Environmental Protection AgencyWexfordTED
Provision of Air Emissions Monitoring Programme (AEMP) of air emission compliance monitoring at selected EPA licensed sites in Ireland
Licensed operators are required to carry out programmes of self-monitoring, and to report the results to the Office of Environmental Enforcement (OEE). As part of its regulatory functions, the OEE carries out an annual programme of independent monitoring to assess the reliability of operators’ self-monitoring and to provide public confide...
Environmental Assessment
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Environmental Protection Agency
- Published:
- August 27, 2026
- Deadline:
- September 23, 2026
- Topic:
- Environmental Assessment
Tender description
Licensed operators are required to carry out programmes of self-monitoring, and to report the results to the Office of Environmental Enforcement (OEE). As part of its regulatory functions, the OEE carries out an annual programme of independent monitoring to assess the reliability of operators’ self-monitoring and to provide public confidence. The EPA wishes to procure, by means of a competitive tender, the programme of independent air emissions monitoring for the period 2027 - 2029.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10SPU CO78-2026 - Provision of Scientific and Technical Support to NPWS for the Conservation, Restoration and Monitoring of Blanket Bogs
Department of Housing Local Government and HeritageWexfordDeadline: Sep 03Provision of Scientific and Technical Support to NPWS for the Conservation, Restoration and Monitoring of Blanket BogsCT2148/2026 SERVICES – TENDER FOR THE PROVISION OF CONSULTANCY SERVICES ON GREENHOUSE GAS AND AIR QUALITY NATIONAL EMISSION INVENTORIES
Department of ContractsFlorianaDeadline: Oct 01SERVICES – TENDER FOR THE PROVISION OF CONSULTANCY SERVICES ON GREENHOUSE GAS AND AIR QUALITY NATIONAL EMISSION INVENTORIESNRA for Forest Biomass under RED III 2026
Sustainable Energy Authority of IrelandDublinThe Services comprise the development of Ireland’s first National Risk Assessment (NRA) for forest biomass under RED III. The NRA will provide a national-level, risk-based framework to demonstrate compliance with EU sustainability criteria, reduce certification costs, and support Ireland’s climate and energy targets. This competition is made up of four (4) Work Packages (WPs) with Work Package 4 being for Optional Services which may or may not be availed of at SEAI’s discretion. For further information please see Request for Tender at www.etenders.gov.ie.Handlungskonzept Klimaanpassung im historischen Grünring Alt-Neustadt
Stadt Brandenburg an der Havel - Zentrale VergabestelleBrandenburg an der HavelDeadline: Sep 18Gegenstand der Leistung ist die Erstellung eines Handlungskonzeptes zur Klimaanpassung für die denkmalgeschützten Garten- und Parkanlagen des historischen Grünrings Alt-Neustadt in Brandenburg an der Havel. Die Leistung umfasst die Grundlagenermittlung sowie Bestandserfassung und Schadensanalyse, die Bewertung der Vulnerabilität und klimabedingter Wirkungszusammenhänge sowie die Entwicklung eines Priorisierungssystems. Darauf aufbauend sind ein Leitbild und ein integriertes, denkmalgerechtes Maßnahmenkonzept einschließlich Maßnahmenkatalog, Umsetzungsprioritäten und überschlägiger Kostenschätzungen zu erarbeiten. Die Ergebnisse sind in einem fortschreibungsfähigen Handlungskonzept zusammenzuführen.Regionalverband FrankfurtRheinMain - Natura 2000-Verträglichkeitsprüfungen im Rahmen der Neuaufstellung des RPS/RegFNP
