Kilkenny County Council_1185KilkennyTED
South North Access Road Archaeological Consultant Services Stages I-IV
Archaeological Consultant Services Stages I-IV for the South North Access Road, including erection of permanent fencing to the site perimeter. The successful contractor will be appointed as the PSCS for the duration of the archaeological works.
Environmental Assessment
No credit card · Instant access
Content at a glance
Archaeological Consultant Services Stages I-IV for the South North Access Road, including erection of permanent fencing to the site perimeter. The successful contractor will be appointed as the PSCS for the duration of the archaeological works.
- Tender type:
- Tender
- Contracting authority:
- Kilkenny County Council_1185
- Published:
- May 25, 2026
- Deadline:
- June 19, 2026
- Topic:
- Environmental Assessment
Tender description
Archaeological Consultant Services Stages I-IV for the South North Access Road, including erection of permanent fencing to the site perimeter. The successful contractor will be appointed as the PSCS for the duration of the archaeological works.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- Galway County CouncilGalwayDeadline: Jun 15
Archaeological Services Contract Stage (i) to (iv)
Archaeological Services Contract Stage (i) to (iv) for the N59 Maam Cross to Oughterard Road Scheme Phase 2: Bunnakill to Claremount, Co. Galway. - Galway County CouncilGalwayDeadline: Jun 19
Archaeological Services Contract Stage (i) to (iv)
Archaeological services contract stages (i) to (iv) for N59 Maam Cross to Oughterard Road Scheme Phase 2: Bunakill to Claremount, Co Galway. - Leitrim County Council_2136LeitrimDeadline: Jul 27
R289 Kilcoon Road Realignment - Dromahair Co. Leitrim
The project aims to develop a comprehensive design for the delivery of excavating, realigning, and replacing the existing carriageway. It involves cutting in the existing upper embankment, strengthening the road embankment and pavement, and the installation of a VRS along the outside of the bend where the road section is situated on a steep slope and is showing structural cracks due to slope-side movement. The graded slope should be planted to improve the aesthetic appeal of the road section and to allow it to blend cohesively with the surrounding landscape. The construction of the realignment and remediation works of the slope are to be phased to minimise disruption to travel along the route. Construction will be carried out with the aim to keep one lane operational for the majority of the period of works. Stakeholder engagement, including workshops with key entities such as TII will be a critical component to ensure alignment with broader infrastructure goals. Ultimately, this initiative seeks to enhance road stability and safety, while also minimising disruption to traffic flow and impact on the environment. Works will include the following: • Fencing / Gates / Barriers • Site Clearance • Landscaping • Earthworks • Road Construction • Signage • Drainage • Vehicle Restraint System • Civils works to facilitate above - IDA IrelandDublin
Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services for Road Infrastructure and associated services at IDA Ballina
The Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Planner, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover. - Dansens Hus ASOsloDeadline: May 29
Stage machinery Studioscenen
The tender contest is for the replacement of the upper stage machinery at Studioscenen at Dansens hus in Oslo, according to the Technical Specification. The current system is nearing the end of its lifetime. In addition, the system is limited in functionality, lacks positioning and load monitoring, and does not meet the current security requirements. Other targets for the upgrade include: * Several options/points for suspension. * Simple changes and shorter restructuring time between productions. * Better working environment. It shall not be necessary to use a lift to move hoists or suspension points. * Possibilities for movement during performances. The project consists of two parts: 1. Construction work consisting primarily of changes to the steel structure in the roof as well as moving building technical installations. 2. Engineering design, production and installation of the stage machinery. Each project part is a turnkey contract where the turnkey contractor has the full responsibility for engineering design, planning, production, installation, testing, training and documentation. This competition is for project part 2, delivery of the stage machinery. The planned solution is based on a system with traditional stage features with the addition of point stretches. There will be up to 16 stage covers, 2 side covers and 4 courts for a variable number of concentrated stretches. The pulley rods are to be carried by four steel wires or steel band. A steel construction dedicated to the stage machinery will be installed by another contractor. The existing HEA beams will be disassembled. Eight new beams will be assembled in the hall ́s longitudinal direction, placed so that four are used for stage stretches and four for concentrated stretches and/or other temporary equipment. The machinery will be located above the balcony on one side of the stage. A dividing wall will be set up to create an engine room and screen for sound between the winches and the stage. The entire system, including the pulleys and control system with security functions, shall be constructed in accordance with the norm NO-EN 17206 "Event technology, machinery for stages and other production areas, Safety requirements and inspections". The installation shall fulfil relevant EU directives, including directives for machines, low voltage and EMC. A comprehensive description of the delivery is in annex 1095-922 "Technical Specifications". - Donegal County Council_1193LiffordDeadline: Aug 23
Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal
The Client invites tenders to undertake the Design, specification, procurement, supervision and overall project management of the following proposed works including but not limited to; Construction of a municipal cemetery to include burial space for approximately 2,500 plots; memorial garden to include repositories / columbarium for ashes; reception/office admin building tbc; memorial service building with public toilets incl. connection to public mains alternatively on site treatment; maintenance/operations/storage building and service yard; roof mounted solar panels on any buildings constructed where feasible, on site parking provision; and all associated landscaping and drainage works including storm water attenuation. Vehicular access and egress to the cemetery will be from Leck Road via a new entrance to the site. Pedestrian/cycle connection and integration with the new Southern Network Roads project. The project requires the services of a design team with appropriate previous experience to lead the project through the five stages of the Capital Works Management Framework to develop the site - Kinn kommuneMåløy
Albertatunet K2 -Sealed house, fixed fixtures including technical disciplines and outside work.
