Energinet Eltransmission A/SFredericiaTED
25/14408 - Purchase 2026 for 145/170 kV AC Cables
Procurement of complete 145/170 kV AC cable systems via 4 agreements (lots). Lot 1: NEA project (~820 km, estimated EUR 122.1M with 10% option). Lot 2: 3N project (~585 km). Prequalification possible for all lots. Award per lot based on best price-quality ratio. Detailed scope in tender documents.
Kabel
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Procurement of complete 145/170 kV AC cable systems via 4 agreements (lots). Lot 1: NEA project (~820 km, estimated EUR 122.1M with 10% option). Lot 2: 3N project (~585 km). Prequalification possible for all lots. Award per lot based on best price-quality ratio. Detailed scope in tender documents.
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Energinet Eltransmission A/S
- Veröffentlicht:
- 06. Mai 2026
- Frist:
- 22. Mai 2026
- Thema:
- Kabel
Ausschreibungsbeschreibung
Procurement of complete 145/170 kV AC cable systems via 4 agreements (lots). Lot 1: NEA project (~820 km, estimated EUR 122.1M with 10% option). Lot 2: 3N project (~585 km). Prequalification possible for all lots. Award per lot based on best price-quality ratio. Detailed scope in tender documents.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
2- Gas Storage Denmark A/SFredericiaFrist: 15. Juni
Gas Storage Denmark: Onshore Intervention Services related to wells on natural gas storage LOT 1-3: 2027-2034
Expected consumption: 4.360.000 EUR. Maximum value: 6.530.000 EUR if the contractual expansions of 2 x 25 % of the value are both activated. The overall purpose of the Framework Agreement is for Supplier to support Gas Storage Denmark (GSD) in the planning and execution of GSD's Reservoir logging and well diagnostics covering Pulsed neutron, Production Logging operations and data interpretation. Other E-line work such as Re-Perforating, Calliper of Tubing, Ultrasonic measurement, running Camera and leak detection can be expected in connection with yearly requirements for Pulsed neutron logging. GSD requires the Supplier to provide Integrated Wireline Trucks - accompanied, if possible - by a trailer fitted with all additional required equipment for the Works. This is to minimize additional trucks and personnel on the well site and to assure that transfer of equipment between wells can be conducted with minimum use of additional trucks and crane assistance. For more information see Appendix 2: Scope of Works LOT 1 (doc. no. 25/18898-1) and 2A: Technical and Functional Requirements LOT 1 (doc. no. 25/18898-2). The Contracting Authority wants to ensure robustness for Gas Storage Denmark regarding services of importance. For that reason, the Scope of Works for LOT 1 and LOT 2 are overlapping with specific tools that are required for investigation of the condition of the wells. The reasoning is that it should be possible for GSD to conduct additional investigations – and therefore minimize mobilizations – when already conducting services under the respective lot. Consequently, the Contracting Authority will not award LOT 1 and LOT 2 to the same Supplier. Tenders can be submitted for all lots, but the tenderers who have applied and been prequalified to both LOT 1 and LOT 2 are required to indicate an order of priority in the case they will have the most economically advantageous tender based on the best price-quality ratio for both LOT 1 and for LOT 2. In this case the applicant will be awarded the 1st priority lot but will be excluded from the evaluation of the 2nd priority lot. The priority is to be submitted by filling out the attached template: Template 4: Priority between LOT 1 and LOT 2 (doc. no. 25/12155-45) in connection with the submission of the initial tender – and only by tenderers who have applied and been prequalified to both LOT 1 and LOT 2. Considering the above-described limitations - subsequent contracts under the framework agreement will be awarded directly to the supplier who submitted the most economically advantageous tender, see section 4.1. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible. - Gas Storage Denmark A/SFredericiaFrist: 15. Juni
Gas Storage Denmark: Onshore Intervention Services related to wells on natural gas storage LOT 1-3: 2027-2034
Expected consumption: 4.360.000 EUR. Maximum value: 6.530.000 EUR if the contractual expansions of 2 x 25 % of the value are both activated. The overall purpose of the Framework Agreement is for Supplier to support Gas Storage Denmark (GSD) in the planning and execution of GSD's Reservoir logging and well diagnostics covering Pulsed neutron, Production Logging operations and data interpretation. Other E-line work such as Re-Perforating, Calliper of Tubing, Ultrasonic measurement, running Camera and leak detection can be expected in connection with yearly requirements for Pulsed neutron logging. GSD requires the Supplier to provide Integrated Wireline Trucks - accompanied, if possible - by a trailer fitted with all additional required equipment for the Works. This is to minimize additional trucks and personnel on the well site and to assure that transfer of equipment between wells can be conducted with minimum use of additional trucks and crane assistance. For more information see Appendix 2: Scope of Works LOT 1 (doc. no. 25/18898-1) and 2A: Technical and Functional Requirements LOT 1 (doc. no. 25/18898-2). The Contracting Authority wants to ensure robustness for Gas Storage Denmark regarding services of importance. For that reason, the Scope of Works for LOT 1 and LOT 2 are overlapping with specific tools that are required for investigation of the condition of the wells. The reasoning is that it should be possible for GSD to conduct additional investigations – and therefore minimize mobilizations – when already conducting services under the respective lot. Consequently, the Contracting Authority will not award LOT 1 and LOT 2 to the same Supplier. Tenders can be submitted for all lots, but the tenderers who have applied and been prequalified to both LOT 1 and LOT 2 are required to indicate an order of priority in the case they will have the most economically advantageous tender based on the best price-quality ratio for both LOT 1 and for LOT 2. In this case the applicant will be awarded the 1st priority lot but will be excluded from the evaluation of the 2nd priority lot. The priority is to be submitted by filling out the attached template: Template 4: Priority between LOT 1 and LOT 2 (doc. no. 25/12155-45) in connection with the submission of the initial tender – and only by tenderers who have applied and been prequalified to both LOT 1 and LOT 2. Considering the above-described limitations - subsequent contracts under the framework agreement will be awarded directly to the supplier who submitted the most economically advantageous tender, see section 4.1. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 22. Mai 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Energinet Eltransmission A/S.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.