Regionalverband FrankfurtRheinMainFrankfurt am MainDeadline: Aug 30Regionalverband FrankfurtRheinMain - Natura 2000-Verträglichkeitsprüfungen im Rahmen der Neuaufstellung des RPS/RegFNP Natura 2000-Verträglichkeitsprüfungen von flächennutzungsplanbezogenen Darstellungen nach § 5 Abs. 2 BauGB im Rahmen der Neuaufstellung des RPS/RegFNP Regionalverband FrankfurtRheinMain - Natura 2000-Verträglichkeitsprüfungen im Rahmen der Neuaufstellung des RPS/RegFNP Der Regionalverband FrankfurtRheinMain (Körperschaft des öffentlichen Rechts) ist gemäß § 8 Abs. 1 MetropolG (Gesetz über die Metropolregion Frankfurt/Rhein-Main) für die Aufstellung des Flächennutzungsplans für das Gebiet des Ballungsraumes Frankfurt/Rhein-Main zuständig. Derzeit wird der Regionalplan Südhessen/Regionale Flächennutzungsplan für den Ballungsraum Frankfurt/Rhein-Main (RPS/RegFNP) gemeinsam mit dem Regierungspräsidium Darmstadt neu aufgestellt. Im Rahmen dieser Neuaufstellung ist eine Überprüfung der flächennutzungsplanbezogenen Darstellungen auf ihre Verträglichkeit mit der Natura 2000-Gebietskulisse erforderlich. Der Auftraggeber beabsichtigt die Beauftragung von Natura 2000-Verträglichkeitsprüfungen für die flächennutzungsplanbezogenen Darstellungen nach § 5 Abs. 2 BauGB des in Aufstellung befindlichen Regionalen Flächennutzungsplans (RegFNP) für den Ballungsraum Frankfurt/Rhein-Main. Die Prüfung umfasst insgesamt 400 Prüffälle als Festpreisleistung sowie bis zu 100 weitere Prüffälle als optionale Leistung. Die Leistung umfasst insbesondere folgende Arbeitsschritte: - Zusammenstellen der zu verwendenden Datengrundlagen, - Validierung und Aufbereitung der Datengrundlagen, - Betroffenheitsanalyse, - Bewertung, - Vermeidungsmaßnahmen, - Empfehlungen für die bauleitplanerische Abwägung, sowie - Dokumentation. Eine detaillierte Leistungsübersicht über die Arbeitsschritte entnehmen Sie der Anlage 3 zum Dienstleistungsvertrag. Ziel ist die Prüfung, ob die flächennutzungsplanbezogenen Darstellungen des RegFNP zu erheblichen Beeinträchtigungen der Erhaltungsziele bzw. der für den Schutzzweck maßgeblichen Bestandteile der Natura 2000-Gebiete führen können. Der Auftraggeber verfolgt insbesondere: - eine rechtssichere und fachlich fundierte Bewertung der Natura 2000-Verträglichkeit - fachgutachterliche Empfehlungen für jede Planfläche (Verträglichkeit / Flächenanpassung / Planverzicht) - eine vollständige GIS-basierte Dokumentation der Prüfergebnisse - belastbare Ergebnisse für die bauleitplanerische Abwägung und das Planaufstellungsverfahren - die Einhaltung der Vorgaben der FFH-Richtlinie (92/43/EWG) und der Vogelschutzrichtlinie (2009/147/EG). Im Übrigen siehe Vergabeunterlagen, insbesondere Leistungsverzeichnis und Dienstleistungsvertrag nebst Anlagen.Artenschutzrechtliche Prüfung Stufe II, RS1 BA A2
Stadt BochumBochumDeadline: Sep 29Beauftragt wird die Erstellung einer Artenschutzrechtlichen Prüfung der Stufe II inklusive faunistischer Kartierung sowie einer vorgeschalteten Habitatbaumkartierung für den Bauabschnitt A2 des Radschnellwegs RS1 zwischen Darpestraße und Gahlensche Straße (Trassenführung entlang der ehemaligen Rheinischen Bahntrasse mit Anschluss an die Gahlensche Straße).Nature-based Solutions Catchment Management Plan - Hollyford, Co. Tipperary
Office of Public Works (OPW)TrimDeadline: Sep 25The provision of Nature-based Solutions Catchment Management (NbS-CM) Plan for the area upstream of Hollyford, focusing on four key deliverables: developing a targeted suite of NbS to reduce flood risk and improve water quality (Section 3.7 of the Project Brief), matching these measures with appropriate funding streams (Farming for Water EIP, OPW schemes), creating a practical implementation and maintenance guide (Section 3.8 of the Project Brief), and assesing, developing and conducting a rigorous, comprehensive cost-benefit analysisDevelopment of a green corridor project and street design training in Dakar
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 28Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.Messung und Analyse halogenierter Kohlenwasserstoffverbindungen an der Messstation Zugspitze
UmweltbundesamtDessau-RoßlauDeadline: Sep 11Ziel des Projektes ist die fachliche Unterstützung des Umweltbundesamtes bei der Einrichtung, Inbetriebnahme, dem Anlaufbetrieb sowie der wissenschaftlich-technischen Etablierung eines MEDUSA-Messsystems zur kontinuierlichen Bestimmung langlebiger klimawirksamer halogenierter Spurengase (insbesondere FCKW) an der GAW-Station Zugspitze. . Der Auftragnehmende erbringt seine Leistungen unterstützend und begleitend in enger Abstimmung mit dem Auftraggeber. Die Verantwortung für den Messbetrieb verbleibt beim Umweltbundesamt. Der Auftragnehmende übernimmt insbesondere unterstützende Tätigkeiten in folgenden Bereichen: - Unterstützung