Hålogaland TeaterTromsøTED
Theatre machinery installation, upgrade and additions - Qualifying phase
The theatre will upgrade its machinery installation. The upgrade aims to ensure compliance to NS-EN 17206 and includes:Replacement of the control system for both stages. Assessment and potential reuse of existing components. Potential upgrade or addition of new axes to the existing system.
Elevators, Building Automation
No credit card · Instant access
Content at a glance
The theatre will upgrade its machinery installation. The upgrade aims to ensure compliance to NS-EN 17206 and includes:Replacement of the control system for both stages. Assessment and potential reuse of existing components. Potential upgrade or addition of new axes to the existing system.
- Tender type:
- Tender
- Contracting authority:
- Hålogaland Teater
- Published:
- March 03, 2026
- Deadline:
- March 20, 2026
- Topic:
- Elevators
- Object:
- Kultur- / Veranstaltungsgebäude
Object classification
- Kultur- / VeranstaltungsgebäudePrimary
Tender description
The theatre will upgrade its machinery installation. The upgrade aims to ensure compliance to NS-EN 17206 and includes:Replacement of the control system for both stages. Assessment and potential reuse of existing components. Potential upgrade or addition of new axes to the existing system.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
9- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
81321405 - Development of an innovative financial instrument to improve the bankability of African PtX projects, and to crowd in institutional investors from global financial hubs
The objective of this assignment is to study, design, and validate the concept of a potential investment instrument - such as a fund - that is based on a Project-Backed Security structure or a comparable financial mechanism. This instrument should be capable of incorporating a mix of financial tools, including equity, debt, and mezzanine capital, and should be tailored to support the development of a global hydrogen project ecosystem. The instrument should be designed to channel investment into a diversified portfolio of PtX projects across the value chain. To attract institutional investors and mitigate the inherent risks of large-scale infrastructure projects, the structure must be anchored in the projects' future cash flows, assets, performance and guarantees to form specific risk/return profiles. Additionally, it should aim to deliver stable, predictable returns, avoiding high volatility, and be supported by a robust financial model that clearly outlines both potential upsides and downsides. It will be critical to explore and evaluate multiple structuring options for this financial instrument and validate them through engagement with relevant stakeholders, including investors. A systematic approach shall be adopted to identify and engage investors, structure the financial mechanisms, and ensure legal and regulatory compliance. The structured instrument shall focus on a long-term lifecycle of 15-20 years to enable targeted investments across the global hydrogen value chain, enhancing both financial viability and scalability. The final concept must not only align with investor expectations for financial return and risk management but also comply with applicable capital market regulations to ensure feasibility and long-term viability. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
81321405 - Development of an innovative financial instrument to improve the bankability of African PtX projects, and to crowd in institutional investors from global financial hubs
The objective of this assignment is to study, design, and validate the concept of a potential investment instrument - such as a fund - that is based on a Project-Backed Security structure or a comparable financial mechanism. This instrument should be capable of incorporating a mix of financial tools, including equity, debt, and mezzanine capital, and should be tailored to support the development of a global hydrogen project ecosystem. The instrument should be designed to channel investment into a diversified portfolio of PtX projects across the value chain. To attract institutional investors and mitigate the inherent risks of large-scale infrastructure projects, the structure must be anchored in the projects' future cash flows, assets, performance and guarantees to form specific risk/return profiles. Additionally, it should aim to deliver stable, predictable returns, avoiding high volatility, and be supported by a robust financial model that clearly outlines both potential upsides and downsides. It will be critical to explore and evaluate multiple structuring options for this financial instrument and validate them through engagement with relevant stakeholders, including investors. A systematic approach shall be adopted to identify and engage investors, structure the financial mechanisms, and ensure legal and regulatory compliance. The structured instrument shall focus on a long-term lifecycle of 15-20 years to enable targeted investments across the global hydrogen value chain, enhancing both financial viability and scalability. The final concept must not only align with investor expectations for financial return and risk management but also comply with applicable capital market regulations to ensure feasibility and long-term viability. 81320724-Technical Assistance and Training for Demand Side Energy Consuming Enterprises and Energy Auditing Professionals
