Donegal County Council_1193
View CfT Workspace
Breaking out of existing slipway, construction of new slipway toe and new slipway deck. Works are on Arranmore Island in a marine, coastal and tidal environment.
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Donegal County Council_1193
- Published:
- August 06, 2026
- Deadline:
- August 06, 2026
Tender description
Breaking out of existing slipway, construction of new slipway toe and new slipway deck. Works are on Arranmore Island in a marine, coastal and tidal environment.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
4 data areas available
30 days free · no credit card · cancel anytime
Related tenders
2Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council
Donegal County Council_1193LiffordDeadline: Aug 20Breaking out of existing slipway, construction of new slipway toe and new slipway deck. Works are on Arranmore Island in a marine, coastal and tidal environment.View CfT Workspace
Donegal County Council_1193Deadline: Aug 12The Letterkenny Northern Network Project aims to develop the transport network to the North of Letterkenny Town. This strategic piece of infrastructure aims to provide a new enhanced connectivity link between Glencar and the Knocknamona Roundabout, reduce traffic congestion, support compact growth, and encourage modal shift. The scheme aims to provide a new road realignment of the existing L1152-1 Windyhall Road, include provision for segregated pedestrian and cyclist active travel facilities throughout the scheme, with reallocation of road space to accommodate this on existing sections of road. The works will involve carrying out a number of boreholes (rotary open-hole drilling and core holes), slit trenches, trial pits, pavement cores, dynamic cone penetrometer. The boreholes are provided to determine sufficient sub-ground conditions and depth to bedrock below proposed foundations. Trial pits are provided to obtain a geological description of the first meters of soils, to carry out in situ testing and to obtain soil samples. Pavement cores will provide information on the type of existing pavement at tie ins of the proposed road with the existing roads. Geophysical surveying can be used to aid in the detection of buried utilities. Slit trenches will provide information to establish the line, level, dimensions and type of services. Dynamic cone penetrometer will provide information about the soil strength and stiffness at areas of difficult access. Traffic Management will be required to provide a safe working environment for all works on or in the vicinity of the public roads. The plans showing the extent and type of work to be carried out at specific locations are indicated on the drawings included within the scope.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 06. August 2026.
- Who is the contracting authority?
- The contracting authority is Donegal County Council_1193.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.