Office of Public Works (OPW)TrimTED
Accessible Entrance and Lobby Works at DSP, Block 1, Government Offices, Hebron Road, Kilkenny.
Accessible Entrance and Lobby Works at DSP, Block 1, Government Offices, Hebron Road, Kilkenny.
Nichtwohnungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Office of Public Works (OPW)
- Veröffentlicht:
- 12. August 2026
- Frist:
- Nicht angegeben
- Thema:
- Nichtwohnungsbau
- Bauobjekt:
- Verwaltungsgebäude
Bauobjekt-Klassifikation
- VerwaltungsgebäudeHauptobjekt
Ausschreibungsbeschreibung
Accessible Entrance and Lobby Works at DSP, Block 1, Government Offices, Hebron Road, Kilkenny.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten2 Angaben erfasstBieter und Auftragnehmer · Anschrift
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Proposed Roof Upgrade Works to Block B and Lobby at Ballyhaise Agricultural College
Teagasc - the Agriculture and Food Development AuthorityCarlowProposed Roof Upgrade Works to Block B and Lobby at Ballyhaise Agricultural CollegeProvision of Grounds Maintenance Services for the Department of Social Protection (DSP) at two sites in Sligo Town, the Pension Services Office , College Road and Government Buildings, Cranmore Road
Department of Social Protection_349Dublin 1Frist: 18. Sept.In summary, the Services comprise: Provision of Grounds Maintenance Services for the Department of Social Protection (DSP) at two sites in Sligo Town, the Pension Services Office (PSO) on College Road and Government Buildings on Cranmore Road (Sligo Intreo).Single storey extension to Gaelscoil Osraí Primary School, Outrath Road, Kilkenny, R95 AT85.
Gaelscoil OsraiKilkennyFrist: 16. Sept.Construction of a single storey extension of 113.0 Sq.M area consisting of one additional mainstream classroom, accessible WC, link corridor, connection to existing school services and all associated site works at Gaelscoil Osraí Primary School, Outrath Road, Kilkenny, R95 AT85.Finglas Primary Care Centre
Health Service Executive (HSE)KildareFrist: 24. Sept.New build, four-storey with roof plant level, gross internal area approximately 10,517 sqm. The development comprises a HSE Primary Care Centre and GP block with a Tusla child and family agency office in the north-east block, served by two internal landscaped courtyards. The main public entrance is located on the south elevation off a new access road, with a secondary 7-day access entrance on the west elevation off Cardiffsbridge Road. The building is constructed over five levels with finished floor levels rising from 61.000m at Level 00 to 76.800m at Level 04, with roof plant set back 3.5m from the facade and screened at Level 04. External works include a connection to the new access road, 88 car parking spaces, 64 sheltered cycle spaces, hard and soft landscaping and all associated site and enabling works.Construction Works to The Multiple Sclerosis Society of Ireland Care and Respite Centre at 65 Bushy Park, Dublin 6
The Multiple Sclerosis Society of IrelandDublinThe project consist of two elements Block A Block B The facility at 65 Bushy Park is a Care and Respite Centre for people with Multiple Sclerosis. The existing facility comprises a number of buildings. There is a Main Building of two storeys to the front and this houses administrative offices. There is a single storey building to the West of the Main Building know historically as the Promotions Unit . This single storey building will be demolished to make space for a new two storey building called “Block A”. Block A will house offices at first floor and a multi use space at ground floor which will be accessible to the general public. The rear of the Main Building contains singles storey extensions built in the 1990’s and 2000’s. These extensions house the main Care Centre and are used for residents of the Care Centre only. It houses bedrooms and various therapy rooms plus some ancillary facilities. Within these extensions there is an existing Therapy Room to the East of the site which is to be extended as part of the project. This Extension is called “Block B”. All the buildings except the Promotions Unit which is to be demolished are to remain live and operating during the course of construction.RFT 02/26/GM - Works Contractor and PSCS for ATU Dublin Road EEDPP2 Energy Retrofit at Atlantic Technological University at the Galway City Campus
Atlantic Technological UniversityLetterkennyFrist: 21. Sept.Atlantic Technological University (ATU) is seeking suitably qualified and experienced contractors to undertake an energy retrofit project at its Galway City Dublin Road Campus. The project comprises the retrofit of approximately 4,425m² of the original 1972 building and forms part of the Higher Education Authority (HEA) and Sustainable Energy Authority of Ireland (SEAI) funded Energy Efficiency and Decarbonisation Pathfinder Project (EEDPP2). The works include building fabric upgrades, roof and window replacement, ventilation improvements, lighting and controls upgrades, and the installation of a medium-temperature air-source heat pump, with existing gas boilers retained for peak demand and backup. The project aims to improve energy efficiency, reduce carbon emissions, extend the building's operational life, enhance occupant comfort, increase the use of renewable technologies, and achieve a minimum B1 BER rating. The existing building is a reinforced concrete framed structure currently served by the campus central heating system and a combination of natural and mechanical ventilation systems.Generalunternehmerleistungen inkl Planungsleistungen für das ISTA Housing
ISTA Housing GmbHKlosterneuburgFrist: 17. Aug.Generalunternehmerleistungen inkl Planungsleistungen für das ISTA HousingJURA | Generalunternehmerleistungen für Generalsanierung Rundturnhalle
Stadt Wien Magistratsabteilung 51 – Sport Wien, vertreten durch WIP Wiener Infrastruktur Projekt GmbHWienDie Auftraggeberin hat den Auftragnehmer am 07.08.2024 mit den Generalunternehmerleistungen für die Generalsanierung JURA, Jura-Soyfer-Gasse 3, 1100 Wien, zu einem Auftragswert von EUR 6.742.190,92 netto beauftragt. Die gegenständliche Bekanntgabe erfolgt aufgrund der Beauftragung des Auftragnehmers mit zusätzlich erforderlichen Leistungen im Rahmen dieses Vertrages (Vertragsänderung).Daisy Building Enhancement carried out by Donegal County Council
Donegal County Council_1193LiffordFrist: 28. Aug.Donegal County Council is carrying out enhancement works to the Daisy building in Barrack Hill Park CarndonaghTransformation de l'ancien rural et constructions de deux pavillons - LOT 4 CHARPENTE - FACADE - COUVERTURE
Commune de Savigny (SCA Arch.)SavignyFrist: 08. Okt.Le présent projet porte sur la transformation de l’ancien rural et la construction de deux pavillons à Savigny, route de Mollie-Margot 3.Le rez-de-chaussée du rural accueillera un réfectoire scolaire d’environ 105 places ainsi qu’une cuisine de régénération.Les deux niveaux supérieurs seront aménagés en cabinet médical, avec de la médecine générale au 1er étage et de la pédiatrie au 2e étage.L’ancien rural fera l’objet de travaux de sous-œuvre permettant la création d’un sous-sol partiel au sud et l’abaissement du niveau du rez-de-chaussée.Une nouvelle dalle en béton assurera la stabilisation et la rigidification du bâtiment.Deux nouveaux volumes compléteront l’intervention : la ludothèque au nord et la salle de rythmique le long de la route de Mollie-Margot, tout deux sont principalement en bois avec des parties en béton sur les faces enterrées
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Office of Public Works (OPW).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.