DB Projekt Stuttgart-Ulm GmbH (Bukr 5S)StuttgartTED
S21, PA 1.7, Oberbau/KBT/Konstr Ingbau Stuttgart Bad Cannstatt
S21, PA 1.7, Oberbau/KBT/Konstr Ingbau Stuttgart Bad Cannstatt
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- DB Projekt Stuttgart-Ulm GmbH (Bukr 5S)
- Published:
- August 30, 2026
- Deadline:
- Not specified
- Object:
- Bahngleis / Schienenstrecke
Object classification
- Bahngleis / SchienenstreckePrimary
Tender description
S21, PA 1.7, Oberbau/KBT/Konstr Ingbau Stuttgart Bad Cannstatt
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
91N2320-1 Herstellung einer Spitzenüberspannung sowie Teilüberspannung von 4 Gleise
Niedersachsen Ports GmbH & Co. KGEmdenDeadline: Sep 23Erweiterung der bestehenden Oberleitungsanlage (OLA) auf den Hafenbahngleisen der Niedersachsen Ports GmbH & Co. KG Niederlassung Brake (NPorts) als Spitzenüberspannung sowie eine Teilüberspannung von 4 Gleisen (2 je Vorstellgruppe).Region Mitte
Deutsche Bahn AG Konzernleitung (Bukr 10)BerlinAußenbahnsteige der Kat. 3-7 als komplette Bauleistung (z.B. Ersatz, Neubau, Verlängerung) einschließlich techn. Ausrüstung Leistungen: ▪Konventioneller Bahnsteig ▪Bahnsteigausstattung ▪Wegeleiteinrichtungen ▪Wetterschutz ▪Zuwegung ▪techn. Ausrüstung (Elt, ITK) Bauteile: ▪55er, 76er & 96er Bstg-Kanten ▪Beläge inkl. Bettung ▪Winkelstützelemente ▪Holm-/Füllstabgeländer ▪Fundamente ▪Schächte ▪Leitungen, Leerrohre ▪Abfallbehälter, Ascher, Vitrinen, Beschilderung, Uhren ▪Dynam. Schriftanzeiger und ZI, Beschallung (durch AG beigestellt, Montageleistungen sind enthalten) ▪Beleuchtungsmasten mit Kabeln, AVT ▪Erd- und Abbrucharbeiten mit Entsorgung NICHT enthaltene Leistungen: ▪Ausführungsplanungsleistungen ▪Anlagen PÜ + PU inkl. Zugangstreppen ▪Bahnsteigdächer ▪Anlagen Fördertechnik ▪Gleisfeldbeleuchtung ▪Weichenheizung ▪Empfangsgebäude ▪Bahnstromanlagen / OLA (DB Netz AG) ▪Anlagen Leit-und Sicherungstechnik (DB Netz AG) ▪Anlagen (DB Energie GmbH)Bf. & Vst. Fangschleuse - VP3 Neubau Bahnhof und Verkehrsstation Fangschleuse
DB Netz AG (Bukr 16)Frankfurt am MainDie Vergabe umfasst die Hauptbauleistungen für die Projekte "Bahnhof Fangschleuse" und "Verkehrsstation Fangschleuse". Die Projekte umfassen insbesondere die Verschiebung der Verkehrsstation Fangschleuse und den Neubau in westlich verschobener Lage sowie den Ausbau des Bahnhofs durch die Errichtung von 5 Bahnhofsgleisen mit 740 m Nutzlänge, 2 Überholgleisen mit 740 m Nutzlänge, 2 Lokauszieh-, 2 Lokwartegleise mit ca. 18 km Gleisanlagen und Oberleitung, ca. 55 Weichen und dem Neubau eines ESTW-A.VKP München; Ausbau des bauzeitlichen Zuganges U4/U5
DB InfraGO AG – Geschäftsbereich Personenbahnhöfe (Bukr 11)BerlinDeadline: Oct 01Im Rahmen des Umbaus des Verkehrsknotenpunkts München wird ein bauzeitlicher Zugang zu der U-Bahnlinie U4/U5 erstellt, um die Personenströme nicht zu beeinträchtigen. Gegenstand der Ausschreibung ist nach Fertigstellung des Rohbaus der Ausbau und der Ausbau des technischen Gebäudeausrüstung des Zugangs.TII424: OCS Works Framework Agreement
Transport Infrastructure Ireland (TII)DublinTII intends to enter into a Single Party Framework Agreement for renewals (Overhead Contact System) on the Luas light rail system. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis. The Call-Off Contracts, when issued, will typically be for the purposes of carrying out the following activities:1. Design, supply, installation, testing and commissioning of any Overhead Contact System asset renewals, upgrades or new works. It shall include developing a detailed construction design associated with the various work elements of the Overhead Contact System installations on Luas 2. Developing the specific programme of works, 3. Developing the specific methodology – location based, 4. Developing the Traffic Management design – to be approved by the relevant Local Authority, TII and the Luas Operator, 5. Interface with Luas Operator and Maintainer as required, 6. Carrying