Mayo County Council_1127
View CfT Workspace
The project involves installation of 2287m of 110mm OD PE100 SDR17 main to connect Curramore (Ballinrobe) Group Water Scheme to Uisce Éireann,2020m of distribution pipe 63mm OD PE80 SDR11 main to replace the existing pipes, including the installation of new valves, fittings, 4 new bulk meters and 45 connections to new and existing pipes. ...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Mayo County Council_1127
- Published:
- August 19, 2026
- Deadline:
- August 19, 2026
Tender description
The project involves installation of 2287m of 110mm OD PE100 SDR17 main to connect Curramore (Ballinrobe) Group Water Scheme to Uisce Éireann,2020m of distribution pipe 63mm OD PE80 SDR11 main to replace the existing pipes, including the installation of new valves, fittings, 4 new bulk meters and 45 connections to new and existing pipes. Installation of valves and fittings on the existing Curramore (Ballinrobe) Group Water Scheme network.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
3 data areas available
30 days free · no credit card · cancel anytime
Related tenders
5View CfT Workspace
Ardeamush Fernhill GWSDeadline: Aug 06Ardeamush Fernhill Group Water Scheme Committee seek tenders from competent contractors for the proposed upgrade of the existing group water supply network scheme located in Ardeamush / Fernhill, Doolin, Co. Clare. The project involves the replacement of approximately 2.7km of existing 50mm diameter watermain pipe with new 100/50mm diameter watermain pipe together with new bulk meter, valves, fittings, water meters and all ancillary works.View CfT Workspace
Waterford City and County Council_103683Deadline: Aug 20Waterford City and County Council require the services of a competent and experienced Consulting Engineer with experience in Civil Engineering works in water distribution systems in Group Water Schemes and Public Water Schemes. Through this tender, the suitably appointed Consult Engineer will work with the Coolcormack Valley GWS that requires such works to be carried out to cover, the assessment, design, procurement, and project manage the necessary works, and complete the Connection of the Group Water Scheme mains to Uisce Eireann network.View CfT Workspace
The Highrath Group Water SchemeDeadline: Aug 18Highrath Group Water Scheme (“the Client”) requires the services of a suitably qualified and experienced Consulting Engineer (“the Engineer”) with proven expertise in civil engineering works relating to water distribution systems in Group Water Schemes and public water supplies.Tawnagh Group Water Scheme – Pipeline Replacement Works
Tawnagh Group Water SchemeSligoDeadline: Jul 17This Contract includes all civil engineering works associated with the supply, installation, and commissioning of approximately 855m of new sections of 110mm OD PE80 SDR11 pipeline, comprising the replacement of existing 2-inch and 1-inch diameter distribution mains and the extension of the network.View CfT Workspace
Killocrim N.S.Deadline: Aug 19The project involves the diversion of existing foul drains 1km away to the nearest Irish Water Connection point by means of a pumping station and rising main, diversion of the storm drains to a new attenuation installation, upgrade of in situ electrical installation to accommodate pumping station and all other ancillary works.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 19. August 2026.
- Who is the contracting authority?
- The contracting authority is Mayo County Council_1127.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.