The Promotion of Renewable Energy and Energy Efficiency Programme (PREEEP) through its Skills and Market development component aims to strengthen state and private actors in their role as drivers of Market Development for Renewable Energy (RE)and Energy Efficiency (EE) in Uganda. The contractor is required to support players such as Energy Auditing Professionals, demand side energy consuming enterprises and energy managers. The support shall be in the form of training and technical assistance for access to finance as well as standardization for improving the quality of work. Through this tender, blended training shall be extended to demand side energy consuming enterprises to enable adopt energy management practices while ensuring business development growth. Operators and owners of SMEs will be trained on energy management practices and business development related aspects. The trainings are to be tailored from a baseline and needs assessment focusing on training needs and potential energy management practices that can be adopted in an SME cluster approach. Follow on support includes technical assistance inform energy audits to enable selected SMEs (through a criterion developed by GIZ PREEEP) access existing financing in the sector including PREEEP catalytic partial grant supporting implementation RE/EE measures. Further training shall be extended to energy managers from industry regarding Energy Management systems (EnMs) with reference to the ISO 50001 standard. The energy managers will be able to learn approaches for adopting EnMs to build capacity towards compliance towards any future regulatory requirements. To improve the standardization of energy audits, promote quality of audit reports in the sector, practical training shall be extended to energy auditing professionals to skill them towards developing investment grade energy audit reports. Technical assistance shall be provided in form of the development of a customized reporting framework that includes template(s) / structures and data analysis tool(s) to improve reporting and be able to develop comprehensive reports that can be used by demand side energy-consuming enterprises to seek for financing as well meet any regulatory requirements. Based on this background, GIZ PREEEP would therefore like to hire the services of a contractor to implement the different market development interventions and work packages. The contract shall coordinate with national experts to consolidate knowledge transfer and provide effectiveness of the project targeted objectives81319268-Cooperative and Short-Term Trainings and Capacity Building Measures in Ethiopia
The focus of both long-term cooperative training and short-term demand-oriented training measures would be on green, digital and social transformation and entrepreneurial skills with active involvement of the companies. The work packages are as follows, and details are available in the ToR. WP 1: Establishment of regional and sectoral implementation plans and coordination mechanisms, reflecting cooperation between public and private sector The aim of WP1 is to engage with all relevant stakeholders/actors from the public and private sector, to set up an implementation structure for all activities within this consultancy. In implementation of city administrations/regions, the (re)establishment of platforms coordinating the CT and short-term training programme implementation shall be facilitated by the contractor. If suitable, existing forums/platforms shall be used. The contractor is responsible for organising regular exchanges. The contractor shall secure the engagement of at least 30 influential large companies (champions) to ensure effective implementation of cooperative training and selection of job seekers as well as informally employed people for short-term qualification measures / trainings. WP 2: (Re)-design and developing cooperative training implementation packages in selected economic sectors Based on the selected job profiles/occupations and levels, the contractor shall support MoLS, Regional TVT bureaus, ECCSA, sectorial associations, companies and other relevant public and private stakeholders/actors to (re)design and develop Cooperative Training Programmes to TVT college trainees. The Programmes shall significantly contribute to the increased employability of trainees with an in-company training time of at least 70 %. The aim is to define training programmes, covering all relevant aspects from A to Z by incorporating green, digital and social transformation, and entrepreneurial skills for successful training, instead of focusing only on one aspect of a programme. The training programmes should utilise available resources, skills, and knowledge to an optimum. It is crucial that the designed and developed programmes are mainstreamed and serve a broad group of trainees and companies. In addition to that, the contractor shall carry out a rapid skills gap analysis and set a baseline by identifying the capacity building needs at partner TVT institutions/colleges and companies" level to facilitate the delivery of CT programmes (considering the needs on gender sensitive and inclusive teaching practices). WP 3: Implementation of cooperative training measures in selected economic sectors The aim of this work package is for at least 300 trainees (of which 150 women and 20 Persons with Disabilities) to benefit and complete the developed programmes in the cooperative training modalities, where the learning takes place in TVET colleges and the partner companies. An allocation of the total target among the selected sectors will be discussed at the beginning of the