Connaught Airport Development Company LtdCharlestownTED
Apron Safety Reconfiguration Project
The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing st...
Straßenbau, Elektroinstallation, Leitungsbau, Kanalbau, Pflasterarbeiten
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Connaught Airport Development Company Ltd
- Veröffentlicht:
- 17. August 2026
- Frist:
- 14. September 2026
- Thema:
- Straßenbau
- Bauobjekt:
- Flughafen-Piste / -Vorfeld
Bauobjekt-Klassifikation
- Flughafen-Piste / -VorfeldHauptobjekt
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The scope of works comprises the reconfiguration of three nose-in aircraft stands adjacent to the terminal building to improve apron safety, operational efficiency and passenger routing. The Works are anticipated to include, but are not limited to, the following elements: • Apron Reconfiguration and Geometry Reconfiguration of existing stand layout to provide three fully independent Code C stands, eliminating operational constraints associated with the existing arrangement and improving aircraft manoeuvrability. • Pavement and Civil Engineering Works Construction of new rigid pavement for aircraft stands, flexible pavement works for taxi lane and fillets, and localised rehabilitation and overlay works to existing apron areas. • Drainage and De-icing Infrastructure Provision of drainage infrastructure, including dedicated de-icing areas with appropriate collection and treatment systems. • Airfield Systems and Ancillary Infrastructure Integration of airfield ground lighting (AGL), markings, and associated electrical and ducting infrastructure required to support the revised apron layout. • Passenger Interface Improvements Provision of covered walkways and associated infrastructure to enhance passenger safety and segregation from aircraft and ground operations. The Works will be delivered within a live operational airport environment and will require careful planning, phasing and coordination to maintain ongoing operations, including aircraft movements, passenger flows and ground service activities. The Works will also be subject to airport security requirements, including Garda vetting, BSAT training, security clearance processes and compliance with all applicable airport access permit requirements. Please refer to the tender documents for more details
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10NTA25 New terminal apron
Isavia ohf.KeflavíkIsavia has entered into an agreement for the procurement of works for the NTA25 New terminal apron at Keflavík Airport. The scope of work is to design, supply, works, program, and perform testing, and commissioning of the new NTA25 New terminal.Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork.
Presentation Secondary School (Ballyphehane)BallyphehaneFrist: 24. Aug.The proposed development consists of Reconfiguration Works to provide •1 No. Conversion of Existing Home Economics Room in to Art Room (96.5m²), •1 No. Conversion of Existing Art Room in to Wood Technology Room (99.5m²), •In-Fill construction providing a Wood Machining and Preparation Room of 30m² area. The proposed reconfiguration layouts make the maximum use of the existing available space within the existing classrooms and the additional in-fill Wood Machining and Preparation Room slots within the existing footprint of the building.Technical Design Services for the Capital Repair and Reconfiguration of IP “Mihai Eminescu” Theoretical High School, Chisinau
National Office for Infrastructure Development "MoldovaProject"ChișinăuThe procurement concerns the provision of technical design and related consultancy services for the capital repair and functional reconfiguration of the public institution “Mihai Eminescu” Theoretical High School Chisinau. The scope includes the technical assessment of the existing buildings and infrastructure, preparation of concept, technical, and detailed design documentation, development of architectural and engineering solutions, preparation of cost estimates, and assistance throughout the approval and permitting process. The objective is to modernize the educational infrastructure, improve structural safety, energy efficiency, accessibility, and functionality, and ensure compliance with current national technical, environmental, and educational standards.Letterkenny Northern Network Project - Ground Investigation Contract
Donegal County Council_1193LiffordFrist: 14. Sept.The Letterkenny Northern Network Project aims to develop the transport network to the North of Letterkenny Town. This strategic piece of infrastructure aims to provide a new enhanced connectivity link between Glencar and the Knocknamona Roundabout, reduce traffic congestion, support compact growth, and encourage modal shift. The scheme aims to provide a new road realignment of the existing L1152-1 Windyhall Road, include provision for segregated pedestrian and cyclist active travel facilities throughout the scheme, with reallocation of road space to accommodate this on existing sections of road. The works will involve carrying out a number of boreholes (rotary open-hole drilling and core holes), slit trenches, trial pits, pavement cores, dynamic cone penetrometer. The boreholes are provided to determine sufficient sub-ground conditions and depth to bedrock below proposed foundations. Trial pits are provided to obtain a geological description of the first meters of soils, to carry out in situ testing and to obtain soil samples. Pavement cores will provide information on the type of existing pavement at tie ins of the proposed road with the existing roads. Geophysical surveying can be used to aid in the detection of buried utilities. Slit trenches will provide information to establish the line, level, dimensions and type of services. Dynamic cone penetrometer will provide information about the soil strength and stiffness at areas of difficult access. Traffic Management will be required to provide a safe working environment for all works on or in the vicinity of the public roads. The plans showing the extent and type of work to be carried out at specific locations are indicated on the drawings included within the scope.Technical Design Services for the Capital Repair and Reconfiguration of IP “Olimp” Theoretical High School, Ialoveni
