Mayo County Council_1127
View CfT Workspace
design, supply, installation and maintenance of enhanced festive and programmable lighting infrastructure in Ballina and will install various lighting schemes throughout the town which can be utilised throughout the year. MCC reserves the right to Partial Award.
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Mayo County Council_1127
- Published:
- August 14, 2026
- Deadline:
- August 14, 2026
Tender description
design, supply, installation and maintenance of enhanced festive and programmable lighting infrastructure in Ballina and will install various lighting schemes throughout the town which can be utilised throughout the year. MCC reserves the right to Partial Award.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
4 data areas available
30 days free · no credit card · cancel anytime
Related tenders
3View CfT Workspace
Mayo County Council_1127Deadline: Aug 13design, supply, installation and maintenance of enhanced festive and programmable tree lighting infrastructure in BallinaView CfT Workspace
Laois County CouncilDeadline: Aug 14Laois County Council seeks to appoint a Single Service Provider, Urban Planning Led Multi-Disciplinary Design Team, PSDP, for Project Stages (i) to (ii b) the Mountrath Town Centre Public Realm Improvement Scheme. Stage details are as follows: Stage (i) Town Spatial Strategy for Mountrath Town, Stage (ii a) Town Centre Design (focusing on the Town Centre as identified in Drawing No. 100) and Stage (ii b) Developed Design and Planning (Part 8). Design Documents, Drawings, Surveys, Reports etc. will be provided/submitted to the Contracting Authority for future use in subsequent project stages. Subsequent project stages (Detailed Design, Tender Action, Contract Award, Construction and Handover) will be the subject of a separate tender in the future which will be dependent on the availability of fundingView CfT Workspace
Monaghan County CouncilDeadline: Aug 12Monaghan County Council requires the services of a Security Company licensed by the Private Security Authority (PSA) to install an IP CCTV system in Carrickmacross Town Centre, Co. Monaghan. The system will comprise of a total of 18 cameras, Multi-Sensor, Bullet and Dome types, installed at 15 locations throughout Carrickmacross Town Centre. All cameras, with the exception of camera 18 which will be hard wired, will be linked by means of a wireless transmission network to a CCTV Server installed at the Market House building in Carrickmacross Town Centre. Cameras will be installed on a combination of new camera poles, existing public lighting poles and buildings. The installation of new camera poles, power supplies and associated civil works is being undertaken by others. Civil and electrical contractors will liaise with the CCTV contractor during the CCTV installation works. Cat5 or Cat6 cables will be in place at all camera locations. Supply and installation of interface boxes for PoE switches and data cabling between the PoE switch and cameras on buildings to be undertaken by the CCTV contractor. Termination of all data cabling by the CCTV contractor. Monaghan County Council reserves the right to proceed with some or all the CCTV locations.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 14. August 2026.
- Who is the contracting authority?
- The contracting authority is Mayo County Council_1127.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.