consultancy. While all relevant stakeholders need to be engaged in the implementation, trainees" allotment depends on the selected training fields/sectors and will be agreed upon at a later stage. WP 4: (Re)-design and developing labour market oriented short-term trainings materials in selected economic sectors Work package 4 aims to design and develop training materials to provide a range of skills and knowledge gaps based short term training for job seekers and informally employed people, that improves employment prospects. The contractor is expected to focus on the design and development of compressive training packages employment-oriented qualification measures. At least one measure shall be developed for each one of the target groups, namely job seekers and informally self-employed workers, women and persons with disabilities. The focus of the thematic area remains on green, digital and social transformation, entrepreneurial skills including digital entrepreneurship. The number of each target group shall be identified at the beginning of the programme in collaboration with partners and stakeholders. WP 5: Implementation of labour market oriented short-term training measures in selected economic sectors Roll-out and implementation of at least four employment qualification measures (short-term training). As mentioned above, the four chosen measures must be implemented together with a partner institution and private sector to ensure sustainability. These partner institutions shall be able to take up the training at the end of the project. To this end, the contractor should not only consider governmental institutions but also private sectors, e.g. private training providers, companies and associations or chambers. Implementation partners: MoLS, Regional TVET Bureaus, private sector companies and associations, TVET colleges and any other relevant TVET stakeholders.- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
81322848 - Development of sustainable financial instruments in Senegal
To fulfil the objective of this tender, there are four work packages (WP) that are structured according to the different instruments and tools that should be supported in the financial sector in Senegal. WP1 aims to support the readiness for a green bond issuance of up to two financial institutions (FTs). It includes supporting the FIs based on their demands and capacities, reviewing Senegal"s 2023 Sustainable Finance Framework, leading sensitization workshops, setting up work plans, ensure alignment with the regional and national green bond framework and taxonomy, identifying eligible projects, developing investor engagement strategies, and implementing capacity-building measures. The second WP aims to develop financial models for specific sectors and economic activities that are relevant in FI"s portfolio. It will support one bank in screening its project portfolio, selecting promising ideas, and developing financial models for three sectors such as eco-smart agriculture, energy efficiency, or improved water treatment. Tasks include setting up a work plan, defining eligibility criteria, conducting market research, adapting due diligence processes, designing loan products, and implementing capacity-building measures. WP3 focuses on strengthening the inclusion of ESG elements in the M&E System of the FIs. The scope of this work package will be to clarifying strategy, overall objectives and support with the drawing up of a model action plan for M&E system development and technical notes on Green Finance that can be applied to a multiplicity of Fis. Tasks include establishing a working group, designing ESG report structures, supporting the adaptation of action plans, overseeing input from member FIs, and implementing capacity-building activities. Lastly, WP4 addresses the lack of procedures to manage ESG portfolio risks in Senegal"s FIs. It involves selecting one advanced FI as a model case and developing a toolkit for assessing and managing environmental and climate-related portfolio risks. Tasks include setting up an in-house work group, analyzing the existing risk framework, developing a ESG risk model, supporting outline of compliance measures, and implementing capacity-building measures. All activities are tailored to the needs and demands for the financial sector partners. Thus, the tender also includes a potential extension of services on green and blue bonds and flexibility in the implementation is expected. All activities are to be conducted in close cooperation with the main implementing partners the financial institutions and the GIZ project team, as well as the political partner Ministry of Finance (MFB). An important criterion for the services to be provided is to cooperate with other service providers working on the implementation of the Senegalese green taxonomy and considering the work on the policy level for the cooperation with the financial institutions. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
10001623-Technical Assistance to implement gender-responsive solid waste management / circular economy and green public spaces in India