National Office for Infrastructure Development "MoldovaProject"ChișinăuThe procurement concerns the provision of technical design and related consultancy services for the capital repair and functional reconfiguration of the public institution “Olimp” Theoretical High School, Ialoveni. The scope includes the technical assessment of the existing buildings and infrastructure, preparation of concept, technical, and detailed design documentation, development of architectural and engineering solutions, preparation of cost estimates, and assistance throughout the approval and permitting process. The objective is to modernize the educational infrastructure, improve structural safety, energy efficiency, accessibility, and functionality, and ensure compliance with current national technical, environmental, and educational standards.Technical Design Services for the Capital Repair and Reconfiguration of IP “Bogdan Petriceicu Hașdeu” Theoretical High School, Olănești village, Ștefan Vodă district
National Office for Infrastructure Development "MoldovaProject"ChișinăuThe procurement concerns the provision of technical design and related consultancy services for the capital repair and functional reconfiguration of the public institution “Bogdan Petriceicu Hașdeu” Theoretical High School in Olănești, Ștefan Vodă district. The scope includes the technical assessment of the existing buildings and infrastructure, preparation of concept, technical, and detailed design documentation, development of architectural and engineering solutions, preparation of cost estimates, and assistance throughout the approval and permitting process. The objective is to modernize the educational infrastructure, improve structural safety, energy efficiency, accessibility, and functionality, and ensure compliance with current national technical, environmental, and educational standards.PEACEPLUS Funded Tender - Girona Project - PEACEPLUS
Causeway Coast and Glens Borough CouncilColeraineFrist: 09. Sept.The contract is for the provision of Works Contract in relation to the development works at the Portballintrae Coastal Path (integral part of the Causeway Coast Way/Ulster Way), starts at Portballintrae car park, Beach Rd, Bushmills BT57 8RT. The project at the Portballintrae Coastal Path is located within an area of significant natural and cultural heritage. The Portballintrae Coastal Path follows the coastline, linking Portballintrae to the Giant’s Causeway. The proposed improvement works are aligned with the Client Scope to include the following as a minimum: • Provision of trailhead information hub in main car park, in line with other hubs provided at key recreational sites including Garvagh Forest and Banagher Glen. • General upgrade to furniture and fences in the lower car park area. • Repairs to the Three-Quarter Bridge • Replacement of raised boardwalk alongside River Bush • Repairs to boardwalk paths • Provision of waymarking and seating along route • Provision of visitor monitoring equipment at 2 locations along route The works include for the complete design and construction as contained within the specifications, works information, drawings and schedules. The works contract is for a full Design & Build by the successful tenderer, who will be required to align the design with all Architectural, and Civil / Structural performance specifications provided and obtain all necessary statutory approvals (inclusive of associated fees) and comply with Environmental obligations as detailed in HRA’s and Assent conditions. All works shall be Contractor designed to the minimum performance specifications and liaise with client team to finalise and sign off the final contractor designs. The successful tenderer must be able to demonstrate that they have delivered works contracts of a similar scale and scope previously.Doneraile Weirs Barrier Mitigation Project
Inland Fisheries IrelandDublinFrist: 24. Sept.Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of a Barrier Mitigation Project, Doneraile Weirs on the Awbeg River in Doneraile, Co. Cork, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environmental and planning services required to progress the project through feasibility, option selection, and statutory consent stages in accordance with the Planning and Development Acts 2000–2023, the Capital Works Management Framework, and Infrastructure Guidelines 2023. The Barrier Mitigation Project aims to mitigate the impacts of the identified barriers on fish passage and restore more natural river processes along the associated rivers. The commission forms a specific action under Ireland’s Water Action Plan 2024 and supports implementation of the National Barrier Mitigation Programme to deliver improved ecological status under the EU Water Framework Directive. The Consultant will act as the Designer, Project Supervisor Design Process during all Phases of the project and carry out all related necessary duties.Engineer Led Integrated Design Team Consultancy Services for the Proposed Reconfiguration and Upgrade of HRI HQ Building and Associated Outbuildings, Ballymany, The Curragh
Havas MediaDublinHorse Racing Ireland is seeking to establish a contract for Engineer-Led Integrated Design Team Services to progress a project to deliver a proposed Reconfiguration and Upgrade of HRI HQ Building and Associated Outbuildings. The successful integrated design team or single point design team (SPDT) will be composed of a multi-disciplined competent and suitably experienced Architect – Led Design Team to provide relevant consultancy services in respect of the project.Wayside Celtic Renewable Energy Project
Wayside Celtic Football Club CLGKilternanFrist: 28. Aug.Wayside Celtic FC invites tenders from suitably qualified contractors for the upgrade of building services at Jackson Park. The works comprise the removal of existing domestic hot water tanks and associated equipment and the installation of a new heat pump domestic hot water system together with a two-pipe VRF air conditioning system. The successful contractor will be responsible for the supply, installation, controls, commissioning, certification and warranty of all systems, as well as the disposal of existing equipment. All works are to be completed in accordance with the attached tender specification, relevant Irish and EU regulations, and the manufacturers’ standards and recommendations.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 14. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Connaught Airport Development Company Ltd.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.