bei der Installation und Inbetriebnahme des MEDUSA-Systems - Unterstützung bei der Konfiguration der Hard- und Software einschließlich der Aus-wertesoftware GCWerks gemäß AGAGE-Standards - Unterstützung bei der Bereitstellung und Implementierung geeigneter Kalibrier- und Referenzstandards für den kontinuierlichen Messbetrieb - fachliche Begleitung der Anlaufphase - Unterstützung bei der wissenschaftlichen Auswertung und Einordnung der quali-tätsgesicherten Messdaten. . Ziel ist es, gemeinsam mit dem Auftraggeber einen stabilen, qualitätsgesicherten und AGAGE-kompatiblen Betrieb des MEDUSA-Systems an der GAW-Station Zugspitze zu etablieren und zugleich einen nachhaltigen Kompetenzaufbau beim Stationspersonal zu gewährleisten.Die näheren fachlichen Einzelheiten sind der Leistungsbeschreibung zu entnehmen.National firm to conduct baseline surveys and develop waste reduction plan
UNDPJordanDeadline: Sep 01UNDP is seeking a 01 National Firm to carry out baseline surveys on domestic solid waste and develop roadmap to reduce single-use plastic waste in Quang Ninh province for the Scaling Multi-Stakeholder Partnerships (SMSP) for Circular and Sustainable Waste Management (Phase III project), as described in this documentation. Women-owned companies are encouraged to bid. Preference will be given to equally technically qualified women. The overall objective of the assignment is to establish a comprehensive baseline on municipal solid waste (MSW) and single-use plastic (SUP) management in Quang Ninh province, to support development of evidence-based provincial planning on solid waste management and single-use plastic reduction. The baseline information is not limited to municipal solid waste generation, segregation, collection, recycling and treatment systems, and single-use plastic waste generation and consumption patterns. Besides, this assignment also provides composition of DSW in the 3 selected wards, Uong Bi, Yen Tu and Hiep Hoa, by a study on waste analysis and characterization (WACS), which will serve as baseline to develop the plan for waste sorting at source at the localities. Please indicate whether you intend to submit a bid by creating a draft response without submitting directly in the system. This will enable the system to send notifications in case of amendments of the tender requirements. Should you require further clarifications, kindly communicate using the messaging functionality in the system. For more guidance, please refer to the Instruction to submit the Bid as attached. Should you require further clarifications, kindly communicate using the messaging functionality in the system. Offers must be submitted directly in the system following this link: http://supplier.quantum.partneragencies.org using the profile you may have in the portal. In case you have never registered before, you can register a profile using the registration link shared via the procurement notice and following the instructions in guides available in UNDP website: https://www.undp.org/procurement/business/resources-for-bidders. YOU ARE ADVISED TO CONTACT UNDP PROCUREMENT UNIT([email protected]) TO CHECK IF YOU ARE HAVING A PROFILE IN THE SYSTEM. Do not create a new profile if you already have one. Use the forgotten password feature in case you do not remember the password or the username from previous registration or contact UNDP focal point to check if you have a profile yet. Any request for clarification of solicitation documents must be sent directly in the system through message functionality. ATTENTION: PROPOSALS (OR ANY PART OF IT) SHALL NOT BE SUBMITTED IN THIS MESSAGING MANNER.Search for the specific tender using search filters and subscribe to the tender in order to get notifications in case of amendments of the tender document. If you need support with the online system, you can contact the contact details of this tender as indicated in the solicitation document. UNDP Viet Nam Procurement Unit
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 23. September 2026.
- Who is the contracting authority?
- The contracting authority is Environmental Protection Agency.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.