The services included in this tender contribute to the achievement of the objectives of the project "Gender in Smart Cities / Resilient Urban Development: Gender and Digital Approaches as drivers for sustainable growth and recovery in Cities" (GRC) that GIZ is implementing in India on behalf of the German Federal Ministry of Economic Cooperation and Development (BMZ), along with the political counterpart the Ministry of Housing and Urban Affairs (MoHUA). The services included in this tender are to be implemented in the cities of Guwahati in Assam and Kochi in Kerala and focuses on two urban public services: solid waste management (SWM) / circular economy (CE), and safe and green public spaces. The contractor is responsible for implementing the following 3 work packages in 2 partner cities in coordination with the GIZ team in Delhi. Work package 1 - Improving the evidence base Work package 1 aims to improve the data and knowledge base for the provision of climate-resilient municipal services. To this end, a city-wide community of practice (CoP) will be set up, comprising representatives from the municipal corporation, state departments, civil society, and the private sector, to analyze the evidence base for selected services in the areas of SWM / CE as well as safe and green public spaces, with regard to gender equality and the potential for adaptation to climate change and for reduction of greenhouse gas emissions. In Guwahati, the evidence base for green and safe public spaces must consider nature-based solutions and sponge park approaches. In Kochi, the evidence base must consider the existing Kudumbashree women groups from the Kerala government's flagship poverty eradication and women empowerment mission and the Centre for Heritage, Environment and Development (c-hed). In the process, potential problem areas with regard to evidence (e.g., reliability, completeness, acceptance by stakeholders, especially decision-makers, data quality, distortions, level of digitization, and status of gender disaggregation) will be jointly identified and prioritized. On this basis, selected evidence elements are specifically optimized with a focus on key aspects along the information and data cycle using innovative digital approaches with a view to improving the information content on gender and climate aspects (especially gender disaggregation). Decision-makers in the public service sectors are advised to analyze and formalize this qualified evidence and to use it in decision-making processes. Finally, the project promotes knowledge transfer between partner cities with cross-city CoPs in order to exchange best practices regarding evidence qualification and scale up evidence-based decision-making. Work package 2 - Development of practical models Work package 2 aims to develop models in which women and girls benefit as providers and users of improved climate-resilient municipal public services in partner cities. Based on evidence-based analyses and identified service problems, demonstration projects shall be designed and implemented in the partner cities in close cooperation between city officials, the private sector, and civil society. The demonstration projects focus both on a) improvements in key areas of SWM / CE (e.g., in selected neighborhoods or wards) and b) the enhancement of safe and green public spaces (e.g., in selected parks or green spaces). They serve as practical test environments for evidence-based improvement measures, including physical upgrades to infrastructure, organizational optimization of service processes, digital innovations to increase efficiency, and approaches to promote economic activity. A particular focus is placed on strengthening gender responsiveness and, on the other hand, on strengthening the potential for climate adaptation and resource conservation. Specific thematic focus and requirements apply for the 2 project cities Guwahati and Kochi (see full ToR document for details). Scalable practical models including investment concepts for further implementation shall be developed as well as reviewed and documented in a structured manner on the basis of success factors to be defined. The practical models shall be disseminated for further application and institutionalization through the exchange of experiences between the partner cities and with other cities. Work package 3 - Strengthening capacities Work package 3 aims to train relevant actors to improve climate-resilient municipal public services. To this end, the city officials and their departments responsible for public service provision are supported in their organizational development in line with their needs. Cooperation with NGOs and women self-help groups (SHGs) shall be promoted in order to anchor inclusive and needs-based solutions. The skills of various target groups are to be strengthened in a targeted manner: a) City and state officials receive further training (e.g., on gender-responsive service planning, climate resilience, or digital skills); b) Women working in public service provision (e.g., in municipal corporations, self-help groups, contracted companies, or the informal sector) shall receive needs-based practical training on relevant topics;. c) Women entrepreneurs shall be supported through targeted mentoring and training on business and financing models. Awareness-raising activities shall be carried out at various levels, both Households and schools. Selected training institutions shall be supported in incorporating the developed training modules into regular training programs for other cities, including a cross-city CoP. Specific thematic focus and requirements apply for the 2 project cities Guwahati and Kochi (see full ToR document for details). - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
81321664-Annual Impact Surveys of target groups
