New: market reports on German public procurement Read the report

Ministry of sportsSkopjeTED

Supply and installation of sports and urban equipment for the renovation of neighborhood multi-purpose playgrounds

Supply and installation of sports and urban equipment for the renovation of neighborhood multi-purpose playgrounds 1.Construction/application of acrylic resin as a base layer in 1 coat with a minimum thickness of 1 mm for a sports field. m2 1 2.Supply, transport, and installation of artificial football turf. Pile height: 50 mm. m2 1 3.Sup...

Submission deadline: June 29, 2026 (expired)Type: Tender
Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
Ministry of sports
Published:
May 27, 2026
Deadline:
June 29, 2026

Tender description

Show full description

Supply and installation of sports and urban equipment for the renovation of neighborhood multi-purpose playgrounds 1.Construction/application of acrylic resin as a base layer in 1 coat with a minimum thickness of 1 mm for a sports field. m2 1 2.Supply, transport, and installation of artificial football turf. Pile height: 50 mm. m2 1 3.Supply, transport, and installation of artificial football turf. Pile height: 40 mm. m2 1 4.Supply, transport, and installation of artificial football turf. Pile height: 30 mm. m2 1 5.Supply, transport, and installation of artificial football turf. Pile height: 20 mm. m2 1 6.Supply, transport, and installation of expansion strips for polypropylene modular flooring with a thickness from 8 mm to 22 mm and width from 30 mm to 90 mm for sports fields, UV-stabilized and wear-resistant, in a color selected by the investor. m 1 7.Supply, transport, and installation of polypropylene modular flooring with a thickness from 8 mm to 22 mm for sports fields, UV-stabilized and wear-resistant, in a color selected by the investor. m2 1 8.Supply, transport, and installation of purpose-made cast rubber with machine application of a mixture of SBR granules and polyurethane, with a thickness of 5 mm. The installed materials must be safe for human health and the environment. m2 1 9.Supply, transport, and filling/application of SBR rubber granules. m3 1 10.Supply and installation/application of quartz sand with granulation from 0.4 mm to 0.8 mm. m3 1 11.Supply and bonding using special two-component polyurethane adhesive for concrete or asphalt. Consumption: 1 kg/m². m2 1 12.Supply and bonding using special two-component polyurethane adhesive for concrete or asphalt. Consumption: 0.2 kg/m¹. m 1 13.Supply and installation of sand/gravel without mud and dust for children’s playgrounds, gray-white in color. m3 1 14.Supply, transport, and installation of purpose-made cast rubber flooring with a mixture of EPDM rubber granules and polyurethane in a layer from 1 mm to 3 mm, in a color selected by the investor. m2 1 15.Smoothing of concrete slab/screed using a power trowel (“helicopter”). m2 1 16.Milling/scraping of damaged asphalt or concrete up to 3 mm using a machine. m2 1 17.Construction/execution of screed with thickness d = 10 cm. m2 1 18.Construction/execution of screed with thickness d = 5 cm m2 1 19.Concreting of floor slab with thickness d = 10 cm using MB20 concrete, including formwork installation. m2 1 20.Supply and installation of ribbed and smooth reinforcement bars up to Ø12 mm. kg 1 21.Rolling/compaction of the base layer. m2 1 22.Base course installation in a 10 cm layer using crushed stone 0–40 mm with required compaction. m2 1 23.Marking/lining of a (standard) 80 m tennis court on concrete and acrylic surface (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 24.Marking/lining of a (standard) 80 m volleyball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 25.Marking/lining of a (standard) 100 m handball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 26.Marking/lining of a (standard) 120 m football field (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 27.Marking/lining of a (standard) 120 m basketball court (shade/color selected by the Investor) with line thickness of 50 mm. Lump sum 1 28.Painting of sports equipment in a shade/color selected by the investor. m2 1 29.Concreting of footing bases with MB20 concrete for sports equipment. m3 1 30.Manual excavation of soil for concreting footing bases for sports courts/playgrounds. m3 1 31.Supply and installation of steel elements for sports courts/playgrounds and other purposes. kg 1 32.Supply and installation of processed planed white pine boards with minimum thickness d = 15 mm for sports equipment and other elements. m2 1 33.Supply and installation of processed planed pine boards with minimum thickness d = 15 mm for sports equipment and other elements. m2 1 34.Supply and installation of standard tennis net with mesh opening max. 4 × 4 cm and rope thickness min. 2''. piece 1 35.Supply and installation of standard volleyball net with mesh opening max. 20 × 20 cm and rope thickness min. 2''. piece 1 36.Supply and installation of rubber shock absorbers between the metal frame and the glass basketball backboard. kg 1 37.Supply and installation of standard basketball hoop net (mesh) with 12 loops/openings. piece 1 38.Supply and installation of hinged basketball rim for basketball structure with spring mechanism, 4 bolts, and minimum diameter of 45 cm. piece 1 39.Supply and installation of standard steel rims for basketball structure complete with 4 bolts and minimum diameter of 45 cm. piece 1 40.Supply and installation of new standard basketball backboards made of polycarbonate, minimum thickness d = 8 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 41.Supply and installation of new standard basketball backboards made of plexiglass, minimum thickness d = 8 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 42.Supply and installation of new standard basketball backboards made of perforated sheet metal, minimum thickness d = 3 mm, with minimum dimensions 1.8 m × 1.05 m. piece 1 43.Supply and installation of new standard basketball backboards made of tempered glass, minimum thickness d = 8 mm, with dimensions 1.8 m × 1.05 m. piece 1 44.Supply and installation of new standard basketball backboards made of polyester, with minimum dimensions 1.8 m × 1.05 m and minimum thickness d = 3 mm. piece 1 45.Supply and installation of protective net behind goals with mesh openings max. 20 × 20 cm and rope thickness min. 2'', edged with tensioning rope. m2 1

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

6 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

No direct alternatives are currently listed. Activate search to automatically receive new matching notices.

Unlock advanced search

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 29. Juni 2026.
Who is the contracting authority?
The contracting authority is Ministry of sports.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Discover more tenders

Next step

Get full access to this tender

Access all documents for "Supply and installation of sports and urban equipment for the renovation of neighborhood multi-purpose playgrounds" from Ministry of sports and keep track of deadlines and submission guidelines.

Deadline tracked until June 29, 2026No credit card required