Installation of new water infrastructure to upgrade the fire fighting watermain, including hydrants, sluice valves, water meters, etc., and making good of any surfaces damaged or excavated during the works.
Pipeline Construction
No credit card · Instant access
Content at a glance
Installation of new water infrastructure to upgrade the fire fighting watermain, including hydrants, sluice valves, water meters, etc., and making good of any surfaces damaged or excavated during the works.
- Tender type:
- Tender
- Contracting authority:
- IDA Ireland
- Published:
- May 07, 2026
- Deadline:
- June 04, 2026
- Topic:
- Pipeline Construction
- Object:
- Trinkwasserleitung / Versorgungsnetz
Object classification
- Trinkwasserleitung / VersorgungsnetzPrimary
Tender description
Installation of new water infrastructure to upgrade the fire fighting watermain, including hydrants, sluice valves, water meters, etc., and making good of any surfaces damaged or excavated during the works.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- IDA IrelandDublin
Lighting Upgrade Works - IDA Business and Technology Park, Letterkenny, Co. Donegal
Decommissioning and removal of existing lighting fixtures and columns as per drawings. Installation and commissioning of new lighting fixtures and columns and associated civils works at the IDA Business and Technology Park Letterkenny, Co. Donegal - IDA IrelandDublinDeadline: May 25
Infrastructure Works at IDA Business Park, Carrick-On-Shannon, Co. Leitrim
Extension to the Business Park road to sweep around the Fruedenberg proposed parking area. Road is also to join into the junction of the new carpark. Other works include, cycle lanes, public lighting and an ESB diversion of MV overhead lines to run underground. - Donegal County Council_1193Lifford
Connection of Townawilly Group Water Scheme Co-Operative Society to the Public Water Supply
This project involves upgrading and restructuring the water supply infrastructure in the Townawilly area. The aim is to improve water quality, ensure compliance with regulatory standards, and deliver a more efficient and reliable water network. The contract includes the design and construction of an interconnector water main to connect the existing scheme to the Public Water Supply Scheme (PWSS) operated by Uisce Éireann (UÉ), which will allow for the decommissioning of the Townawilly Group Water Scheme (GWS) Water Treatment Plant. The contract also involves key upgrades to UÉ infrastructure, including construction of new watermain connections and a new booster pump station (PS) at the Glencoagh Storage Reservoir (SR) site to serve both the Glencoagh and Eddrim Glebe networks. Additionally, the Eddrim Glebe PS will be upgraded with new pumps and a change in the pumping arrangement. - Lisnagry National SchoolLimerickDeadline: Jun 08
Proposed Roof and Internal Upgrade Works, at Lisnagry National School, Lisnagry, Limerick
The works comprise the removal and replacement of the existing flat roof and mono-pitched roof to the existing school building,including all associated roof coverings, insulation, membranes,flashings, and related roofing components. The works shall also include the removal and replacement of existing rooflights to affected areas, complete with insulated upstands, flashings, and integration with the new roof system to ensure a weather-tight and thermally efficient installation. In addition, provide for the replacement and upgrade of the existing rainwater drainage system, including gutters, downpipes, outlets, box gutters, and all associated fittings. Internal painting shall also be carried out to all affected areas resulting from the roof replacement works, including preparation and painting of ceilings, walls, and adjoining surfaces as required, together with all making good. - St Oliver Plunkett NS NewcastleAthenryDeadline: Jun 08
St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
The existing school building (1977, extensions 2010-2013 and 2025, approx. 732 sq. m) requires stripping out and disposal of the old LPHW space heating, cold water storage, and boiler house in the original building. New works include general power for the heating upgrade, emergency lighting, and fire alarm. Retain existing electrical and Solar PV. - Donegal Education and Training Board_368LetterkennyDeadline: Jun 23
Invitation to Tender for Construction Works at Abbey Vocational School, RN71180F, The Glebe, Donegal Town, Co. Donegal, F94A409 - 2025 CASWS - Climate Action and Window Project Upgrade Works
Tender for Construction Works at Abbey Vocational School, RN71180F, The Glebe, Donegal Town, Co. Donegal, F94A409 - 2025 CASWS - Climate Action and Window Project Upgrade Works Removal and replacement of selected doors, windows, windows box framing, pumping of cavity bead insulation, the supplying and fitting of news blinds, passive wall vents and making good all damage to the existing building - Rásaíocht Con ÉireannLimerickDeadline: Jul 10
Refurbishment and improvement works at Curraheen Park Greyhound Stadium