The contractor will design and implement a multi-annual mixed-methods survey and qualitative research for the ILiPS and CDRD projects in South Sudan. The services include the development, adaptation and translation of questionnaires for household surveys, including a dedicated module on women of reproductive age. The questionnaires must follow a layered design with "must-have" questions for donor reporting and project steering, "should-have" questions to ensure context-specific adaptation of core themes, and "nice-to-have" questions that can be added according to regional or cohort-specific needs. All tools are to be translated into relevant local languages and pre-tested in the field to ensure clarity and feasibility, and must be designed in a conflict-sensitive and culturally appropriate manner. Sampling must ensure representativeness at state and cohort level with a margin of error of eight percent for both state-level and displacement-strata estimates. Each beneficiary sample shall be matched by a control group of non-beneficiaries in neighbouring Payams, representing half the sample size. The contractor will apply stratified random sampling and use a digital data collection tool, preferably Survey Solutions on GIZ servers, in order to guarantee secure and efficient handling of data. Comprehensive training of enumerators, field supervision and quality assurance measures are required throughout. The contractor will carry out household surveys for each cohort at the relevant survey stage. For ILiPS, this includes midline data collection in two states in 2026. For CDRD, this includes midterm and endline data collection for the 2024 and 2025 cohorts, as well as a final endline across all states in 2028. The surveys will gather information on sustainable food production capacity, income-generating activities and diversification, household consumption patterns and nutrition, as well as the adoption of sustainable farming practices following project-supported trainings. The mixed-method approach further includes qualitative research through Focus Group Discussions and Key Informant Interviews. These serve to provide deeper insights into community perceptions of project interventions, barriers to adoption of sustainable practices, and the roles of women and youth in income generation. The qualitative findings complement the quantitative survey data by explaining why certain changes occur, identifying structural and cultural factors influencing livelihoods, and highlighting lessons for future interventions. All collected data must be cleaned, validated and analysed. The contractor is responsible for preparing analytical reports for each round of data collection, integrating both quantitative and qualitative findings. Reports shall include descriptive results, trend analyses, and clear recommendations for project management and donor decision-making. The contractor must ensure ethical data handling, compliance with the "do no harm" principle, and avoidance of structural bias. Dissemination of findings to the partner system and local stakeholders is an integral part of the assignment, ensuring that results are accessible and contribute to learning beyond project boundaries. Finally, the contractor must establish a robust operational and security plan for data collection in the fragile context of South Sudan. This includes clear timelines, staffing, coordination with GIZ and implementing partners, risk assessments, contingency planning and adherence to humanitarian security protocols. The assignment therefore requires an experienced research organisation with proven expertise in large-scale data collection in fragile contexts, strong methodological capacities, effective field presence and security systems, and experience in agricultural and food security surveys. The contractor must ensure high-quality delivery across all phases of implementation, while maintaining conflict sensitivity, context appropriateness and methodological rigour. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
81321664-Annual Impact Surveys of target groups
The contractor will design and implement a multi-annual mixed-methods survey and qualitative research for the ILiPS and CDRD projects in South Sudan. The services include the development, adaptation and translation of questionnaires for household surveys, including a dedicated module on women of reproductive age. The questionnaires must follow a layered design with "must-have" questions for donor reporting and project steering, "should-have" questions to ensure context-specific adaptation of core themes, and "nice-to-have" questions that can be added according to regional or cohort-specific needs. All tools are to be translated into relevant local languages and pre-tested in the field to ensure clarity and feasibility, and must be designed in a conflict-sensitive and culturally appropriate manner. Sampling must ensure representativeness at state and cohort level with a margin of error of eight percent for both state-level and displacement-strata estimates. Each beneficiary sample shall be matched by a control group of non-beneficiaries in neighbouring Payams, representing half the sample size. The contractor will apply stratified random sampling and use a digital data collection tool, preferably Survey Solutions on GIZ servers, in order to guarantee secure and efficient handling of data. Comprehensive training of enumerators, field supervision and quality assurance measures are required throughout. The contractor will carry out household surveys for each cohort at the relevant survey stage. For ILiPS, this includes midline data collection in two states in 2026. For CDRD, this includes midterm and endline data collection for the 2024 and 2025 