out all the necessary works as specified for the Overhead Contact System and/or associated equipment and installations on Luas. Those works will include all preparatory works and all closing out works to make good the affected assets, 7. Production of the Safety File, 8. Supply of materials including contact wire and overhead system components and tooling e.g. Section insulators, cabling, fixings, poles, track interfacing equipment, sealants/grouts and materials used for works on or near the Luas system, and 9. Any other associated works required by the Client; including work on overhead contact system and traction power related equipment such as overhead contact system elements, cabling including traction cables, earthing and bonding systems (e.g. VLDs etc), installation, purchase, interventions of similar equipment, work on on-track-plant, supply of and interventions on tooling, interventions on overhead contact systems such as replacing contact wire, adjusting overhead support systems, work on supporting systems and additional items on surrounding building such as poles and building supports and all works on or near Luas OHLE (Overhead line equipment) asset group, 10. Provide a handover file and as-built drawings in accordance with TII requirements . 11. Carrying out the duties of PSDP and PSCS for all Call off Contracts. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Pre-qualification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarations made in the response to the ESPD/IMPQQ.ABS Berlin - Frankfurt/Oder - Grenze D/PL, PA 16, Bahnhof Köpenick inkl. S3 Ost
DB Netz AG (Bukr 16)Frankfurt MainBauhauptleistungen; Oberbau, Tiefbau, OLA, Konstruktiver Ingenieurbau, Kabeltiefbau, E-Technick/50Hz, Bahnenergieanlagen, S-Bahnstromanlagen, LST, TKLeistungen zur Oberbauinstandsetzung in Gleisen/Weichen der DB InfraGO AG - 2. Vergabewelle
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)Frankfurt MainDeadline: Nov 06Kleine Oberbauinstandsetzung (Instandsetzung Gleise und Weichen). Diese umfasst die Behandlung von Kleineisen, Schwellenwechsel, Spurberichtigung, Stoßlückengleis, Bettungserneuerung, Randwegarbeiten, Schienenwechsel, Schwellenaufbereitung in Gleisen UND Weichen sowie der der Tausch von Weichengroßteile, Spannungsausgleich in Gleisen und Weichen, Begleitarbeiten, Logistik. Gleise Schienenauszugsvor-richtung, Fang Schutzschienen, Weichen Kleineisen.Leistungen zur Oberbauinstandsetzung in Gleisen/Weichen der DB InfraGO AG - 3. Vergabewelle
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)Frankfurt MainDeadline: Nov 23Kleine Oberbauinstandsetzung (Instandsetzung Gleise und Weichen). Diese umfasst die Behandlung von Kleineisen, Schwellenwechsel, Spurberichtigung, Stoßlückengleis, Bettungserneuerung, Randwegarbeiten, Schienenwechsel, Schwellenaufbereitung in Gleisen UND Weichen sowie der der Tausch von Weichengroßteile, Spannungsausgleich in Gleisen und Weichen, Begleitarbeiten, Logistik. Gleise Schienenauszugsvorrichtung, Fang Schutzschienen, Weichen Kleineisen.AN Laufenburg, Strecke 4000, Elektrifizierung und Ausbau der Hochrheinbahn
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)Frankfurt MainElektrifizierung und Ausbau Hochrheinbahn Basel Bad. Bahnhof - Erzingen, Strecke 4000 km 271,300 - 344,875 Mit dem Projekt soll der gesamte Abschnitt zwischen Basel und Erzingen durchgehend elektrifiziert und das Angebot im Schienenpersonennahverkehr (SPNV) erweitert werden. Auf dem gesamten Verlauf des Projektes werden fast alle bestehenden Verkehrsstationen ertüchtigt und drei neue Verkehrshalte erstellt. Zusätzlich sind Zusammenhangs- und Ausgleichsmaßnahmen erforderlich. Gegenstand dieser Ausschreibung ist die Bauleistung Verkehrsstation Laufenburg, der Rappensteintunnel, Anpassungen an SÜ´en und der EÜ´en sowie Oberbauarbeiten.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is DB Projekt Stuttgart-Ulm GmbH (Bukr 5S).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.