Barrier Mitigation Projects aim to mitigate the impacts of the identified barriers on fish passage and restore more natural river processes along the associated rivers. The commission forms a specific action under Ireland’s Water Action Plan 2024 and supports implementation of the National Barrier Mitigation Programme to deliver improved ecological status under the EU Water Framework Directive. The Consultant will act as the Designer, Project Supervisor Design Process during all Phases of the project and carry out all related necessary duties.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Doneraile Weirs Barrier Mitigation Project
Inland Fisheries IrelandDublinFrist: 24. Sept.Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of a Barrier Mitigation Project, Doneraile Weirs on the Awbeg River in Doneraile, Co. Cork, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environmental and planning services required to progress the project through feasibility, option selection, and statutory consent stages in accordance with the Planning and Development Acts 2000–2023, the Capital Works Management Framework, and Infrastructure Guidelines 2023. The Barrier Mitigation Project aims to mitigate the impacts of the identified barriers on fish passage and restore more natural river processes along the associated rivers. The commission forms a specific action under Ireland’s Water Action Plan 2024 and supports implementation of the National Barrier Mitigation Programme to deliver improved ecological status under the EU Water Framework Directive. The Consultant will act as the Designer, Project Supervisor Design Process during all Phases of the project and carry out all related necessary duties.National Barrier Mitigation Programme - Topographical and Bathymetric Surveys
Inland Fisheries IrelandDublinFrist: 21. Sept.Topographical and Bathymetric Surveys for varying Barrier Mitigation projects countrywide - divided into 11 LotsGreenway Feasibility: 2026 Shannon Harbour to Banagher, Co Offaly
Offaly County Council_448TullamoreFrist: 15. Sept.Offaly County Council seek to procure and appoint Technical Engineering Consultancy Services (Consultant Engineer) to assess the feasibility and viability of extending the Greenway from Shannon Harbour to Banagher Town to enable the terminus of the greenway in an urban setting and to provide further connectivity to the Grand Canal Greenway and wider National Cycle Network.Avinor AS - K-193318 - Parallel framework agreements, consultancy agreements for technical disciplines - Building and construction (RIX/ARK)
AVINOR ASOsloFrist: 14. Sept.The aim of the procurement is to enter into parallel framework agreements with three different suppliers during the contract period for consulting engineers (RIX), and two different suppliers for architects (ARK). The framework agreement shall contribute to: • Efficient and correct engineering design that provides clear and good tender documentation for contractors, reduces risk and ensures cost efficient solutions. • Sustainable and innovative solutions supporting Avinor's goal of reduced greenhouse gas emissions, energy efficiency and circular economy. • Continual improvement and learning through systematic follow-up of deliveries and implementation of experiences from previous projects. The framework agreement regulates the overall obligations between the parties, whilst individual deliveries are agreed and regulated through call-off contracts.Rahan Flood Relief Scheme — Engineering and Environmental Consultancy Services
Offaly County Council_448TullamoreFrist: 18. Sept.Offaly County Council invites tenders for engineering and environmental consultancy services for the Rahan Flood Relief Scheme at Tullybeg, Rahan, County Offaly, on the River Clodiagh. The Scheme comprises approximately 430 metres of reinforced concrete flood defence wall along the right bank of the River Clodiagh, with embankment at the tie-in points, protecting residential properties and the wastewater treatment plant to the 1 percent AEP fluvial standard. The commission covers Stage (ii) statutory consent and detailed design, Stage (iv) construction-stage services and Stage (v) handover and defects period, under the Capital Works Management Framework. The construction works will be delivered by Office of Public Works direct labour; procurement of a works contractor is not included in this commission. The services include detailed design, hydrological and hydraulic modelling, ground investigation specification and interpretation, review and validation of the completed EIA and Appropriate Assessment screening, statutory consent documentation for approval under Part 8, works package preparation for direct labour delivery, Project Supervisor Design Process duties, construction-stage technical support and design authority, and handover documentation. The Scheme is funded by the Office of Public Works.Framework agreement for consultancy services
