Tipperary Education and Training Board_1284NenaghTED
Project C1206 - Category 5 - Climate Action and Science Labs - including Gas Works at Colaiste Dun Iascaigh Eircode E21 NV38
Project C1206 Contractor Services with PSCS for Category 5 - Climate Action and Science Labs - including Gas Works at Colaiste Dun Iascaigh Cashel Road Cahir Co Tipperary E21 NV38 Roll Number 76063D
No credit card · Instant access
Content at a glance
Project C1206 Contractor Services with PSCS for Category 5 - Climate Action and Science Labs - including Gas Works at Colaiste Dun Iascaigh Cashel Road Cahir Co Tipperary E21 NV38 Roll Number 76063D
- Tender type:
- Tender
- Contracting authority:
- Tipperary Education and Training Board_1284
- Published:
- June 15, 2026
- Deadline:
- June 29, 2026
- Object:
- Schule
Object classification
- SchulePrimary
Tender description
Project C1206 Contractor Services with PSCS for Category 5 - Climate Action and Science Labs - including Gas Works at Colaiste Dun Iascaigh Cashel Road Cahir Co Tipperary E21 NV38 Roll Number 76063D
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- Tipperary Education and Training Board_1284Nenagh
S1055 - CFT 7589192 - Main Contractor (also assuming PSCS role) for a Sports Facilities Development Project at Colaiste Dun Iascaigh, Cashel Road, Cahir, Co. Tipperary, Eircode E21 NV38
Main Contractor (also assuming PSCS role) for a Sports Facilities Development Project at Colaiste Dun Iascaigh, Cashel Road, Cahir, Co. Tipperary, Eircode E21 NV38 - The Donahies Community SchoolDublinDeadline: Jun 12
Summer Works - Climate Action and Home Economics Labs - including Gas Works at Donahies Community School, Dublin 13, D13 YN77
Tenders invited for Category 5 Climate Action and Home Economics Labs including Gas Works at Donahies Community School, Dublin 13. - St Peters Special SchoolDublin 6Deadline: Jun 29
Invitation to Tender for Works - CASWS Summer Works 2026 Category 2 Climate Action and Roof Works at St Peters Special School, Orwell Road, Rathgar, Dublin 6 - Roll Number 18904U
Replacement of existing defective flat and low pitch roof areas with Climate Action works including new insulation at St Peters Special School, Orwell Road, Rathgar, Dublin 6. - St. Colman's National School (Mullingar)MullingarDeadline: May 26
St Colman's National School Climate Action Summer Works Replacement of Windows and Doors including Electric Vehicle Charging Station and Bike Rack and associated site works
Climate Action Summer Works: Replacement of external windows and doors, including electric vehicle (EV) charging station and bike rack with all associated site works at St. Colman’s National School, Bellview, Mullingar, Co. Westmeath. - Coláiste Muire BallymoteBallymoteDeadline: Jul 02
Contractor for CASWS for Refurbishment of 1no. Science Lab and 3no. storerooms at Coláiste Muire, Ballymote, Co. Sligo
This CASWS construction project comprises the strip-out, refurbishment, and fit-out of an existing science laboratory and associated storerooms, together with the installation of new laboratory furniture and the provision of a bicycle shelter at Coláiste Muire, Ballymote, Co. Sligo. The works include all associated mechanical, electrical, civil, and building works required for the successful completion of the project. Tenderers should refer to the tender documentation for full details of the project scope, requirements, specifications, and contract particulars. - Newpark Comprehensive SchoolBlackrockDeadline: Jul 13
Call for Tender for the Refurb of a Science Room under the Climate Action and Summer Works programme at Newpark Comprehensive School,Newtown Park Ave,Newtown,Blackrock Co Dublin
The Board of Management of Newpark Comprehensive School invites tenders for the refurbishment Science lab works at their school in Blackrock Co Dublin - Scoil Mhuire Community School (Clane)ClaneDeadline: Jun 16
Proposed Renovation works to Five Laboratories and Preparation Rooms at Scoil Mhuire Community School, Clane, Co. Kildare
The CASWS project consists of the complete refurbishment of 5 No. science laboratories and preparation areas including but not limited to water, electrical and gas services, furniture, floor covering etc and all associated building works measuring approximately 460m2. Included in the climate action works are a heat recovery ventilation system and insulation to the ceilings of the science rooms along with a bicycle rack to the school grounds. - Cork County CouncilCorkDeadline: Jun 26
Establishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council
Cork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer – Architectural Services (Contractor Design Specialist), including PSDP • Designer – Civil and Structural Engineering Services (Contractor Design Specialist) • Designer – Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement. - University College CorkCork
Establishment of a Single Supplier Framework of MEP Led Design Team for Small and Minor Work Process Projects at Tyndall National Institute, UCC
This Tender is to establish a Single Supplier Framework of MEP Led Design Team for Small and Minor Process Works Projects at Tyndall National Institute, UCC to whom specific tasks will be awarded on an exclusive basis based on the terms of a framework agreement, a copy of which will be issued with the tender documents. The team will comprise the following services. • Mechanical, Electrical and Process Engineering Services (MEP); • Employers Representative • Project Supervisor Design Process The Framework Agreement will be established on foot of competitive tenders received for the above services based on Notional Hours and rates for various disciplines as detailed in the Pricing Document Typically, projects will range in construction value from €5k to €3M however there may be exceptions whereby the construction value may be outside this range. The following are the higher value projects scheduled for coming years that the MEP Led Design Team may be assigned to: • Silicon Fab - Block A Scrubber Replacement • Silicon Fab - Old Training Fab conversion to Cleanroom • Silicon Fab - Refurbishment including demolition of room in subfab • Block C and Silicon Fab - Process Tool Hook Up • Old Boiler house Upgrade including Gas Stores • Waste Water Treatment - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21
Development of a green corridor project and street design training in Dakar
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 29. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Tipperary Education and Training Board_1284.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.