STATSBYGGOSLOTED
UiO-OUS Life Science user equipment K914.02 Safety cabinet
Safety Cabinet K914.02 für UiO-OUS Life Science User Equipment
Laboratory Instruments
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- STATSBYGG
- Published:
- August 10, 2026
- Deadline:
- Not specified
- Topic:
- Laboratory Instruments
Tender description
Safety Cabinet K914.02 für UiO-OUS Life Science User Equipment
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock2 details capturedLots LOT-0001 · Lots LOT-0002
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Related tenders
10UiO-OUS Life Science user equipment K921.02 Autoclaves UiO
STATSBYGGOSLOStatsbygg requests, in connection with project: 1004501 UiO-OUS Life Sciences / 1105601 UiO-OUS Life Science user equipment for tenders for: K921.02 Autoclaves UiO Two (2) 140 L, one door, sterilisation. One (1) 450 L, passing through.UiO Life Sciences user equipment K930.03 Centrifuges
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.UiO Life Sciences user equipment K914.04 Sterile benches
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.UiO Life Science User Equipment K914.01 Glove boxes
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.UiO Life Science user equipment K907 H2O2 disinfection equipment.
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.UiO Life Sciences user equipment. K946.01.03 Pharmaceutical extrusion/pelletising equipment
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.UiO Life Sciences user equipment. K951.02 Heat exchangers
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.UiO Life Science user equipment K941 gas generator
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.UiO Life Sciences user equipment. K930.01.02 Conventional flow cytometer
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.UiO Life Sciences user equipment. K930.15.03.02 High Content Imager
STATSBYGGOSLOStatsbygg constructs the new Life Sciences Building (LVB) for the University of Oslo and Oslo University Hospital on behalf of the Ministry of Education and Research and South-East Health as the co-contracting authority. The building shall be the workplace for approx. 1,600 employees and 1,600 students. Start up for the excavation and ground work was the second quarter of 2019 and the planned completion is at the end of 2026. Various professional environments shall work multi-disciplinary here to develop new solutions for major challenges within health and sustainability with access to the best and most modern equipment required to carry out world class research, teaching and innovation.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is STATSBYGG.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.