Greyhound Racing Ireland ("the Employer") invites suitably qualified and experienced Contractors to submit a Tender for the execution and completion of refurbishment and improvement works at Curraheen Park Greyhound Stadium, together with all associated works as described within the Tender Documents. The Works comprise the refurbishment and upgrading of identified areas within Curraheen Park Greyhound Stadium, including associated building, architectural, mechanical and electrical works, finishes, fittings and all ancillary works necessary to complete the project in accordance with the Contract Documents. The principal elements of the Works include, but are not limited to, refurbishment of public circulation areas, bars, restaurants, corporate hospitality suites, sanitary accommodation, stairways and back-of-house areas, together with the formation of new wind lobbies, associated signage, floor, wall and ceiling finishes, joinery refurbishment, decoration and all associated making good. The Works are required to be undertaken within a live greyhound racing venue and are subject to critical operational milestones associated with the 2026 Laurels competition. Tenderers shall satisfy themselves that the proposed Works can be executed within the programme constraints set out in the Tender Documents, including the requirement to complete the Phase 1 Works by 11 September 2026 to facilitate operational readiness prior to the commencement of the Laurels. Tenderers are invited to submit a competitive Tender based upon the requirements set out within the Tender Package and in accordance with the Public Works Contract identified therein. - Newry Mourne and Down District CouncilNewryDeadline: Jul 17
CA18069 Tender 35/2026 - PEACEPLUS PP1010 - Dundrum GAC - Internal and External Upgrade Works
Applications are invited from Contractors, under the terms of the NEC4 ECSC Short Contract, for the following project: PP1010 Dundrum GAC - Internal and External Upgrade Works: redevelop and refurbish the existing facility provision at Dundrum Parish Hall GAC Club. These Works will include repairs to walls, ceilings, and roof as well as supply and installation of new doors and windows, installation of new kitchen and toilets, painting and decorating etc. The estimated cost of the project is £82,940.00 excluding VAT. To access this opportunity, log in to https://suppliers.multiquote.com and view the opportunity. If you are not registered with MultiQuote, please visit https://suppliers.multiquote.com, complete the registration form on the log in page and quote the title and reference of the notice in your registration. Signed: Mrs Marie Ward Chief Executive All relevant submissions to be received on or before 12 Noon on 22 July 2026 A project supported by PEACEPLUS, a programme managed by the Special EU Programmes Body (SEUPB). - Transport Infrastructure Ireland (TII)DublinDeadline: Jul 13
MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Site clearance and removal of materials; Surveys and/or ground investigations; Bulk earth and rock excavation works; Construction and outfitting works; Building construction and fit-out; Construction of single or multi-span viaducts, overbridges, under bridges and walkways over or under live carriageways and waterways, retaining walls and guide walls, diaphragm walls, secant piling and contiguous piling, rock bolts, anchors, capping beams, shotcrete works, mesh works, sealing of fissures etc., underground and above ground reinforced concrete structures and associated temporary works/propping/other reinforcement works; Monitoring of settlement and ground movement and associated remedial works; De-watering and water treatment/disposal management; Site waste management; Mechanical , electrical and plumbing works as required, perform the roles of PSDP and PSCS; Structural, civil, and engineering design; Any other related works. The procurement of the M120 Framework (the Competition) will be conducted under the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (as amended) (SI 286/2016), and will be managed by TII, acting as the contracting authority, who will be the sole point of contact for applicants. The M120 Framework will be a multi-party Framework Agreement (per Regulation 50 of the Utilities Regulations) consisting of two (2) value based lots. The competition will be structured as a two-stage process with Stage 1 the Selection Stage and Stage 2 the Tender Stage. A maximum of three (3) tenderers will be appointed to each lot. Applicants may apply for one (1) lot only. A tenderer appointed to either lot under the M120 Framework is not precluded from participating in other MetroLink projects or contract packages. The lots are as follows: Lot 1 - Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. Lot 1 will consist of call-off contracts for large elements of civils works, which may include station boxes, tunnel portals, single or multi span viaducts, and other contract packages. Lot 2 - Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1. Lot 2 will consist of call-off contracts for elements of civils works, which may include retaining walls, other foundation/support works. Conduct of the Competition Stage 1: The Selection Stage will commence with the publication of a Pre-Qualification Questionnaire (PQQ) by TII. This will assess applicants based on defined selection criteria for each lot, such as their financial and economic standing, technical capability, and relevant experience. Provided that there is a sufficient number of applicants for each lot, five (5) applicants for each of the two (2) lots will be shortlisted. If less than five (5) applicants meet the minimum requirements for a lot, TII reserves the right to proceed with those applicants to the second stage of the procurement for that lot. The PQQ process to establish