AVINOR ASOsloTED
Avinor AS - T-192786 - Procurement of a contract for defined contribution pension services with associated risk coverage.
The procurement includes the management and administration of a defined contribution scheme with associated risk coverage.
Versicherungen, Krankenversicherung, Altersvorsorge
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- AVINOR AS
- Veröffentlicht:
- 01. Juli 2026
- Frist:
- 18. August 2026
- Thema:
- Versicherungen
Ausschreibungsbeschreibung
The procurement includes the management and administration of a defined contribution scheme with associated risk coverage.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
5Provision of DC Pension Master Trust Services
Dublin Port Company_411DublinFrist: 16. JuliThe Contracting Entity proposes to engage in a competitive process for the establishment of a contract for the provision of Defined Contribution DC Pension Plan services via a Master Trust arrangement. The existing scheme was established in 2005 for all new employees joining the Company from that date. Governance is currently provided through a standalone Trust with independent professional trustees. Administration and investment options are managed by an insurance company. There are currently approximately 110 employees who are members of the Scheme, with combined annual contributions of approximately €2.5 million. The Contracting Entities’ main objectives in moving to a Master Trust are to achieve cost efficiency, improve member engagement and investment solutions. Full description of requirements are in the PQQT.023.2026 - Stage 1 Pre-Qualification Questionnaire for requests to participate in a Competition for the provision of Body Worn Cameras with associated Digital Evidence Management System and Services
An Garda Síochána_1192DublinProvision of Body Worn Cameras with associated Digital Evidence Management System and services for An Garda Síochána. Procurement via competitive procedure with negotiation, minimum two stages.Support for protected areas as a contribution to the preservation of ecosystem services (SPACES II)
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 31. Aug.All services contribute to achieve the project objectives of STREAM+ (Output 4 of SPACES II) and comprise four work packages (WP): WP 1 concentrates on mainstreaming, institutionalisation, capacity building and implementation of/for climate-resilient, sustainable and inclusive forest management (SFM+) at the local and strategic-political level, with the following main activities as i) multi-stakeholder workshops to identify solutions for climate-resilient forest use and to strengthen the role of Forest User Groups in SFM+, ii) elaboration and testing of a vertical structure concept of NFA and iii) technical advice on selected forestry policy instruments and for reporting on forest management planning, implementation and monitoring (FMPIM). Selected main results are improved legislation and policies and FMPIM reports. WP2 provides capacity building of NFA, local forest administration, PFE, FUG in planning, implementation and monitoring of SFM+ with the main activities i) advice territorial plan development working groups at local level, ii) elaborate a climate risk study related to forest management, iii) execute a gap analysis on needs of digital precision technologies, iv) improve fire management structures and approaches, v) update planning and inventory methods, v) support the development of SFM+ plans, vi) capacity building on local level regarding silviculture, improved fire management, remote sensing tools, and vii) analyse and recommend relevant actors on basic forest economic data. Selected main results are 15 elaborated and partly implemented plans for SFM+, 2.105.931 ha of forests under sustainable management and 7 local territorial development plans incorporating SFM+ principles. WP 3.a aims on strengthening sustainable inclusive forest-based value chains (VC) with Forest User Groups (FUG) and Micro-, Small- and Medium Enterprises (MSME). The focus is on timber forest products (TFP) from thinning and dead wood as well as non-timber forest products (NTFP). Main activities are i) multi-stakeholder roundtables on VC, ii) elaborate training material and conduct trainings on VC, iii) conduct studies on market opportunities, limitations, feasibilities, iv) advice national partners on the mentioned topics and v) develop recommendations for related policy instruments. Main results are a certain number of studies, capacity building measures and reinforced forestry-related VC. WP 3.b focuses on strengthening entrepreneurial and networking capacities of FUG and MSME with regard to formal markets, adding value and achieving a positive return on sustainable forest management that improves forest health and climate resilience. If feasible, synergies with national business incubator service providers and TVET shall be fostered. Main activities are i) support to selected FUG to become private entities to implement SFM+ activities, ii) a capacity-building needs assessment and relevant training for incubator service providers, iii) capacity building to FUG and MSME regarding organisational and entrepreneurial capacities, building strategic partnerships, business plans, product development, work safety and traceability systems. Main results are i) 10 FUG with a bankable business plan for forest management, ii) 3 user agreements for legal and sustainable use of TFP and NTFP and iii) 100 (green) jobs supported.Procurement of a lock system with a service contract.
Bardu kommuneBarduBardu municipality would like to enter into a framework agreement with a tenderer for the delivery and installation of electronic lock systems with the accompanying service and maintenance services.Procurement of a service contract for gas installations.
NTNUTrondheimNTNU shall enter into a framework agreement for the inspection and maintenance of gas installations for NTNU ́s buildings in Trondheim. The delivery and place of work for the deliveries will be NTNU in Trondheim. The gas installations included in this agreement are located in a total of 15 different buildings in Trondheim. The buildings are mainly located at Gløshaugen in addition to a small number on Brattøra and Øya. The service contract is administered by the property department at NTNU, but the gas installations are owned by different institutes and the work shall be invoiced directly to each individual institute/site owner, total 23 units. The facilities currently include approx. 269 gas centrals with a total of 1,484 call-offs. The contracting authority is different departments and faculty at NTNU, Rise PFI AS and Sintef, each of which is the owner and orderer for their plants. The contract shall be a complete service agreement that includes: • Annual systematic condition checks • Improvements, including maintenance and repairs, as well as minor expansions and changes in the existing installations, as needed. • Re-opening and shut-off of systems and components as needed, a complete description of the delivery is in the requirement specifications.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 18. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist AVINOR AS.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.