Temporary mechanical cleaning stage
Procurement of a module based treatment system for temporary use in Øyer municipality ́s network in order to reduce the amount and fulfil the requirements for maintenance in connection with. construction of digestion installations.
Process Technology, Water Treatment
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- ØYER KOMMUNE
- Published:
- June 01, 2026
- Deadline:
- Not specified
- Topic:
- Process Technology
Tender description
Procurement of a module based treatment system for temporary use in Øyer municipality ́s network in order to reduce the amount and fulfil the requirements for maintenance in connection with. construction of digestion installations.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock2 details capturedBidders and contractors · Address
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
91000864 General Contract For Gravsbekken Stage 2
Bærum kommuneSANDVIKADeadline: Aug 21The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network. The contract work includes the establishment of a separate system for wastewater and surface water in the upper part of the catchment area for Gravsbekken, upstream of the contract border to Gravsbekken stage 1. including the establishment of a joint ditch for several types of pipelines, where appropriate Connection to the existing pipeline network and the necessary adaptations to the completed installations in Gravsbekken stage 1Re-establishment of affected areas, including private garden areas. W-drawings showing an overview of the site belt for the entire project are attached as part of annex V02. Detailed W-drawings for each property will be submitted after the contract has been signed. Site inspection: Nadderudveien 25BDate and date: 29.06.2026, 12.00 Registration by 26.06.2026, with the number of participants.Provision of Temporary Agency Workers for the EUAA in Spain
European Union Agency for AsylumVallettaDeadline: May 26Open call procedure to conclude a single framework contract for the Provision of Temporary Agency Workers for the EUAA in SpainSupply of temporary agency workers
European Medicines Agency, MED - European Medicines AgencyAmsterdamDeadline: Jul 17The Agency considers that it may require the supply of temporary agency workers for interim assignments for general corporate, functional processes or specialised scientific/highly technical support tasks. These can be of an administrative and/or scientific/technical nature.Procurement of agreement for temporary residence - second publication
Lørenskog kommuneLørenskogDeadline: Aug 17The procurement of a contract for temporary residences for persons with substance abuse problems, mental or other challenges.NCH - Temporary Warehousing/Storage Tender
National Paediatric Hospital Development BoardDublinTemporary warehouse storage floor space (not racking) required for the NCH.Stage machinery Studioscenen
Dansens Hus ASOsloDeadline: May 29The tender contest is for the replacement of the upper stage machinery at Studioscenen at Dansens hus in Oslo, according to the Technical Specification. The current system is nearing the end of its lifetime. In addition, the system is limited in functionality, lacks positioning and load monitoring, and does not meet the current security requirements. Other targets for the upgrade include: * Several options/points for suspension. * Simple changes and shorter restructuring time between productions. * Better working environment. It shall not be necessary to use a lift to move hoists or suspension points. * Possibilities for movement during performances. The project consists of two parts: 1. Construction work consisting primarily of changes to the steel structure in the roof as well as moving building technical installations. 2. Engineering design, production and installation of the stage machinery. Each project part is a turnkey contract where the turnkey contractor has the full responsibility for engineering design, planning, production, installation, testing, training and documentation. This competition is for project part 2, delivery of the stage machinery. The planned solution is based on a system with traditional stage features with the addition of point stretches. There will be up to 16 stage covers, 2 side covers and 4 courts for a variable number of concentrated stretches. The pulley rods are to be carried by four steel wires or steel band. A steel construction dedicated to the stage machinery will be installed by another contractor. The existing HEA beams will be disassembled. Eight new beams will be assembled in the hall ́s longitudinal direction, placed so that four are used for stage stretches and four for concentrated stretches and/or other temporary equipment. The machinery will be located above the balcony on one side of the stage. A dividing wall will be set up to create an engine room and screen for sound between the winches and the stage. The entire system, including the pulleys and control system with security functions, shall be constructed in accordance with the norm NO-EN 17206 "Event technology, machinery for stages and other production areas, Safety requirements and inspections". The installation shall fulfil relevant EU directives, including directives for machines, low voltage and EMC. A comprehensive description of the delivery is in annex 1095-922 "Technical Specifications".Project 1314901 Ila Prison, temporary barracks (K201)
STATSBYGGOSLODeadline: Jun 22Statsbygg requests tender offers for hire of modular buildings for temporary barracks at Ila Prison (project K201).Cleaning, Imaging and Analysis of Sewer Pipes
Veitur ohf.ReykjavikDeadline: Sep 03Here is the translation: The service covers work on projects within the Purchaser's sewer system: -Wastewater (stormwater and sewage) The service covers, in whole or in part, work on the following tasks: -Cleaning of sewer pipes and manholes -Imaging of sewer pipes and manholes -Condition assessment of sewer pipes and manholes -Cleaning at treatment plants -Cleaning at pumping stations and pump wells -Cleaning of settling tanks -Cleaning at pumping and treatment stations -Sludge disposal -Operation of pump and cleaning vehicles -Cleaning of street drains -Cleaning and/or replacement of drain grates The contractor's responsibilities include, but are not limited to, the following: -Preparatory work for service delivery, e.g. review of drawings and specifications -Contractor's internal project management -Site supervision -Contractor's internal quality control -All other necessary support functions in relation to the work to be performed -Safety measures -Operation and use of necessary IT systems to ensure traceability of all work The following services are not within the scope of the framework agreement: -Maintenance of equipment at pumping and treatment stations -Installation of new equipment at pumping and treatment stations -Pipe laying worksHRB 2026 - Provision of Temporary Agency Resources
The Health Research BoardDublinDeadline: Jun 16The Health Research Board, herein after referred to as the “HRB” or the “Contracting Authority”, is the authority responsible for this procurement. The Health Research Board (HRB) (www.hrb.ie) is a statutory agency under the aegis of the Department of Health. The HRB’s mission is to support research that improves people's health, promotes evidence-informed care and creates solutions to societal challenges. Our vison is ‘better health through excellent research, data and evidence’. The HRB oversees an approximate €50 million investment in health research activity each year. The scope of the Framework Agreement is for the provision of agency workers to the Client to fill certain temporary resource requirements. Tenderers should refer to Section 3 of the RFT for a detailed description of the scope.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is ØYER KOMMUNE.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.