Kinn municipality would like to enter into a contract with a contractor for dense building and fitting works, including technical disciplines, as well as outdoor work for the planned welfare building, Albertatunet. In addition reconstruction of roads including electro and W&S works around Albertatunet shall also be carried out in this contract. Albertatunet is a planned welfare building in the centre of Florø, which shall contain 100 institution sites, a new base for the home care services, emergency doctor surgery, day activity shelter as well as training/rehabilitation premises and cafè. There will be a workplace for a total of 150-200 employees, and the building shall be designed in accordance with husbanken ́s requirements for institution sites and day activities. The construction project shall be carried out in two subsequent execution contracts K1 and K2, as well as K3 and K4 that transport contracts according to the following division: - K1: Ground works, water and sewage works, frameworks including foundations (ongoing) - K2: Sealed houses and fixtures (fixed), technical disciplines and outdoor work + road works. - K3: Back-up power supply (shall be transported to K2) - K4: Lifts (shall be transported to K2) Mobile fixtures and equipment are divided into several procurements in later phases. - IDA IrelandDublinDeadline: Aug 21
IDA Belview Infrastructure Development, Belview, Slieverue, County Kilkenny
The CfT is Stage 1 of a Restricted Two Stage Tender Process. The Contracting Authority is looking to shortlist suitable candidates to act as the Main Contractor for this development. Documents being provided at this stage are the Suitability Assessment Questionnaire Documents. The proposed Works consist of upgrade works to the local road L3412 and ancillary site development works which will provide access to the IDA Ireland land bank at Kilmurry, Slieverue and Gorteen, Belview, Co. Kilkenny. The proposal will provide an upgrade of local road L3412 from the existing eastern IDA Ireland roundabout to the new IDA Ireland land bank at Kilmurray and will tie back into the existing L3412 to the west via a new roundabout. The upgrade will be taken online on the existing road and offline on adjoining land. - Metroselskabet I/SKøbenhavn SDeadline: Aug 25
Copenhagen - New Metroline, M5 Civil Works South
This tender presents a substantial opportunity for prospective contractors to bid for the M5 Civil Works South (CWS) package, an important component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but also extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is designed to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. MAIN COMPONENTS OF THE M5 CIVIL WORK The M5 south consists of approx 6.5 km twin bored tunnels, 5 underground stations(incl. 3 transfer stations),2 underground crossovers,5 cross passages,1 ramp, approx 2.0 km viaduct,1 elevated station, 1 viaduct cross-over,1 elevated bifurcation, short embankment sections. For further details on scope ref. is made to M5-2.1-CMBS-SW and M5-2.2-CWS-SW PHASES: The current tender, Phase 1, encompasses the southern section of the line, from north-west of København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes phase 2 north of v/Prags Boulevard to Lynetteholm opening in 2045 and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. Phase 2 is not included in this tender. CONTRACT SPLIT OF M5: The M5 project as a whole consists of several contracts: • M5 Civil Works South (this contract) • M5 Transportation System South contract (tendered out as a separate contract in parallel with M5 Civil Works South) • Operation and Maintenance South contract (will be tendered out at a later stage) • Enabling Works contracts, e.g. relocation of utilities, relocation works at Kh etc. (enabling works will be tendered out in separate contracts) • Station and Shaft areas (will be tendered out at a later stage) • Canopy contracts (will be tendered out at a later stage). CONTRACT The contract is structured as a design & build contract under ABT18 terms, placing comprehensive responsibility for both design and execution upon the Contractor. This two-phase approach—design followed by execution—is a standard framework for complex infrastructure projects. An extensive market dialogue has been carried out before issuing the tender. The purpose of the market dialogue was to learn from the market what would constitute an attractive contract. Metroselskabet I/S is grateful for all the potential tenderers who took their time to participate in the dialogue and those provided input. INDICATIVE TIMESCHEDULE FOR THE PROCUREMENT Issue of invitation to tender September 29 2026 Launch meeting (individual meetings) October 27 – 29 2026 Deadline for submission of initial tender (submission 1): December 15. 2026 at 14:00 (local Danish time) Negotiation meetings January 4. – April 24 2027 Issue of addendum to tender documents May 4 2027 Deadline for submission of revised tender 1 July 26-28 2027 Negotiation meetings August 23-25 2027 Deadline for submission of revised tender 2 October 4-6 2027 Negotiation meetings October 19-21 2027 Deadline for submission of revised tender 3 November 9-11 2027 Notification of award decision December 20 2027 Expiry of standstill period December 30 2027 Signing of Contract Agreement February 2028 The time-schedule may be subject to change. Changes to the timeschedule will be made available in Byggeprojekt.dk. - Dublin City CouncilDublinDeadline: Jun 22
Multi-Party Framework Agreement for Works Contractors on foot of an initial call-off contract for Refurbishment Works at 81-83 North Circular Road, Dublin 7.
Multi-party framework agreement for works contractors to carry out investigations, repairs, retrofit, refurbishment, renewal, and adaptive reuse of Dublin City Council properties as housing. Initial call-off for refurbishment at 81-83 North Circular Road, Dublin 7. Project pipeline of c. 10 buildings, including protected structures, for homeless accommodation, shared living, and social housing. Standalone enabling/investigation works may be required. Subject to funding.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 19. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Kilkenny County Council_1185.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.