ÖBB-Infrastruktur AGWienTED
(ProVia-ID 147934) Generalsanierung 110kV BSL UW Riedau - UW Attnang und BSL Einbindung UW St. Johann Neu; Leitungsbauarbeiten
Generalsanierung 110kV BSL UW Riedau - UW Attnang, mit 23 Masten BSL Einbindung UW St. Johann Neu, mit 4 Masten
Pipeline Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- ÖBB-Infrastruktur AG
- Published:
- June 16, 2026
- Deadline:
- Not specified
- Topic:
- Pipeline Construction
- Object:
- Stromnetz / Hochspannungsleitung
Object classification
- Stromnetz / HochspannungsleitungPrimary
Tender description
Generalsanierung 110kV BSL UW Riedau - UW Attnang, mit 23 Masten BSL Einbindung UW St. Johann Neu, mit 4 Masten
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock2 details capturedBidders and contractors · Address
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10(ProVia-ID 146023) UW Rekawinkel; Neuerrichtung, Pilotanlage 110kV-GIS-Schaltanlage; UW Rekawinkel - Elektrotechnischer Anlagenbau
ÖBB-Infrastruktur AGWienErrichtung einer 110-kV-GIS-Anlage, Metallgeschottete 15-kV-Anlage mit integriertem Warten-/Gerüstraum, 110-kV-Freiluftschaltanlage mit zwei 110-/15-kV-Umspannern, 15-kV-Schaltgerüst mit Kabelkollektor und allen erforderlichen NebeneinrichtungenL424 110-kV-Ltg. Winkeln - Mörschwil, Kabelrohrblock
Axpo Grid AGBadenDeadline: Jul 30Bau einer 650 m langen, doppelsträngigen 110-kV-Kabelrohrblockanlage zwischen den neuen Masten 10A/10B und Mast 16N, inkl. 3 Mastfundamente. Anschluss an eine Spülbohrung unter der SBB (Spülbohrung nicht Teil dieser Ausschreibung). Hauptarbeiten: Installation und Erschliessung. Offener Grabenbau, ergänzt durch Spülbohrung zur Querung des SBB-Trasses. Abschirmung des Kabelrohrblocks im Bereich des Kinderspielplatzes.CABLE PLOUGHING - STRENGLÖGN -Vatnshamrar að Seleyri - Vesturland
RARIK ohf.ReykjavíkDeadline: Jun 19The project comprises one work site; however, the cable installation is divided into two sections: firstly, a new main distribution cable installation and secondly, a cable intended to replace the existing overhead line. One pad-mounted substation shall be installed along the route. The scope of works includes installation of: six (6) single-core 1x240 mm² 36 kV high-voltage cables over approximately 10 km; and three (3) 150 mm² 24 kV high-voltage cables over approximately 7 km. Accordingly, a total of six to seven (6–7) cables shall be simultaneously ploughed and installed in parallel over an approximately 10 km section. The Purchaser also requests installation of fibre optic ducting in parallel with the works. It is anticipated that the works will commence on 10 August 2026 and be completed within 10 weeks thereafter. The commencement date may be delayed should the cables not arrive in Iceland in due time. In such event, the contract period shall be extended correspondingly to reflect the delay.Erkenningsregeling EU-401 Lijnen - Qualification system EU-401 Overhead Lines
TenneT TSO B.V.ArnhemDeadline: Jul 25TenneT richtet eine Erkennungsregelung ein, um eine Liste geeigneter Auftragnehmer für Tiefbau-, Leiter- und Montagearbeiten an neuen und bestehenden Hochspannungsleitungen ab 110 kV zu erstellen. Die Ausschreibung erfolgt ausschließlich digital über die Mercell Source-to-Contract-Plattform.Heinrich-Hertz-Str. 21 Trasse West
Stadtwerke Erkrath GmbHDeadline: Jul 13Tiefbauarbeiten für Kabeltrassen, Verlegung von Schutzrohren, Kabelverlegung, Montage von 10 kV Muffen und EndverschlüssenHeinrich-Hertz-Str. 21 Trasse Ost
Stadtwerke Erkrath GmbHDeadline: Jul 13Tiefbauarbeiten für Kabeltrassen, Verlegung von Schutzrohren, Kabelverlegung, Montage von 10 kV Muffen und EndverschlüssenGesamtschule Lollar, CBES - Erdarbeiten Zuleitung Stromversorgung
Landkreis Gießen - Der Kreisausschuss -GießenErdarbeiten für die Zuleitung der Stromversorgung an der Gesamtschule Lollar (CBES).CONTRACTWIJZIGING raamovereenkomst EU-301 Lijnen (Negometrix 190342 en 197070)
TenneT TSO B.V.ArnhemOphoging maximale waarde van 200.000.000 Euro in art. 5.2 raamovereenkomst EU-301 met 79.300.000 Euro.Rheinstraße/ John-Zenger-Straße Nord
Stadt Heidelberg, Tiefbauamt, Stadtbetriebe Abwasser und Stadtwerke Heidelberg Netze GmbHDeadline: Jul 14Abschnitt 1: Gewerkeübergreifende Maßnahmen Abschnitt 2: Straßenbau Rheinstraße Abschnitt 3: Straßenbau John-Zenger-Straße Nord Abschnitt 4: Kanalbau Abschnitt 5: Tief- und Leitungsbau Tiefbauarbeiten, Landschaftsgärtnerische Arbeiten, Bauarbeiten für Rohrleitungen, Fernmelde- und Stromleitungen, Bauarbeiten für AbwasserkanäleTeilverkabelung 20kV-Freileitung, Freileitungsrückbau
Stadtwerke HockenheimDeadline: Jul 07Kabelmastbau, Tiefbauarbeiten, 20 kV-Kabelverlegung Teilverkabelung 20kV-Freileitung, Freileitungsrückbau
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is ÖBB-Infrastruktur AG.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.