both lots will run concurrently. Stage 2: The Tender Stage for the award of the framework and first call-off contracts will commence with TII issuing the Invitation to Negotiate (ITN) to each tenderer for that lot. Following the submission and evaluation of ITN tenders, TII reserves the right to engage in further negotiations with tenderers. Following the negotiation phase, TII may request the submission of Best and Final Offers (BAFOs). The three (3) highest ranked tenderers under each lot will be appointed to the M120 Framework and will be eligible to compete for future call-off contracts. The 4th and 5th ranked tenderers under each lot will be reserve tenderers. If during the term of the M120 Framework a framework contractor no longer meets the financial and economic standing requirements in the PQQ or does not submit a tender in response to a call-off tender for three or more call-off contracts in a row then TII reserves the right to terminate the framework agreement with that contractor and appoint one of the reserve tenderers to the M120 Framework. Furthermore, the highest ranked tenderer under each lot will be awarded the first call-off contracts under each lot: Lot 1 award of the contract for the Dublin Airport station box (see 5.1 Lot: LOT0001); Lot 2 award of the contract for the Glasnevin station retaining wall (see 5.1 LOT 0002). Future call off contracts will be awarded by way of mini-competition following the issue of the call-off tender document to the framework members. Detailed information regarding the award criteria for the future / subsequent call-off contracts after the first call-off contracts will be communicated to tenderers appointed to each lot of the M120 Framework as they arise based on TII’s requirements. The M120 Framework may also be used by Iarnród Eireann - Irish Rail to procure call-off contracts for heavy civil engineering works at or adjacent to Glasnevin station (including, without limitation, retaining wall construction, ground stabilisation, utility diversions, interface works with the MetroLink alignment, and preparatory or enabling works necessary to facilitate the integration of MetroLink with the existing Irish Rail network at that location), provided that the works in question fall within one or more of the categories of work set out in the scope of works for the M120 Framework. Refer to the PQQ documents for further information. - FAGNE ASHAUGESUNDDeadline: Aug 20
Prequalification: Ground work and construction of a transformer building as well as the establishment of cable trenches - Haugaland Næringspark
This procurement is for a turnkey contract for ground work and the construction of a new transformer station in Haugaland Næringspark. The project aims to ensure energy supply to the business park and facilitate planned industrial development in the area. In the long term the measure will also strengthen the security of supplies in Haugalandet and enable the connection of energy production from Tysvær wind power plant. The transformer station is planned to be erected with one station building and five transformer cells. This contract is for the ground work, as well as the construction of the station building and two of five transformer cells. The transformer station shall be certified in accordance with BREEAM-NOR v.6.0. The tenderer will be responsible for ensuring that the transformer station achieves BREEAM certification.In addition to the transformer station, the contract includes the establishment of a ground cable connection from the transformer station to the end mast (M22) on the aerial high voltage line connection between Klovning transformer station and Haugaland Næringspark, as well as cable trenches between Statnett ́s transformer station at Gismarvik and up to the station in Haugaland Næringspark etc., the Contracting Authority will choose at least two of the qualified tenderers to submit a tender, provided that there are a sufficient number of qualified tenderers. There is no upper limit for the number of qualified tenderers who can be invited to submit a tender, and the contracting authority reserves the right to invite a selection or all of them. Any selection of tenderers who are invited to submit tenders will be made based on the selection criteria in the competition description point 3.5. After the tenders are received, the contracting authority plans to carry out negotiations with the tenderers. Any negotiations may be carried out in several rounds of negotiations, where the contracting authority reserves the right to reduce the number of tenders to be negotiated. A first reduction of the number of tenders can occur already before the negotiations, cf. the Utilities Regulations § 19-12 (4). Any reductions in the number of tenders will be made on the basis of the award criteria. The Contracting Authority is also subject to awarding the contract without negotiations. Tenderers are thus encouraged to submit a good and competitive first tender. Emphasis is put on the fact that this is only a general description of the procurement. See the other procurement documents, including the function description, the contract documentation, access model, reports and drawings etc. for further information.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 04. Juni 2026.
- Who is the contracting authority?
- The contracting authority is IDA Ireland.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.