Kvæfjord KommuneBorkenesFrist: 26. Aug.Harstad municipality, Kvæfjord municipality, Lødingen municipality, Tjeldsund municipality and Ibestad municipality would like to enter into parallel framework agreements with tenderers for the provision of technical consultancy services for architects and consulting engineers for the following disciplines: Sub-contract 1 Construction engineering services: Construction, Electro, HVAC and sanitation. Sub-contract 2 Fire engineering services Sub-contract 3 Project management/builder ombudsman/construction management/ (ITB Coordinator). Sub-contract 4 Building and process automation. Sub-contract 5 Architect/technical drawings Sub-contract 6 Zoning plan We would like to enter into parallel agreements within each discipline in order to have greater security for availability. Up to three framework agreements will be awarded for each sub-contract. Tenders can be submitted for one or more sub-contracts. Ranking: Where there are parallel framework agreements, the award of call-offs shall occur in accordance with the ranking that follows the evaluation of the award criteria. The contract partner ranked as no. 1 will be the one who in each case will have the opportunity to take on the assignment. The projects that this procurement will apply to are projects for municipal buildings, sites and properties in the municipalities included in this procurement. Contract value The estimated annual consumption is NOK 7,600,000 for the contracting authority municipalities. This is only an estimate and is not binding for the municipalities. The estimated distribution within each trade per annum: Construction engineering services: Construction, Electro, HVAC - NOK 1,000,000 1.Fire engineering services - NOK 800,000 2.Project management/builder ombudsman - NOK 1,000,000 3.Building and process automation - 800,000,- 4.Architect/technical drawings - NOK 1,000,000 5.Zoning plan - NOK 3,000,000 The procurement ́s relationship to already signed agreements. Harstad municipality has entered intoB 107 Garz - Klenzenhof: Zustandserfassung mittels Bohrkernentnahme am Fahrbahnoberbau, Baugrunderkundung sowie chemische Analyse von Ausbaustoffen in Vorbereitung einer Deckenerneuerung
Landesbetrieb Straßenwesen BrandenburgHoppegartenFrist: 24. Sept.Im Namen des Land Brandenburg, vertreten durch das Ministerium für Infrastruktur und Landesplanung, vertreten durch den Landesbetrieb Straßenwesen Brandenburg (Dienststätte Potsdam) ist beabsichtigt zum Projekt "B 107 Garz - Klenzenhof" die Leistung "Zustandserfassung mittels Bohrkernentnahme am Fahrbahnoberbau, Baugrunderkundung sowie chemische Analyse von Ausbaustoffen in Vorbereitung einer Deckenerneuerung" zu vergeben. Die Leistung umfasst: Entnahme von Bohrkernen aus dem Fahrbahnoberbau, Durchführung von Kleinramm- bohrungen sowie Durchführung von physikalischen und chemischen Laborversuchen als Planungsgrundlage für eine Deckenerneuerung innerhalb des o.g. Straßenabschnittes. Erstellung eines Ergebnisberichtes. Für die Durchführung der Feldarbeiten werden Verkehrs- sicherungsmaßnahmen erforderlich.Zimmerberg Basistunnel 2 (ZBT2) - Sachverständige Tunnelsicherheit (SV TuSi)
Schweizerische Bundesbahnen SBB, Infrastruktur – Einkauf, Supply Chain und Produktion, Einkauf Bauprojekte Region OstZürichFrist: 09. Sept.Die SBB hat für den Neubau des «Zimmerberg-Basistunnel 2» (ZBT2) ein Generalplanermandat für die SIA-Teilphasen 32-53 vergeben. Der Tunnel ist ca.10,8 km lang und besteht aus jeweils zwei Einspurröhren. Diese schliessen an den Zimmerberg-Basistunnel 1 an und erstrecken sich bis zum Südportal Litti bei Baar. Die Leistungen für das Sachverständigenmandat Tunnelsicherheit erfolgt gemäss der BAV Richtlinie Unabhängige Prüfstellen Eisenbahnen RL UP EB Version 3.1 vom 24. September 2021. Das Mandat umfasst hauptsächlich die Qualitätssicherung im Bereich Brandschutz gemäss den VKF Brandschutzvorschriften. den Technischen Spezifikationen für die Interoperabilität / Sicherheit in Eisenbahntunneln (TSI SRT) sowie die Erstellung eines Prüfberichts gemäss Vorgabe BAV Richtlinie unabhängige Prüfstellen Eisenbahn (RL UP-EB). Die Leistungen werden in den SIA-Teilphasen 32/33 (Bauprojekt/Auflageprojekt) sowie in den weiterführenden Prüfungen und der fachlichen Unterstützung der SBB während der SIA Teilphasen 51/52 (Ausführungsprojekt/Ausführung) erbracht. Folgende Bauwerke des Projekts «Zimmerberg-Basistunnel 2» sind Bestandteil des Sachverständigenmandats Tunnelsicherheit: • Sämtliche Untertage-Bereiche und Flucht- und Rettungsschächte • Bahntechnikgebäude (teils ober-, teils unterirdisch) • Unterhaltsgebäude (klassischer Hochbau)A7 Mühlkreis Autobahn, TU Bindermichl - EH Niedernhart - Verkehrsverbessernde Maßnahmen
Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft vertreten durch die ASFINAG Maut Service GmbHWienAm Knoten Linz werden bereits im Bestand Überlastungserscheinungen, welche zu deutlichen Rückstauungen auf die überregional bedeutende A 1 West Autobahn führen, beobachtet. Zur Erhöhung der Kapazität sowie zur Optimierung des Verkehrsflusses, insbesondere in den Spitzenstunden, und somit zur Sicherstellung einer adäquaten Verkehrsqualität, ist daher die Errichtung einer Pannenstreifenfreigabe (PSFG) im Abschnitt Knoten Linz bis Tunnel Bindermichl nach den Generalsanierungen geplant. Ebenso treten auch im Bereich Tunnel Bindermichl – Knoten Hummelhof – Einhausung Niedernhart regelmäßig Überlastungserscheinungen auf. Zur Erhöhung der Kapazität sowie zur Optimierung des Verkehrsflusses, insbesondere in den Spitzenstunden, und somit zur Sicherstellung einer adäquaten Verkehrsqualität, sind im Zuge dieses Auftrags mögliche Lösungsszenarien zu konzipieren und zu bewerten.SAW859; Landeck-Zams - Flirsch; Generelles Planungsprojekt Mauererneuerung, km 72,306 - 87,274; Planung - Einreichungs- und Ausschreibungsplanung
ÖBB-Infrastruktur AGWienDie Leistung umfasst folgende Teilleistungen: - Begehung inkl. Bestandsaufnahme - Anfertigen von Bestandsplänen - genereller Entwurf - statische Berechnungen nach Erfordernis - Konstruktionspläne - Massenermittlung - Leistungsverzeichnis - Kostenberechnung auf Basis der Massenermittlung
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 28. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Inland Fisheries Ireland.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.