cohorts, as well as a final endline across all states in 2028. The surveys will gather information on sustainable food production capacity, income-generating activities and diversification, household consumption patterns and nutrition, as well as the adoption of sustainable farming practices following project-supported trainings. The mixed-method approach further includes qualitative research through Focus Group Discussions and Key Informant Interviews. These serve to provide deeper insights into community perceptions of project interventions, barriers to adoption of sustainable practices, and the roles of women and youth in income generation. The qualitative findings complement the quantitative survey data by explaining why certain changes occur, identifying structural and cultural factors influencing livelihoods, and highlighting lessons for future interventions. All collected data must be cleaned, validated and analysed. The contractor is responsible for preparing analytical reports for each round of data collection, integrating both quantitative and qualitative findings. Reports shall include descriptive results, trend analyses, and clear recommendations for project management and donor decision-making. The contractor must ensure ethical data handling, compliance with the "do no harm" principle, and avoidance of structural bias. Dissemination of findings to the partner system and local stakeholders is an integral part of the assignment, ensuring that results are accessible and contribute to learning beyond project boundaries. Finally, the contractor must establish a robust operational and security plan for data collection in the fragile context of South Sudan. This includes clear timelines, staffing, coordination with GIZ and implementing partners, risk assessments, contingency planning and adherence to humanitarian security protocols. The assignment therefore requires an experienced research organisation with proven expertise in large-scale data collection in fragile contexts, strong methodological capacities, effective field presence and security systems, and experience in agricultural and food security surveys. The contractor must ensure high-quality delivery across all phases of implementation, while maintaining conflict sensitivity, context appropriateness and methodological rigour. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
81322848 - Development of sustainable financial instruments in Senegal
To fulfil the objective of this tender, there are four work packages (WP) that are structured according to the different instruments and tools that should be supported in the financial sector in Senegal. WP1 aims to support the readiness for a green bond issuance of up to two financial institutions (FTs). It includes supporting the FIs based on their demands and capacities, reviewing Senegal"s 2023 Sustainable Finance Framework, leading sensitization workshops, setting up work plans, ensure alignment with the regional and national green bond framework and taxonomy, identifying eligible projects, developing investor engagement strategies, and implementing capacity-building measures. The second WP aims to develop financial models for specific sectors and economic activities that are relevant in FI"s portfolio. It will support one bank in screening its project portfolio, selecting promising ideas, and developing financial models for three sectors such as eco-smart agriculture, energy efficiency, or improved water treatment. Tasks include setting up a work plan, defining eligibility criteria, conducting market research, adapting due diligence processes, designing loan products, and implementing capacity-building measures. WP3 focuses on strengthening the inclusion of ESG elements in the M&E System of the FIs. The scope of this work package will be to clarifying strategy, overall objectives and support with the drawing up of a model action plan for M&E system development and technical notes on Green Finance that can be applied to a multiplicity of Fis. Tasks include establishing a working group, designing ESG report structures, supporting the adaptation of action plans, overseeing input from member FIs, and implementing capacity-building activities. Lastly, WP4 addresses the lack of procedures to manage ESG portfolio risks in Senegal"s FIs. It involves selecting one advanced FI as a model case and developing a toolkit for assessing and managing environmental and climate-related portfolio risks. Tasks include setting up an in-house work group, analyzing the existing risk framework, developing a ESG risk model, supporting outline of compliance measures, and implementing capacity-building measures. All activities are tailored to the needs and demands for the financial sector partners. Thus, the tender also includes a potential extension of services on green and blue bonds and flexibility in the implementation is expected. All activities are to be conducted in close cooperation with the main implementing partners the financial institutions and the GIZ project team, as well as the political partner Ministry of Finance (MFB). An important criterion for the services to be provided is to cooperate with other service providers working on the implementation of the Senegalese green taxonomy and considering the work on the policy level for the cooperation with the financial institutions.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 20. März 2026.
- Who is the contracting authority?
- The contracting authority is Hålogaland Teater.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.