Raidió Teilifís Éireann ( RTÉ )DublinTED
RTÉ Energy, Environmental and GHG Consultancy Services
Raidió Teilifís Éireann (RTÉ), Ireland’s national public-service media organisation, invites tenders from suitably qualified consultancies to provide expert services in greenhouse gas (GHG) emissions reporting, energy management, and environmental certification. RTÉ is a designated Public Body under SEAI’s Monitoring and Reporting (M/R) f...
Energy Consulting
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Raidió Teilifís Éireann ( RTÉ )
- Published:
- July 22, 2026
- Deadline:
- Not specified
- Topic:
- Energy Consulting
Tender description
Show full descriptionCollapse description
Raidió Teilifís Éireann (RTÉ), Ireland’s national public-service media organisation, invites tenders from suitably qualified consultancies to provide expert services in greenhouse gas (GHG) emissions reporting, energy management, and environmental certification. RTÉ is a designated Public Body under SEAI’s Monitoring and Reporting (M/R) framework and is progressing its decarbonisation strategy in line with national and EU obligations, including the VSME framework and Ireland’s Climate Action Mandate. The appointed consultant will strengthen RTÉ’s environmental governance, compliance, and reporting processes under SEAI, ISO 50001, ISO 14001, and VSME aligned standards. All technical capabilities must be managed by the Tenderer at the time of tender submission and remain under the Tenderer’s direct contractual and managerial control for the duration of the framework.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
6Framework for Engineering and Environmental Consultancy Services
Inland Fisheries IrelandDublinDeadline: Sep 11IFI’s NBMP is establishing a multi-operator Framework Agreement(s) for the procurement of Engineering and Environmental Consultancy Services. The Framework Agreement(s) will establish the terms governing contracts to be awarded during the specified time period, with regards to price and capability to provide the service required. The Framework(s) will be for Engineering Consultancy and Design Services as outlined below; • Lot 1 – Civil/Structural/Hydraulic Engineering Services • Lot 2 – Environmental/Ecological Services • Lot 3 – Integrated Consultancy Services (less than 350K) • Lot 4 – Integrated Consultancy Services (more than €350K)RTÉ Telephony Services
Raidió Teilifís Éireann ( RTÉ )DublinDeadline: Aug 31RTÉ intends to award a contract for the provision of fixed line and telephony services. This is a repeat tender and these services have been procured under previous tenders and contracts. The sum specified indicates the scale of the expenditure for the full five year term, it is not an annual cost.Rahan Flood Relief Scheme — Engineering and Environmental Consultancy Services
Offaly County Council_448TullamoreDeadline: Sep 18Offaly County Council invites tenders for engineering and environmental consultancy services for the Rahan Flood Relief Scheme at Tullybeg, Rahan, County Offaly, on the River Clodiagh. The Scheme comprises approximately 430 metres of reinforced concrete flood defence wall along the right bank of the River Clodiagh, with embankment at the tie-in points, protecting residential properties and the wastewater treatment plant to the 1 percent AEP fluvial standard. The commission covers Stage (ii) statutory consent and detailed design, Stage (iv) construction-stage services and Stage (v) handover and defects period, under the Capital Works Management Framework. The construction works will be delivered by Office of Public Works direct labour; procurement of a works contractor is not included in this commission. The services include detailed design, hydrological and hydraulic modelling, ground investigation specification and interpretation, review and validation of the completed EIA and Appropriate Assessment screening, statutory consent documentation for approval under Part 8, works package preparation for direct labour delivery, Project Supervisor Design Process duties, construction-stage technical support and design authority, and handover documentation. The Scheme is funded by the Office of Public Works.Engineering and Environmental Services for Barrier Mitigation Programme LyreLane Bundle
Inland Fisheries IrelandDublinDeadline: Aug 24Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of 2 proposed Barrier Mitigation Projects, Lyre Bridge and Glenshelane Weir in County Waterford, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environmental and planning services required to progress the project through feasibility, option selection, and statutory consent stages in accordance with the Planning and Development Acts 2000–2023, the Capital Works Management Framework, and Infrastructure Guidelines 2023. The Barrier Mitigation Projects aim to mitigate the impacts of the identified barriers on fish passage and restore more natural river processes along the associated rivers. The commission forms a specific action under Ireland’s Water Action Plan 2024 and supports implementation of the National Barrier Mitigation Programme to deliver improved ecological status under the EU Water Framework Directive. The Consultant will act as the Designer, Project Supervisor Design Process during all Phases of the project and carry out all related necessary duties.Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Tipperary County CouncilClonmel, NenaghDeadline: Aug 19The OPW, working with Tipperary County Council, identified Nenagh as an Area for Further Assessment in the Shannon CFRAM Study. A flood relief scheme is to be developed. Tipperary County Council intends to commission a Consultant to progress Engineering and Environmental elements of the Tender Specification. The objective is the identification, design and submission for planning consent of a Flood Relief Scheme to alleviate flood risk in Nenagh, complete detailed design, and procure, manage and oversee construction.Environmental and Social Consulting Services for E&S Experts
KfW BankengruppeFrankfurt am MainDeadline: Sep 21KfW’s Environmental and Social Experts (formerly KCUS and regional E&S experts) provides services in the field of environmental and social sustainability for KfW Development Bank, KfW IPEX-Bank and other business units of KfW. The objective of this tender is to establish a framework agreement with three environmental and social consultancy firms (Consultants) to provide expert services required by the E&S Experts as the case may be. The Consultants will perform the tendered services on the basis of single assignments. E&S will either allocate them on the basis of a cascade-system if the services to be executed are standard tasks or by awarding them on grounds of a mini-competition between the three Consultants if the services to be performed are non-standard tasks. Both procedures are described in detail in the Framework Agreement. KfW has planned that the required max. number of person-days required during the entire term of the framework agreement is estimated to amount to 1710.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Raidió Teilifís Éireann ( RTÉ ).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.